SEVEN STAR ICON

By SAMARTH ICON

RG-MH-23730 · RERA P52100079042 · Last updated on MahaRERA portal: 27 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
7 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 42%
318 of 441Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 70 documents Report an error

SEVEN STAR ICON is a Others project by SAMARTH ICON in Pune, Maharashtra, registered with MahaRERA as P52100079042 on 31 Jan 2025. Possession is promised by 31 Dec 2030. 123 of the 441 units on this registration are recorded sold or booked, and 7 of 33 construction stages are filed complete.

At a glance

Project

  • NameSEVEN STAR ICON
  • TypeOthers
  • Location
    • GADIMA ROAD
    • MIDC
    • Baramati (M Cl)
    • Baramati
    • Pune
    • 413133
  • Pincode413133
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100079042
  • ReraGenie IDRG-MH-23730

Builder

  • NameSAMARTH ICON
  • Entity typePartnership

Key dates

this monthRegisteredJan 2025PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Jan 2025
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings3 building records
  • Documents filed70 files

Current status

28%123 of 441 units booked
9.5%Work done, per cost certificate

Figures as on 27 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING CNA18168481165
WING BNA1816336295
WING ANA18168497181

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 27 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

7 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 42%.

WING C35%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure42%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks42%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING B29%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure12%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks12%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING A15%
ActivityProgress
Excavation100%
Basement (if any)40%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 27 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes15%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed3525

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots3,525
Closed/Covered3,525
BuildingClosed/CoveredTotal
WING C1,1751,175
WING B1,1751,175
WING A1,1751,175

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area8,064 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on8 Aug 2025

Approvals and building plan

Sanctioning authorityExecutive Engineer MIDC Baramati Division Baramati
Permissible FSI38880.1
Proposed, not sanctioned38,880 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTHIRD FLOOR OFFICE NO 3 YASH PRIME BUILDING PLOT NO 9 AND 11 ABOVE YAMAHA SHOWROOM JALOCHI MAHARASHTRA 413102
Estimated costRs 136.25 cr
Cost incurredRs 12.90 cr
Work done9.47%
BuildingWingEstimatedIncurred
WING CNARs 43.00 crRs 8.77 cr
WING BNARs 43.00 crRs 2.97 cr
WING ANARs 43.00 crRs 1.16 cr
-NARs 7.25 cr-

Certifying professionals and partners7

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSanket Sanas
EngineerJAYAWANT V INAMDAR
EngineerAMARSINH SADASHIV KADAM
EngineerDnyandipraje Sudhakarrao Shinde
Chartered AccountantYOGESH R DEVKAR
Chartered AccountantROHAN M SHAHA
Chartered AccountantMitali Shah
PartnerRole in project
SAMARTH ICON-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 28 Dec 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 28 Dec 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Jan 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 28 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed70

