Home / Browse projects / Wardha, Maharashtra / Chhoriya Township - Karanja Gadge Plotting
Chhoriya Township - Karanja Gadge Plotting
RG-MH-74250 · RERA P50400016009 · Last updated on MahaRERA portal: 3 Dec 2024
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 46 months past the filed date
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Wardha registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Chhoriya Township - Karanja Gadge Plotting is a Plotted project by Niraj Santosh Chopda in Wardha, Maharashtra, registered with MahaRERA as P50400016009 on 11 Apr 2018. Possession was promised by 30 Dec 2022 and is now 46 months past that date. 31 of the 39 units on this registration are recorded sold or booked.
At a glance
Project
- NameChhoriya Township - Karanja Gadge Plotting
- TypePlotted
- Location
- Adj Surat To Nagpur Highway
- Karanja - Gadge
- Karanja
- Wardha
- 442203
- Pincode442203
- MapView location on Google Maps (as filed on RERA)
- RERA no.P50400016009
- ReraGenie IDRG-MH-74250
Builder
- NameNiraj Santosh Chopda
- Entity typeIndividual
- Other registrations1 more →
- Completed1 of 2
- No longer live1 lapsed, de-registered or revoked
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on11 Apr 2018
- Promised completion30 Dec 2022
- Revised completionNone
- BuildingsNot stated in filing
- Documents filed56 files
Current status
Figures as on 3 Dec 2024, this project's latest MahaRERA filing.
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 3 Dec 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
NA Plot Without Structure:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities17
As on 3 Dec 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 100% |
| Open Parking | No | Not applicable |
| Main Ent Gate | Yes | 100% |
| Layout Compound Wall | Yes | 100% |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Mr Kunal P Patil |
| Engineer | IMPower Projects - Mr Manish Pande |
| Chartered Accountant | Ayush S. Kankariya |
| Partner | Role in project |
|---|---|
| Niraj Santosh Chopda | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 9 Apr 2018 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 9 Apr 2018 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 9 Apr 2018 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 9 Apr 2018Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 9 Apr 2022
Documents filed56
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: Karanja Gadge Form 4.pdf | 3 Dec 2024 |
| Architect’s Certificate on Completion of Project (Form 4)File: Karanja Gadge Form 4.pdf | 26 Nov 2024 |
| Certificates of CA (Form 3)File: CA certificate for karanaja_11zon.pdf | 9 Apr 2022 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Karanja form 4 (2).pdf | 9 Apr 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Ar certificate Karanja phase 1.pdf | 17 Mar 2022 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 karanja gadge march 22.pdf | 17 Mar 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Er certificate Karanja phase 1.pdf | 17 Mar 2022 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 march 22 karanja gadge_compressed.pdf | 17 Mar 2022 |
| Certificates of CA (Form 3)File: CA certificate Karanja phase 1_compressed.pdf | 17 Mar 2022 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Karnja Gadge (March - 19).pdf | 18 Nov 2021 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Karnja Gadge (March - 20).pdf | 18 Nov 2021 |
| Certificates of CA (Form 3)File: FORM 3 Karanja Gadge Plotting_compressed.pdf | 25 Oct 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 CHHORIYA TOWNSHIP KARANJA GADGE PLOTTING PHASE 1.pdf | 15 Oct 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: SodaPDF-compressed-FORM 2 CHHORIYA TOWNSHIP KARANJA GADGE PLOTTING PHASE1_reduce.pdf | 15 Oct 2021 |
| Declaration about Commencement CertificateFile: Sold and Unsold Unventory June - 21 S.pdf | 8 Sep 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archi Certificate June - 21.pdf | 8 Sep 2021 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Certificate June - 21 SS.pdf | 8 Sep 2021 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Site Superviser Certificate - March 21 S.pdf | 8 Sep 2021 |
| Disclosure of sold/ booked inventoryFile: Sold and Unsold Unventory June - 21 S.pdf | 8 Sep 2021 |
