CHATRAPATI SHIVAJI NAGAR

By VASANTA SHIVRAMJI DANGARE

RG-MH-63427 · RERA P50500053473 · Last updated on MahaRERA portal: 27 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 2 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 5 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
69 of 176Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 80 documents Report an error

CHATRAPATI SHIVAJI NAGAR is a Plotted project by VASANTA SHIVRAMJI DANGARE in Nagpur, Maharashtra, registered with MahaRERA as P50500053473 on 6 Nov 2023. Possession is promised by 31 Dec 2028. 107 of the 176 units on this registration are recorded sold or booked.

At a glance

Project

  • NameCHATRAPATI SHIVAJI NAGAR
  • TypePlotted
  • Location
    • NAGPUR ROAD
    • UMRED
    • Boribhatari (ri)
    • Nagpur
    • 441203
  • Pincode441203
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500053473
  • ReraGenie IDRG-MH-63427

Builder

  • NameVASANTA SHIVRAMJI DANGARE
  • Entity typeIndividual
  • Other registrations5 more →
  • Completed2 of 6
  • No longer live2 lapsed, de-registered or revoked
  • Declared earlier projects6 →

Key dates

this monthRegisteredNov 2023PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Nov 2023
  • Promised completion31 Dec 2028
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed80 files

Current status

61%107 of 176 units booked
48.4%Work done, per cost certificate

Figures as on 27 May 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 27 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 27 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes55%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes40%
Storm Water DrainsYes50%
Landscaping & Tree PlantingYes50%
Street LightingYes45%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceYes40%
Open ParkingNoNot applicable

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area46,600 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 Jul 2025

Approvals and building plan

Permissible FSI25908.42
Proposed, not sanctioned25,908 sq m

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchUMRED
Estimated costRs 2.00 cr
Cost incurredRs 96.78 lakh
Work done48.39%
BuildingWingEstimatedIncurred
-NARs 2.00 crRs 96.78 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectANK ENGINEERS AND CONSULTANTS
EngineerANK ENGINEERS AND CONSULTANTS
Chartered AccountantSHARMA MUKEWAR & CO
Chartered AccountantAnubhav Asati
PartnerRole in project
VASANTA SHIVRAMJI DANGARE-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Aug 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 8 Jul 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 16 Oct 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Sep 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2028

