Home / Browse projects / Wardha, Maharashtra / CHANDAN NAGAR
CHANDAN NAGAR
By NARENDRA SONULE & 3 OTHERS RAMESH SONULE
RG-MH-00039 · RERA P50400026300 · Last updated on MahaRERA portal: 19 Feb 2025
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- Completion date moved by 39 months
- 2 extensions taken
Clear
- No litigation declared
- No complaints on record
- Separate project account declared
- Allotment letter follows the model form
4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Wardha registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
CHANDAN NAGAR is a Plotted project by NARENDRA SONULE & 3 OTHERS RAMESH SONULE in Wardha, Maharashtra, registered with MahaRERA as P50400026300 on 7 Sep 2020. Possession was promised by 31 Dec 2025 and is now 10 months past that date. The completion date has moved by 39 months from the original filing. 13 of the 27 units on this registration are recorded sold or booked.
At a glance
Project
- NameCHANDAN NAGAR
- TypePlotted
- Location
- SURVEY NO 6 DHOTRA KASAR WARDHA 442304
- DHOTRA KASAR
- Dhotra (534164)
- Wardha
- 442304
- Pincode442304
- RERA no.P50400026300
- ReraGenie IDRG-MH-00039
Builder
- NameNARENDRA SONULE & 3 OTHERS RAMESH SONULE
- Entity typeIndividual
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on7 Sep 2020
- Promised completion31 Dec 2025
- Revised completionRevised to 31 Dec 2025 (originally 30 Sep 2022)
- BuildingsNot stated in filing
- Documents filed67 files
Current status
Figures as on 19 Feb 2025, this project's latest MahaRERA filing.
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 19 Feb 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
NA Plot Without Structure:
| Activity | Progress |
|---|---|
| Excavation | Not applicable |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | Not applicable |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | Not applicable |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | Not applicable |
| Sanitary Fittings within the flats / premises | Not applicable |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | Not applicable |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | Not applicable |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | Not applicable |
Progress on shared amenities18
As on 19 Feb 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | No | Not applicable |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | No | Not applicable |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | No | Not applicable |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
| ENTRACE GATE | Yes | 100% |
| CORNER POOL | Yes | 100% |
| COMPOUND WALL | Yes | 100% |
Land and ownership
MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | BHUPENDRA BELKAIYA |
| Architect | ROHIT RATHI |
| Engineer | BHUPENDRA BELKAIYA |
| Engineer | AJAY RATHI |
| Chartered Accountant | DARSHAN WAKHARIYA |
| Partner | Role in project |
|---|---|
| NARENDRA SONULE & 3 OTHERS RAMESH SONULE | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterExisting Promoter (Ramesh Sonule) died on 20/04/2021, and he was a farmer , thereafter projects rights and liabilities change by succession in our name , hence to understand the project situation and to complete the project we request you to grant project extention up to 31/12/2025. We assure you all the pending works will be completed by us within extended period of time.
Reason as filed by the promoterDEATH OF PROMOTER
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 1 Sep 2020 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 1 Sep 2020 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 3 Sep 2020 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 1 Sep 2020Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 19 Feb 2025
Documents filed67
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 FORM 1 310324.pdf | 19 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 FORM 1 300624.pdf | 19 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 FORM 1 300924.pdf | 19 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 FORM 1 311224.pdf | 19 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 FORM 1 311223.pdf | 19 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 FORM 3 311223.pdf | 19 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 FORM 3 310324.pdf | 19 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 FORM 3 300624.pdf | 19 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 FORM 3 300924.pdf | 19 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5 FORM 3 311224.pdf | 19 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 FORM 2 310324.pdf | 19 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 FORM 2 311224.pdf | 19 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 FORM 2 300924.pdf | 19 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 FORM 2 300624.pdf | 19 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 1 FORM 2 311223.pdf | 19 Feb 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: from 4.pdf | 19 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: 1 sold inventory date 31 12 2023.pdf | 19 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: 3 sold inventory date 30 6 2024.pdf | 19 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: 4 sold inventory date 30 9 2024.pdf | 19 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: 5 sold inventory date 31 12 2024.pdf | 19 Feb 2025 |
| CERSAI detailsFile: 2 sold inventory date 31 3 2024.pdf | 19 Feb 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A 310324.pdf | 19 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 2324.pdf | 19 Feb 2025 |