| Certificates of CA (Form 3)File: CA Certificate June - 21 SS.pdf | 8 Sep 2021 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arch Karanja Certificate - Up to Dec 19.pdf | 6 Jul 2020 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Eng Karanja Certificate - Up to Dec 19.pdf | 6 Jul 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance Certificate - Dec - 19.pdf | 6 Jul 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance June - 19.pdf | 21 Jan 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance Certificate - Sep - 19.pdf | 21 Jan 2020 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Quality Assurance Certi Karnja Gadge Plotting Up To - March 19.pdf | 21 Jan 2020 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Karnja Gadge Archi Certificate Up To - June 19.pdf | 31 Dec 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Karanja ar certificate.pdf | 31 Dec 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Karnja Gadge Eng Certificate Up To - June 19.pdf | 31 Dec 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Karanja Eng certificate.pdf | 31 Dec 2019 |
| Certificates of CA (Form 3)File: Karnja Gadge CA Certificate Up To - June 19.pdf | 31 Dec 2019 |
| Certificates of CA (Form 3)File: Karanja CA certificate.pdf | 31 Dec 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archi Certi Karnja Gadge Plotting Up To - March 19.pdf | 30 May 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certi Karnja Gadge Plotting Up To - March 19.pdf | 30 May 2019 |
| Certificates of CA (Form 3)File: Engg Certi Karnja Gadge Plotting Up To - March 19.pdf | 30 May 2019 |
| Certificates of CA (Form 3)File: Ca Certi Karnja Gadge Plotting Up To - March 19.pdf | 30 May 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archi Certi Up To Dec - 18.pdf | 13 Feb 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certi Up To Dec - 18.pdf | 13 Feb 2019 |
| Certificates of CA (Form 3)File: CA Certi Up To Dec - 18.pdf | 13 Feb 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architect Certificate Karanja Gadge Up Sep - 18.pdf | 3 Jan 2019 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate Karanja Gadge Up Sep - 18.pdf | 3 Jan 2019 |
| Certificates of CA (Form 3)File: Ca Certificate Karanja Gadge Up Sep - 18.pdf | 3 Jan 2019 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Archi Cer Karnja Gadge Plotting Up June 18.pdf | 3 Oct 2018 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Cer Karnja Gadge Plotting Up June 18.pdf | 3 Oct 2018 |
| Certificates of CA (Form 3)File: CA Cer Karnja Gadge Plotting Up June 18.pdf | 3 Oct 2018 |
| Building plan approval or NA orderFile: Karanja Wardha-Layout.pdf | 9 Apr 2018 |
| Layout approvalFile: Karanja Wardha-Layout.pdf | 9 Apr 2018 |
| PAN CardFile: Niraj Sir Pan Card.pdf | 9 Apr 2018 |
| Copy of the legal title reportFile: serach report.pdf | 9 Apr 2018 |
| Details of encumbrancesFile: encumbrances cer.pdf | 9 Apr 2018 |
| Copy of Layout Approval (in case of layout)File: Karanja Wardha-Layout.pdf | 9 Apr 2018 |
| Building Plan Approval (IOD)File: Karanja Wardha-Layout.pdf | 9 Apr 2018 |
| Commencement Certificates / NA Order for plotted developmentFile: NA Order.pdf | 9 Apr 2018 |
| Declaration in FORM BFile: Declereation From - B.pdf | 9 Apr 2018 |
| Certificates of CA (Form 3)File: Ca Cer Karanja.pdf | 9 Apr 2018 |
| Proforma of Allotment letterFile: Karanja_ATS_Plot_19-2-2018_I.pdf | 9 Apr 2018 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Wardha
Computed across the 290+ Wardha projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 56 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep Chhoriya Township - Karanja Gadge Plotting on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Karanja - Gadge290+ in Wardha
SHRI SAMARTH DADAJI MAHARAJ NAGRI
RAJESH BHAIYALAL SAHU
SHRI NARESH JAGJIWANDAS VASANI PROPRIETOR OF S
NARESH JAGJIWANDAS VASANI
NEW SHIKSHAK COLONY
ASIF HUSSAIN
GOKUL CITY IX
SHOURYA BUILDERS AND DEVELOPERS
SAI VILLA
Shourya Realtors
Subhash Residency
Abhijit Subhash Bidkar and Amol Subhash Bi
See every Wardha project, with the district possession charts
Builder: Niraj Santosh Chopda
Niraj Santosh Chopda has 2 registrations on MahaRERA, including Chhoriya Township - Karanja Gadge Plotting and Chhoriya Township - Umrane Plotting. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Wardha district page.
Frequently asked questions
What does it mean that Chhoriya Township - Karanja Gadge Plotting shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if Chhoriya Township - Karanja Gadge Plotting is delayed beyond 30 Dec 2022?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Chhoriya Township - Karanja Gadge Plotting?
The registered promoter entity is Niraj Santosh Chopda, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Chhoriya Township - Karanja Gadge Plotting?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Chhoriya Township - Karanja Gadge Plotting?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Chhoriya Township - Karanja Gadge Plotting?
The professionals named in the filing: Architect: Mr Kunal P Patil; Engineer: IMPower Projects - Mr Manish Pande; Chartered Accountant: Ayush S. Kankariya. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Chhoriya Township - Karanja Gadge Plotting?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback