ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / CHAVAN GARDEN

Registered No litigation declared Others project

CHAVAN GARDEN

By M/S CHAVAN CONSTRUCTION

RG-MH-98552 · RERA P52100054079 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Apr 2032Possession promisedno revision filed
0 of 22Construction stages doneacross 2 buildings; furthest along: Excavation, 0%
0Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

CHAVAN GARDEN is a Others project by M/S CHAVAN CONSTRUCTION in Pune, Maharashtra, registered with MahaRERA as P52100054079 on 27 Dec 2023. Possession is promised by 1 Apr 2032.

At a glance

Project

  • NameCHAVAN GARDEN
  • TypeOthers
  • Location
    • -
    • Rui
    • Baramati
    • Pune
    • 413133
  • Pincode413133
  • RERA no.P52100054079
  • ReraGenie IDRG-MH-98552

Builder

  • NameM/S CHAVAN CONSTRUCTION
  • Entity typeOthers
  • Named personPRATAP LAXMAN CHAVAN

Key dates

this monthRegisteredDec 2023PromisedApr 2032

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Dec 2023
  • Promised completion1 Apr 2032
  • Revised completionNone
  • Buildings2 building records
  • Documents filed70 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING ANA77000
BUILDING BNA70000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Excavation, at 0%.

BUILDING A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BUILDING B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed297

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots297
Closed/Covered54
Open Space243
BuildingClosed/CoveredOpen SpaceTotal
BUILDING A21105126
BUILDING B33138171

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,295 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
MRS JANKIBAI BAPURAO SHINDERuiPune

Approvals and building plan

Sanctioning authorityBARAMATI MUNCIPAL COUNCIL
Permissible FSI15098.86
Proposed, not sanctioned9,099 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPlot No 34, Bhigwan Road, MIDC, Pencil Chowk, Baramati Jalochi Baramati - 413102

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPratap chavan
EngineerPratap chavan
Chartered AccountantCA RITESH GUJAR
Chartered AccountantHITEN GUJARATHI
PartnerRole in project
M/S CHAVAN CONSTRUCTION-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 4 Dec 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Oct 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Oct 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 4 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 1 Apr 2032

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: form1.pdf20 Apr 2026
Form 2File: form2.pdf20 Apr 2026
Form 3File: form3.pdf20 Apr 2026
Disclosure of Sold and Booked InventoryFile: soldunsold.pdf20 Apr 2026
Form 5 (FY 2024-2025)File: garden form 5.pdf21 Jan 2026
Form 1File: form1.pdf19 Jan 2026
Form 2File: form2.pdf19 Jan 2026
Form 3File: form3.pdf19 Jan 2026
Disclosure of Sold and Booked InventoryFile: soldunsold.pdf19 Jan 2026
Form 1File: form1.pdf20 Oct 2025
Form 2File: form 2.pdf20 Oct 2025
Form 3File: from 3.pdf20 Oct 2025
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf20 Oct 2025
Form 1File: form1.pdf19 Jul 2025
Form 2File: form2.pdf19 Jul 2025
Form 3File: form3.pdf19 Jul 2025
Disclosure of Sold and Booked InventoryFile: soldunsold.pdf19 Jul 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2A.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf16 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf16 Apr 2025
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf16 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form-3.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold unsold.pdf20 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf20 Oct 2024
Disclosure of sold/ booked inventoryFile: sold unsold.pdf20 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf7 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf7 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf29 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf29 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf29 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2.pdf29 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A.pdf29 Jul 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf29 Jul 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD.pdf29 Jul 2024
Declaration about Commencement CertificateFile: DocScanner 31 May 2023 1-06 pm.pdf14 Dec 2023
Copy of the legal title reportFile: search rui new_11zon.pdf4 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: commencement declaration rui_11zon.pdf4 Dec 2023
Other - TechnicalFile: garden declaration new_11zon.pdf4 Dec 2023
Details of encumbrances concerned to FinanceFile: legal encumbrance garden.pdf18 Nov 2023
Details of encumbrances concerned to LegalFile: legal encumbrance garden.pdf18 Nov 2023
Commencement Certificates / NA Order for plotted developmentFile: appendix f pdf.pdf18 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Chavan_11zon.pdf18 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 architects_compressed.pdf6 Nov 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: format A garden_compressed.pdf28 Oct 2023
Proforma of Agreement for saleFile: 7-9-23 RERA SATHKHAT RUI.pdf19 Oct 2023
Layout approvalFile: HIGHLIGHTED LAYOUT.pdf13 Oct 2023
Layout approvalFile: 1 Copy of Layout Approval (in case of layout) (2).pdf13 Oct 2023
Layout approvalFile: 2 Copy of Layout Approval (in case of layout).pdf13 Oct 2023
Building plan approvalFile: 1 Building Plan Approval _ NA Order for plotted development (1).pdf13 Oct 2023
Building plan approvalFile: 2 Building Plan Approval _ NA Order for plotted development.pdf13 Oct 2023
PAN CardFile: 1 PAN Card (1).pdf13 Oct 2023
Details of encumbrances concerned to FinanceFile: no encumbrances.pdf13 Oct 2023
Details of encumbrances concerned to LegalFile: no encumbrances.pdf13 Oct 2023
Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout) (2).pdf13 Oct 2023
Copy of Layout Approval (in case of layout)File: 2 Copy of Layout Approval (in case of layout).pdf13 Oct 2023
Copy of Layout Approval (in case of layout)File: HIGHLIGHTED LAYOUT.pdf13 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: 1 Building Plan Approval _ NA Order for plotted development (1).pdf13 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: 2 Building Plan Approval _ NA Order for plotted development.pdf13 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: COMENCEMENT CERTIFICATE - ( 2021-22 )_compressed.pdf13 Oct 2023
Declaration in FORM BFile: 1 Declaration in FORM B.pdf13 Oct 2023
CERSAI detailsFile: 1 CERSAI details.pdf13 Oct 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations (1).pdf13 Oct 2023
Proforma of Allotment letterFile: 1 Proforma of Allotment letter.pdf13 Oct 2023
Deviation Report with respect to Allotment letterFile: 1 Deviation Report with respect to Allotment letter.pdf13 Oct 2023
Deviation Report with respect to model copy of AgreementFile: 1 Deviation Report with respect to model copy of Agreement.pdf13 Oct 2023

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep CHAVAN GARDEN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near -13,700+ in Pune

Builder: M/S CHAVAN CONSTRUCTION

M/S CHAVAN CONSTRUCTION has 1 registration on MahaRERA, including CHAVAN GARDEN. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if CHAVAN GARDEN is delayed beyond 1 Apr 2032?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CHAVAN GARDEN?

The registered promoter entity is M/S CHAVAN CONSTRUCTION, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CHAVAN GARDEN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for CHAVAN GARDEN?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CHAVAN GARDEN?

The professionals named in the filing: Architect: Pratap chavan; Engineer: Pratap chavan; Chartered Accountant: CA RITESH GUJAR; Chartered Accountant: HITEN GUJARATHI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CHAVAN GARDEN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CHAVAN GARDEN. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CHAVAN GARDEN to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.