| Architect’s Certificate on Completion of Project (Form 4)File: Form 4 Date 15_12_2024.pdf | 27 Dec 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: completion certificate_ Sonule.pdf | 27 Dec 2024 |
| Declaration in FORM BFile: Form B_ Chandan Nagar.pdf | 20 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_08_12_2023.pdf | 18 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_08_12_2023.pdf | 18 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A_08_12_2023.pdf | 18 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: Book sold inventory _30_06_2023.pdf | 18 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: Book Sold Inventory_31_03_2023.pdf | 18 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: Books sold inventory_30_09_2023.pdf | 18 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_01_12_2023.pdf | 18 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_04_12_2023.pdf | 18 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_12_12_2023.pdf | 18 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 2223.pdf | 18 Dec 2023 |
| PAN CardFile: PAN AND AADHAR ALL.pdf | 15 Feb 2023 |
| Declaration in FORM BFile: FORM B_PROPOSED PROMOTER.pdf | 15 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Chandan Nagar_ form 1.pdf | 15 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Chandan Nagar_ form 2.pdf | 15 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Chandan Nagar_ form 2A.pdf | 15 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 _ part 1.pdf | 15 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 _ part 2.pdf | 15 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5_20-21.pdf | 15 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5_21-22.pdf | 15 Feb 2023 |
| Other - LegalFile: 7 12 EXTRACT_PART 1.pdf | 15 Feb 2023 |
| Other - LegalFile: 7 12 EXTRACT_PART 2.pdf | 15 Feb 2023 |
| Other - LegalFile: 7 12 EXTRACT_PART 3.pdf | 15 Feb 2023 |
| Other - LegalFile: APPLICATION_ANNEXURE A,B,C.pdf | 15 Feb 2023 |
| Other - LegalFile: PAN AND AADHAR ALL.pdf | 15 Feb 2023 |
| Other - LegalFile: Ramesh Sonule Death certificate.pdf | 15 Feb 2023 |
| Other - FinanceFile: Ramesh Sonule_ Bank statement.pdf | 15 Feb 2023 |
| Other - FinanceFile: Satyabhama _ Bank statement.pdf | 15 Feb 2023 |
| Building plan approval or NA orderFile: NA ORDER.pdf | 3 Sep 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: NA ORDER.pdf | 3 Sep 2020 |
| Layout approvalFile: NA ORDER.pdf | 1 Sep 2020 |
| Building plan approval or NA orderFile: SANCTIONED MAP.pdf | 1 Sep 2020 |
| PAN CardFile: PAN.pdf | 1 Sep 2020 |
| Copy of the legal title reportFile: SEARCH REPORT.pdf | 1 Sep 2020 |
| Details of encumbrancesFile: DECLARATION FOR ENCUMBRANCE.pdf | 1 Sep 2020 |
| Copy of Layout Approval (in case of layout)File: NA ORDER.pdf | 1 Sep 2020 |
| Building Plan Approval / NA Order for plotted developmentFile: SANCTIONED MAP.pdf | 1 Sep 2020 |
| Commencement Certificates / NA Order for plotted developmentFile: COMMENCEMENT CERTIFICATE.pdf | 1 Sep 2020 |
| Declaration in FORM BFile: FORM B.pdf | 1 Sep 2020 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf | 1 Sep 2020 |
| Proforma of Allotment letterFile: DECLARATION FOR PLOT ALLOTMENT.pdf | 1 Sep 2020 |
| Proforma of Allotment letterFile: PROFARMA AGREEMENT TO SALE.pdf | 1 Sep 2020 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Wardha
Computed across the 290+ Wardha projects on ReraGenie, from their own filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 4 conditions on this project's record read and explained, with the clear checks alongside
- All 67 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
- A watch tells you the moment that changes, including if the registration lapses or a complaint is filed
- But on this project's record so far, expect it to be quiet. You can also save this project free and keep it on your shortlist
Keep CHANDAN NAGAR on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near DHOTRA KASAR290+ in Wardha
Subhash Residency
Abhijit Subhash Bidkar and Amol Subhash Bi
Shri Ram Vatika
Krishnagiri Developers
Baramati City
ATUL NAMDEO WANDILE
Chhoriya Future City - Deoli Wardha Plotting
Chhoriya Developers and Construction Compa
LITTLE EARTH UNIT 11
SANJAY P. MANMODE, GANESH P. ATKAR AND MOH
Shree Sadguru Krushnagiri Nagari
Shree Samarth Infra
See every Wardha project, with the district possession charts
Builder: NARENDRA SONULE & 3 OTHERS RAMESH SONULE
NARENDRA SONULE & 3 OTHERS RAMESH SONULE has 1 registration on MahaRERA, including CHANDAN NAGAR. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Wardha district page.
Frequently asked questions
What does it mean that CHANDAN NAGAR shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if CHANDAN NAGAR is delayed beyond 31 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of CHANDAN NAGAR?
The registered promoter entity is NARENDRA SONULE & 3 OTHERS RAMESH SONULE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in CHANDAN NAGAR?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for CHANDAN NAGAR?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at CHANDAN NAGAR?
The professionals named in the filing: Architect: BHUPENDRA BELKAIYA; Architect: ROHIT RATHI; Engineer: BHUPENDRA BELKAIYA; Engineer: AJAY RATHI; Chartered Accountant: DARSHAN WAKHARIYA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in CHANDAN NAGAR?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback