Home / Browse projects / Raigarh, Maharashtra / CHANDRADARSHAN VIHAR
CHANDRADARSHAN VIHAR
RG-MH-41797 · RERA P52000048312 · Last updated on MahaRERA portal: 28 Feb 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves.
See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
CHANDRADARSHAN VIHAR is a Residential / Group Housing project by RETHRAJ REALTY LLP in Raigarh, Maharashtra, registered with MahaRERA as P52000048312 on 26 Dec 2022. Possession is promised by 31 Dec 2027. 22 of the 44 units on this registration are recorded sold or booked, and 7 of 11 construction stages are filed complete.
At a glance
Project
- NameCHANDRADARSHAN VIHAR
- TypeResidential / Group Housing
- Location
- ROHA
- Roha Ashtami (M Cl)
- Raigarh
- 402109
- Pincode402109
- RERA no.P52000048312
- ReraGenie IDRG-MH-41797
Builder
- NameRETHRAJ REALTY LLP
- Entity typePartnership
- PartnersSUNNY RAJENDRA JAIN, NIRMALA SAMPATLAL KOTHARI, SAGARMAL MOOLCHAND JAIN, RAJ PRAKASH JAIN, CHIRAG BHERULAL KOTHARI, ROHIT RAJENDRA SAMAR, BHARATKUMAR SHANKARLAL DHAKAD, MADHU VIKAS BAPNA, HASTIMAL PUKHRAJJI MEHTA
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on26 Dec 2022
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed53 files
Current status
Figures as on 28 Feb 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| CHANDRADARSHAN VIHAR | NA | 7 | 7 | 41 | 3 | 44 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 28 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
7 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 60%.
CHANDRADARSHAN VIHAR: 80% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 60% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 60% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 30% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 30% |
Progress on shared amenities15
As on 28 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 50% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 50% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed35
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | ANGELS CONSULTANTS |
| Engineer | MANDAR A NADGAUNDI |
| Chartered Accountant | RUTUJA SAJJAN NARSINGH |
| Chartered Accountant | RONAK A JAIN |
| Partner | Role in project |
|---|---|
| RETHRAJ REALTY LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 25 Nov 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 5 Aug 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 19 Nov 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 5 Aug 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed53
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Chandradarshan Vihar as on 31st March 2023.pdf | 28 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Chandradarshan Vihar as on March 2024.pdf | 28 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Chandradarshan Vihar as on 30th June 2024.pdf | 28 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Chandradarshan Vihar as on 30th September 2024.pdf | 28 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Chandradarshan Vihar as on 31st December 2024.pdf | 28 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Chandradarshan Vihar as on 31st March 2023.pdf | 28 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 CA Certificate on Project Cost Fund withdrawal (Form 3).pdf | 28 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Chandradarshan Vihar as on 30th June 2024.pdf | 28 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Chandradarshan Vihar as on 30th September 2024.pdf | 28 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Chandradarshan Vihar as on 31st December 2024.pdf | 28 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Chandradarshan Vihar as on 31st March 2023.pdf | 28 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf | 28 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Chandradarshan Vihar as on 30th June 2024.pdf | 28 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Chandradarshan Vihar as on 30th September 2024.pdf | 28 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - Chandradarshan Vihar as on 31st December 2024.pdf | 28 Feb 2025 |
| Layout approvalFile: Plans.pdf | 5 Aug 2024 |
| Copy of Layout Approval (in case of layout)File: Plans.pdf | 5 Aug 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: ACE Scanner_2024_06_05(1)_11zon.pdf | 5 Aug 2024 |