Documents filed80

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 (Mar-26).pdf27 May 2026
Withdrawal Update Form 2File: Form 2 (Mar-26).pdf27 May 2026
Withdrawal Update Form 3File: Form 3 (Mar-26).pdf27 May 2026
Form 2A (FY 2025-2026)File: Form 2A (FY 2025-26).pdf27 May 2026
Form 5 (FY 2025-2026)File: Form 5 (FY 2025-26).pdf27 May 2026
Withdrawal Update Form 1File: Form 1 (Dec-25).pdf26 May 2026
Withdrawal Update Form 1File: Form 1 (Dec-25).pdf26 May 2026
Withdrawal Update Form 2File: Form 2 (Dec-25).pdf26 May 2026
Withdrawal Update Form 2File: Form 2 (Dec-25).pdf26 May 2026
Withdrawal Update Form 3File: Form-3 (Sep-2025).pdf26 May 2026
Withdrawal Update Form 3File: Form 3 (Dec-25).pdf26 May 2026
Withdrawal Update Form 1File: Form-2 (Sep-2025).pdf15 May 2026
Withdrawal Update Form 2File: Form-2 (Sep-2025).pdf15 May 2026
Withdrawal Update Form 3File: Form-3 (Sep-2025).pdf15 May 2026
Withdrawal Update Form 1File: Fom-1 (June-2025).pdf13 May 2026
Withdrawal Update Form 2File: Form-2 (June-2025).pdf13 May 2026
Withdrawal Update Form 3File: Form 3 June 25 Final.pdf13 May 2026
Withdrawal Update Form 1File: Fom-1 (June-2025).pdf6 Feb 2026
Withdrawal Update Form 2File: Form-2 (June-2025).pdf6 Feb 2026
Withdrawal Update Form 3File: Form 3 June 25 Final.pdf6 Feb 2026
Withdrawal Update Form 1File: Fom-1 (June-2025).pdf5 Feb 2026
Withdrawal Update Form 1File: Fom-1 (June-2025).pdf5 Feb 2026
Withdrawal Update Form 2File: Form-2 (June-2025).pdf5 Feb 2026
Withdrawal Update Form 2File: Form-2 (June-2025).pdf5 Feb 2026
Withdrawal Update Form 3File: Form 3 June 25 Final.pdf5 Feb 2026
Withdrawal Update Form 3File: Form 3 June 25 Final.pdf5 Feb 2026
Form 1File: Form 1 Shivaji.pdf18 Jul 2025
Form 2File: Form 2 Shivaji.pdf18 Jul 2025
Form 3File: Form 3 Shivaji Nagar.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Inventory Shivaji Nagar.pdf18 Jul 2025
Self-declaration of Quarterly ProgressFile: Self Declaration Shivaji.pdf18 Jul 2025
Form 2A (FY 2024-2025)File: Form 2A Shivaji.pdf18 Jul 2025
Form 5 (FY 2024-2025)File: Form 5 Shivaji Nagar.pdf18 Jul 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate.pdf12 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form _3.pdf12 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate.pdf12 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 QTr June Shivaji Ngr.pdf19 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Qrt June Shivaji Ngr.pdf19 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Qtr June Shivaji Ngr.pdf19 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Qtr Sep Shivaji Ngr.pdf19 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Qtr Sep Shivaji Ngr.pdf19 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Qtr Sep Shivaji Ngr.pdf19 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 QTr June Shivaji Ngr.pdf19 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Qtr Sep Shivaji Ngr.pdf19 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Qtr June Shivaji Ngr.pdf19 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Qtr Sep Shivaji Ngr.pdf19 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Qrt June Shivaji Ngr.pdf19 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Qtr Sep Shivaji Ngr.pdf19 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Shivaji.pdf31 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Shivaji.pdf31 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Shivaji.pdf31 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Shivaji.pdf31 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Shivaji.pdf31 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_compressed.pdf20 Jan 2024
Other - TechnicalFile: MAIL - Screenshot.pdf27 Oct 2023
Building plan approval or NA orderFile: NA ORDER.pdf16 Oct 2023
Building Plan Approval / NA Order for plotted developmentFile: NA ORDER.pdf16 Oct 2023
Other - TechnicalFile: Letter to MahaRERA.pdf16 Oct 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate-Umred.pdf21 Sep 2023
Copy of the legal title reportFile: Legal Title Report.pdf5 Aug 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Ann A.pdf5 Aug 2023
Details of encumbrances concerned to FinanceFile: Encumbrances-Legal.pdf18 Jul 2023
Details of encumbrances concerned to LegalFile: Encumbrances-Legal.pdf18 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3-1_compressed.pdf14 Jul 2023
Layout approvalFile: Sanction Map1.pdf8 Jul 2023
PAN CardFile: PAN Card.pdf8 Jul 2023
Details of encumbrances concerned to FinanceFile: No Finance.pdf8 Jul 2023
Details of encumbrances concerned to LegalFile: No Finance.pdf8 Jul 2023
Copy of Layout Approval (in case of layout)File: Sanction Map1.pdf8 Jul 2023
Declaration about Commencement CertificateFile: COMMENCEMENT CERTIFICATE.pdf8 Jul 2023
Declaration in FORM BFile: Affidavit FORM B.pdf8 Jul 2023
CERSAI detailsFile: CERSAI_Search_Report_200273800429_For_Asset_Based_Search_08_07_2023_09_12_53_631.pdf8 Jul 2023
Proforma of Agreement for saleFile: MODEL FORM OF AGREEMENT TO SALE.pdf8 Jul 2023
Proforma of Allotment letterFile: FORM OF ALLOTMENT LETTER.pdf8 Jul 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT A.pdf8 Jul 2023
Deviation Report with respect to Allotment letterFile: DEVIATION-Allotment Letter.pdf8 Jul 2023
Deviation Report with respect to model copy of AgreementFile: DEVIATION-AOS.pdf8 Jul 2023

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 delivered on promise
ProjectLocationStatusPromisedDelivered
PARADISE CITYMAUZA BELGAON TEHSIL UMREDCompletedJun 2022Jun 2022
SHIVKASHIPURAMUMREDCompletedDec 2021Dec 2021

How this compares with Nagpur

61%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep CHATRAPATI SHIVAJI NAGAR on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near UMRED2,800+ in Nagpur

2 kmCHATRAPATI SHIVAJI NAGARCompleted 6Lapsed / revoked 3Other 14Dot size: filed unitsN

Filed coordinates, straight-line distance. 23 registered projects within 2 km.

Builder: VASANTA SHIVRAMJI DANGARE

VASANTA SHIVRAMJI DANGARE has 6 registrations on MahaRERA, including SHIVKASHIPURAM and PARADISE CITY. Its filings disclose 6 earlier MahaRERA projects: declares 5 of 5 past projects completed on time. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if CHATRAPATI SHIVAJI NAGAR is delayed beyond 31 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CHATRAPATI SHIVAJI NAGAR?

The registered promoter entity is VASANTA SHIVRAMJI DANGARE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CHATRAPATI SHIVAJI NAGAR?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for CHATRAPATI SHIVAJI NAGAR?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CHATRAPATI SHIVAJI NAGAR?

The professionals named in the filing: Architect: ANK ENGINEERS AND CONSULTANTS; Engineer: ANK ENGINEERS AND CONSULTANTS; Chartered Accountant: SHARMA MUKEWAR & CO; Chartered Accountant: Anubhav Asati. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CHATRAPATI SHIVAJI NAGAR?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CHATRAPATI SHIVAJI NAGAR. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CHATRAPATI SHIVAJI NAGAR to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.