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: ARCHITECTS CERTIFICATE FORM 1 Scan2026-04-04_114422.pdf27 Apr 2026
Withdrawal Update Form 2File: Engineer Certificate Seven Star Icon.pdf27 Apr 2026
Withdrawal Update Form 3File: Q4 - From 3 - Sevenstar Icon_compressed.pdf27 Apr 2026
Withdrawal Update Form 1File: Withdrawal Application Form1_.pdf16 Jan 2026
Withdrawal Update Form 2File: Withdrawal Application Form 2_sighned.pdf16 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf16 Jan 2026
Withdrawal Update Form 1File: Architects Certificate.pdf21 Nov 2025
Withdrawal Update Form 2File: Engineeru0027s Certificate.pdf21 Nov 2025
Withdrawal Update Form 3File: Form 3 Final_compressed.pdf21 Nov 2025
Form 5 (FY 2024-2025)File: Document 2.pdf28 Sep 2025
Withdrawal Update Form 1File: Architect Certificate.pdf11 Aug 2025
Withdrawal Update Form 2File: Engineer Certificate.pdf11 Aug 2025
Withdrawal Update Form 3File: FORM 3.pdf11 Aug 2025
Form 2A (FY 2024-2025)File: Engineer's certificate for Quality Assurance .pdf8 Aug 2025
Form 1File: Architect Certificate.pdf7 Aug 2025
Form 2File: Engineer Certificate.pdf7 Aug 2025
Form 3File: FORM 3.pdf7 Aug 2025
Disclosure of Sold and Booked InventoryFile: Invent.pdf7 Aug 2025
Form 1File: 2 Architect’s Certificate of Percentage of Completion of Work (Form 1).pdf7 Aug 2025
Form 2File: 2 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf7 Aug 2025
Form 3File: 2 CA Certificate on Project Cost & Fund withdrawal (Form 3).pdf7 Aug 2025
Disclosure of Sold and Booked InventoryFile: 1 Disclosure of sold_ booked inventory.pdf7 Aug 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf8 May 2025
Disclosure of sold/ booked inventoryFile: Inventory_compressed.pdf8 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect's Certificate.pdf4 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate.pdf4 May 2025
Building plan approvalFile: 7 Wing wise Units and Type.pdf23 Jan 2025
Building plan approvalFile: 6 Comm and Resi Area.pdf23 Jan 2025
Building plan approvalFile: 5 refuge and elevation_rotated.pdf23 Jan 2025
Building plan approvalFile: 4 Resident_rotated.pdf23 Jan 2025
Building plan approvalFile: 3 Commercial_rotated.pdf23 Jan 2025
Building plan approvalFile: 2 Basements_rotated.pdf23 Jan 2025
Building plan approvalFile: 1 Layout_rotated.pdf23 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 1 Layout_rotated.pdf23 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 2 Basements_rotated.pdf23 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 3 Commercial_rotated.pdf23 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 4 Resident_rotated.pdf23 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 5 refuge and elevation_rotated.pdf23 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 6 Comm and Resi Area.pdf23 Jan 2025
Building Plan Approval / NA Order for plotted developmentFile: 7 Wing wise Units and Type.pdf23 Jan 2025
Disclosure for secured/unsecured finance availed for the projectFile: New Doc 01-11-2025.pdf11 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 to upload.pdf8 Jan 2025
Proforma of Agreement for saleFile: AFS SAMARTH ICON Final.pdf8 Jan 2025
Other - LegalFile: Asignment Deed_compressed.pdf7 Jan 2025
Other - FinanceFile: Decleration Form.pdf7 Jan 2025
Layout approvalFile: 2 Sanctioned Plan Layout B1 B2.pdf28 Dec 2024
PAN CardFile: PAN.pdf28 Dec 2024
Copy of the legal title reportFile: Search_compressed.pdf28 Dec 2024
Details of encumbrances concerned to FinanceFile: Encumbrances Legal Finanace.pdf28 Dec 2024
Copy of Layout Approval (in case of layout)File: 2 Sanctioned Plan Layout B1 B2.pdf28 Dec 2024
Proforma of Allotment letterFile: Allotment.pdf28 Dec 2024
Declaration in FORM BFile: Form B Kaygude.pdf28 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf28 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf28 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: CC.pdf28 Dec 2024
Declaration about Commencement CertificateFile: From D.pdf28 Dec 2024
CERSAI detailsFile: Cersai.pdf28 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Bank format A.pdf28 Dec 2024
Deviation Report with respect to Allotment letterFile: No Daviation Allotment.pdf28 Dec 2024
Details of encumbrances concerned to LegalFile: Encumbrances Legal Finanace.pdf28 Dec 2024
Other - TechnicalFile: Project Land_page-0001 (1).pdf28 Dec 2024
Deviation Report with respect to model copy of AgreementFile: No Daviation AFS.pdf28 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Chaudhar.pdf28 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Divekar.pdf28 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Kaygude.pdf28 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: kumbhrkar Samarth icon.pdf28 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Mokashi.pdf28 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: more Samarth icon.pdf28 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Morepatil.pdf28 Dec 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: Bank Format B.pdf28 Dec 2024

How this compares with Pune

28%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep SEVEN STAR ICON on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near MIDC13,700+ in Pune

2 kmSEVEN STAR ICONCompleted 26Lapsed / revoked 15Other 35Dot size: filed unitsN

Filed coordinates, straight-line distance. 76 registered projects within 2 km.

Builder: SAMARTH ICON

SAMARTH ICON has 1 registration on MahaRERA, including SEVEN STAR ICON. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if SEVEN STAR ICON is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of SEVEN STAR ICON?

The registered promoter entity is SAMARTH ICON, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in SEVEN STAR ICON?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for SEVEN STAR ICON?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at SEVEN STAR ICON?

The professionals named in the filing: Architect: Sanket Sanas; Engineer: JAYAWANT V INAMDAR; Engineer: AMARSINH SADASHIV KADAM; Engineer: Dnyandipraje Sudhakarrao Shinde; Chartered Accountant: YOGESH R DEVKAR; Chartered Accountant: ROHAN M SHAHA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in SEVEN STAR ICON?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About SEVEN STAR ICON. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save SEVEN STAR ICON to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.