| Declaration about Commencement CertificateFile: Format D.pdf | 5 Aug 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 2024.pdf | 5 Aug 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 2024.pdf | 5 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A FY 2022-23.pdf | 5 Aug 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A FY 2023-24.pdf | 5 Aug 2024 |
| Disclosure of sold/ booked inventoryFile: Circular 29_March_2024.pdf | 5 Aug 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_March_2024.pdf | 5 Aug 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: form 5 FY 2022-2023_compressed.pdf | 5 Aug 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 FY 2023-2024_compressed.pdf | 5 Aug 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: Extension of CC.pdf | 16 Dec 2022 |
| Details of encumbrances concerned to FinanceFile: No encumbearance Adv.pdf | 15 Dec 2022 |
| Details of encumbrances concerned to LegalFile: No encumbearance Adv.pdf | 15 Dec 2022 |
| Declaration in FORM BFile: Final Form B Sunny.pdf | 15 Dec 2022 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final Form 3.pdf | 15 Dec 2022 |
| Other - FinanceFile: No Encrumberances Certificate.pdf | 1 Dec 2022 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: No encumberance for bank ac.pdf | 30 Nov 2022 |
| Copy of the legal title reportFile: Legal title report 109.pdf | 25 Nov 2022 |
| Copy of the legal title reportFile: Legal title report 110.pdf | 25 Nov 2022 |
| Proforma of Agreement for saleFile: Agreement for Sale-1-9_11zon.pdf | 25 Nov 2022 |
| Proforma of Agreement for saleFile: Agreement for Sale-10-17_11zon.pdf | 25 Nov 2022 |
| Proforma of Allotment letterFile: allotment letter new.pdf | 25 Nov 2022 |
| Deviation Report with respect to Allotment letterFile: No encumberance for allotment.pdf | 25 Nov 2022 |
| Deviation Report with respect to model copy of AgreementFile: No encumberance for agreement for sale.pdf | 25 Nov 2022 |
| Layout approvalFile: Copy of Layout approval_11zon.pdf | 19 Nov 2022 |
| Building plan approvalFile: Copy of Building approval.pdf | 19 Nov 2022 |
| PAN CardFile: Firm Pan.pdf | 19 Nov 2022 |
| Details of encumbrances concerned to FinanceFile: No Encrumberances Certificate.pdf | 19 Nov 2022 |
| Details of encumbrances concerned to LegalFile: No Encrumberances Certificate.pdf | 19 Nov 2022 |
| Copy of Layout Approval (in case of layout)File: Copy of Layout approval_11zon.pdf | 19 Nov 2022 |
| Building Plan Approval / NA Order for plotted developmentFile: Copy of Building approval.pdf | 19 Nov 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: CC_Rethraj_11zon.pdf | 19 Nov 2022 |
| Declaration about Commencement CertificateFile: Declaration about CC.pdf | 19 Nov 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form 1_11zon.pdf | 19 Nov 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form 2_11zon.pdf | 19 Nov 2022 |
| CERSAI detailsFile: Cersai Report.pdf | 19 Nov 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Raigarh
Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.
Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- All 53 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep CHANDRADARSHAN VIHAR on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near ROHA5,900+ in Raigarh
Roha Mega City Phase IIA-B
Roha Mega CIty Developers LLP
Roha Mega City phase III
Roha Mega City Developers LLP
DAMANI HEIGHTS
ADHYA BUILDERS AND DEVELOPERS
Harbour City Sector-III
Garva Land Deal Private Limited
HECC-SAI CITY
LIYAKAT ANWAR HAFIZ
Harbour City Sector-I
Garva Land Deal Private Limited
See every Raigarh project, with the district possession charts
Builder: RETHRAJ REALTY LLP
RETHRAJ REALTY LLP has 1 registration on MahaRERA, including CHANDRADARSHAN VIHAR. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Raigarh district page.
Frequently asked questions
What are my rights if CHANDRADARSHAN VIHAR is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of CHANDRADARSHAN VIHAR?
The registered promoter entity is RETHRAJ REALTY LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in CHANDRADARSHAN VIHAR?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for CHANDRADARSHAN VIHAR?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at CHANDRADARSHAN VIHAR?
The professionals named in the filing: Architect: ANGELS CONSULTANTS; Engineer: MANDAR A NADGAUNDI; Chartered Accountant: RUTUJA SAJJAN NARSINGH; Chartered Accountant: RONAK A JAIN. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in CHANDRADARSHAN VIHAR?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback