Home / Browse projects / Pune, Maharashtra / CHAANDRAI CAPITAL

Completed No litigation declared Others project

CHAANDRAI CAPITAL

By SBS PROPERTIES

RG-MH-13029 · RERA P52100022361 · Last updated on MahaRERA portal: 17 Jan 2024

Source: official MahaRERA filing

Red flags

  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jun 2022Possession promisedregistration recorded completed
20 of 22Construction stages doneacross 2 buildings; furthest along: Podiums (if any), 0%
0Complaints at MahaRERAon this registration
Jump to the 69 documents Report an error

CHAANDRAI CAPITAL is a Others project by SBS PROPERTIES in Pune, Maharashtra, registered with MahaRERA as P52100022361 on 16 Sep 2019. The registration is recorded completed; possession was promised by 30 Jun 2022.

At a glance

Project

  • NameCHAANDRAI CAPITAL
  • TypeOthers
  • Location
    • NEAR SINHGAD COLLAGE
    • AMBGAON BK
    • AMBEGAON Bk
    • Haveli
    • Pune
    • 411046
  • Pincode411046
  • RERA no.P52100022361
  • ReraGenie IDRG-MH-13029

Builder

  • NameSBS PROPERTIES
  • Entity typePartnership
  • PartnersSUJIT VITTHAL SHINDE, NITIN SAMPAT SAMAGE
  • Declared earlier projects1 →

Key dates

this monthRegisteredSep 2019PromisedJun 2022Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on16 Sep 2019
  • Promised completion30 Jun 2022
  • Revised completionNone
  • Buildings2 building records
  • Documents filed69 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
B WINGNA110000
A WINGNA110000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 17 Jan 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.

B WING91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
A WING91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 17 Jan 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes80%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes100%

Parking filed8

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots8
Closed/Covered1
Open Space7
BuildingClosed/CoveredOpen SpaceTotal
B WING044
A WING134

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,950 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
SACHIN SUDAM BELDAREAMBEGAON BkPune
MANGESH SUDAM BELDAREAMBEGAON BkPune
RAKESH SUDAM BELDAREAMBEGAON BkPune

Approvals and building plan

Permissible FSI11650.79
Proposed, not sanctioned10,366 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPUNE PAUD PHATA EX SERVICEMEN COLONY 48 PAUD PHATA PUNE 411038

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAJAY B HARALE
EngineerR K RANDHAVE CONSULTANT
Chartered AccountantRAHUL GODBOLE
PartnerRole in project
SBS PROPERTIES-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100016527Jun 2022 → Mar 2024

Reason as filed by the promoterWe SBS PROPERTIES is developing a project CHAANDRAI CAPITAL and we were due to complete the project on 31-03-2023. Due to the Covid-19 pandemic we were not able to construct anymore because of lack of labour contractors and the poor market condition we were unable to complete the project within the due time. Hence, we request you to kindly allow us an extension till the extension date for 31-03-2024.

EXT52100012225Jun 2022 → Mar 2023

Reason as filed by the promoterAS PER REVISED UDPCR (ADDITINAOL FSI POTENTIAL) WE GET SANCTION ON 27/05/2021.UDPCR IS PUBLISED IN MONTH DEC 2020. THEN COVID PANDAMIC.TDR POTENTIAL TILL PENDING DUE TO PMC AND STATEMENT GOVERMENT CIRCULAR NO TPS1818/1267/P C 237/18/NAVI-13 DATED 06.08.2021

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 26 Jul 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 17 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 16 Jan 2024

Documents filed69

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Layout approvalFile: bUILDING.pdf17 Jan 2024
Building plan approvalFile: scan6696.pdf17 Jan 2024
Building plan approvalFile: scan6697.pdf17 Jan 2024
Building plan approvalFile: scan6698.pdf17 Jan 2024
Building plan approvalFile: scan6699.pdf17 Jan 2024
Building plan approvalFile: scan6701.pdf17 Jan 2024
Building plan approvalFile: scan6702.pdf17 Jan 2024
Building plan approvalFile: scan6703.pdf17 Jan 2024
Copy of Layout Approval (in case of layout)File: bUILDING.pdf17 Jan 2024
Building Plan Approval (IOD)File: scan6696.pdf17 Jan 2024
Building Plan Approval (IOD)File: scan6697.pdf17 Jan 2024
Building Plan Approval (IOD)File: scan6698.pdf17 Jan 2024
Building Plan Approval (IOD)File: scan6699.pdf17 Jan 2024
Building Plan Approval (IOD)File: scan6701.pdf17 Jan 2024
Building Plan Approval (IOD)File: scan6702.pdf17 Jan 2024
Building Plan Approval (IOD)File: scan6703.pdf17 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: cc.pdf17 Jan 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: DocScanner Jan 17, 2024 13-45.pdf17 Jan 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: RERA Certificate FY 2022-23 - Signed.pdf16 Jan 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OCCUPANCY.pdf16 Jan 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: DocScanner Jan 16, 2024 15-05.pdf16 Jan 2024
Architect’s Certificate on Completion of Project (Form 4)File: DocScanner Jan 16, 2024 18-06.pdf16 Jan 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: SOCIETY FORMATION.pdf2 Nov 2023
Declaration in FORM BFile: RERA Form B_compressed.pdf12 May 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 2A- FY 2021-22.pdf5 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 Chaandrai Capital A Wing FY 2021-22.pdf5 May 2023
Disclosure of sold/ booked inventoryFile: A wing inventory.pdf4 May 2023
Disclosure of sold/ booked inventoryFile: B wing inventory.pdf4 May 2023
Disclosure of sold/ booked inventoryFile: CHAANDRAI CAPITAL RERA B INVENTORY.pdf16 Jul 2022
Disclosure of sold/ booked inventoryFile: CHAANDRAI CAPITAL RERA A INVENTORY (4).pdf14 Jul 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OCC 1.pdf23 May 2022
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: OCC 2.pdf23 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: QUALITY ASSURANCE 20193RD 09172021_0001.pdf17 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: QUALITY ASSURANCE 201920 4TH.pdf17 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QUALITY ASSURANCE 20 2021 2ND.pdf17 Sep 2021
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: QUALITY ASSURANCE 20 2021 3RD.pdf17 Sep 2021
Declaration about Commencement CertificateFile: DELCARATION OF CC09162021.pdf16 Sep 2021
Disclosure of sold/ booked inventoryFile: SOLD INVENTORY.pdf16 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: ca 19-20 form 5.pdf16 Sep 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: ca 20-21 form 5.pdf16 Sep 2021
Commencement Certificates / NA Order for plotted developmentFile: CC R.pdf9 Sep 2021
Building plan approvalFile: B 7.pdf2 Jul 2021
Building plan approvalFile: LAYOUT (1).pdf2 Jul 2021
Building plan approvalFile: B5 (1).pdf2 Jul 2021
Building plan approvalFile: B6 (1).pdf2 Jul 2021
Building Plan Approval (IOD)File: B 7.pdf2 Jul 2021
Building Plan Approval (IOD)File: LAYOUT (1).pdf2 Jul 2021
Building Plan Approval (IOD)File: B5 (1).pdf2 Jul 2021
Building Plan Approval (IOD)File: B6 (1).pdf2 Jul 2021
Commencement Certificates / NA Order for plotted developmentFile: na order 001 (3 files merged).pdf11 Sep 2019
Commencement Certificates / NA Order for plotted developmentFile: cc 003 (4 files merged) (1).pdf11 Sep 2019
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Architect.pdf6 Sep 2019
PAN CardFile: pan card.pdf3 Sep 2019
Declaration in FORM BFile: b form 1 (1).pdf2 Aug 2019
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RERA supervisor.pdf2 Aug 2019
Building plan approvalFile: san lower parking and gr.pdf26 Jul 2019
Building plan approvalFile: san B plan.pdf26 Jul 2019
Building plan approvalFile: san terrace section.pdf26 Jul 2019
Layout approvalFile: san layout.pdf26 Jul 2019
Copy of the legal title reportFile: saerch 001 (6 files merged) (2).pdf26 Jul 2019
Details of encumbrancesFile: saerch 001 (6 files merged) (2).pdf26 Jul 2019
Copy of Layout Approval (in case of layout)File: san layout.pdf26 Jul 2019
Building Plan Approval (IOD)File: san lower parking and gr.pdf26 Jul 2019
Building Plan Approval (IOD)File: san B plan.pdf26 Jul 2019
Building Plan Approval (IOD)File: san terrace section.pdf26 Jul 2019
Certificates of CA (Form 3)File: certificate 1.pdf26 Jul 2019
Certificates of CA (Form 3)File: certificate 2.pdf26 Jul 2019
Certificates of CA (Form 3)File: certificate 3.pdf26 Jul 2019
Proforma of Allotment letterFile: draft agreement.pdf26 Jul 2019

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
RIVERVIWMHALUNGE TAL MULASHI DIST PUNE32CompletedJul 2017Late, Sep 2017

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep CHAANDRAI CAPITAL on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near AMBGAON BK13,700+ in Pune

Builder: SBS PROPERTIES

SBS PROPERTIES has 1 registration on MahaRERA, including CHAANDRAI CAPITAL. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if CHAANDRAI CAPITAL is delayed beyond 30 Jun 2022?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CHAANDRAI CAPITAL?

The registered promoter entity is SBS PROPERTIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CHAANDRAI CAPITAL?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for CHAANDRAI CAPITAL?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CHAANDRAI CAPITAL?

The professionals named in the filing: Architect: AJAY B HARALE; Engineer: R K RANDHAVE CONSULTANT; Chartered Accountant: RAHUL GODBOLE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CHAANDRAI CAPITAL?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CHAANDRAI CAPITAL. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CHAANDRAI CAPITAL to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.