Home / Browse projects / Pune, Maharashtra / Central Park Residences C1

Completed No litigation declared Residential / Group Housing project

Central Park Residences C1

By SRI KALPATRU REALTY PVT. LTD.

RG-MH-81729 · RERA P52100054901 · Last updated on MahaRERA portal: 4 Oct 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
May 2026Possession promisedregistration recorded completed
8 of 11Construction stages donefurthest along: Basement (if any), 0%
2 of 28Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 50 documents Report an error

Central Park Residences C1 is a Residential / Group Housing project by SRI KALPATRU REALTY PVT. LTD. in Pune, Maharashtra, registered with MahaRERA as P52100054901 on 15 Feb 2024. The registration is recorded completed; possession was promised by 30 May 2026. 26 of the 28 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.

At a glance

Project

  • NameCentral Park Residences C1
  • TypeResidential / Group Housing
  • Location
    • Sr. No. 37 and 38P
    • CTS No. 848
    • 885P
    • Plot No: C
    • Borhadewadi
    • Pune- 412105.
    • Borhadewadi
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100054901
  • ReraGenie IDRG-MH-81729

Builder

  • NameSRI KALPATRU REALTY PVT. LTD.
  • Entity typeCompany
  • DirectorsAmit Sunil Israni, Moti Milani

Key dates

this monthRegisteredFeb 2024PromisedMay 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on15 Feb 2024
  • Promised completion30 May 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed50 files

Current status

93%26 of 28 units booked
100.0%Work done, per cost certificate

Figures as on 4 Oct 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Central Park Residences C1NA7728028

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 4 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

8 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.

Central Park Residences C1: 73% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 4 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingYes0%

Parking filed65

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots65
Closed/Covered15
Open Space50

Land and ownership19

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,669 sq m
Land owned byThe promoter, with other names on the file
Named landowners19
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 Jul 2025
LandownerVillageDistrict
Shri. Nathu Dharu BorhadePimpri Chinchawad (M Corp.)Pune
Shantaram Vishnu BorhadePimpri Chinchawad (M Corp.)Pune
Shri. Baban Vishnu BorhadePimpri Chinchawad (M Corp.)Pune
Shri. Pandurang Vishnu BorhadePimpri Chinchawad (M Corp.)Pune
Shri. Narayan vishnu BorhadePimpri Chinchawad (M Corp.)Pune
Smt. Bhagubai Vishnu BorhadePimpri Chinchawad (M Corp.)Pune
Sou. Sindhubai Shantaram BorhadePimpri Chinchawad (M Corp.)Pune
Sou. Manisha Sunil SatstePimpri Chinchawad (M Corp.)Pune
Sou. Vimal baban BorhadePimpri Chinchawad (M Corp.)Pune
Sou. Nanda Pandurang BorhadePimpri Chinchawad (M Corp.)Pune
Sou. Tai Narayan BorhadePimpri Chinchawad (M Corp.)Pune
Sou. Sharda Nathu BorhadePimpri Chinchawad (M Corp.)Pune
Sou. Sushila Vishu SastePimpri Chinchawad (M Corp.)Pune
Sou. Kausalya Vinayak GawarePimpri Chinchawad (M Corp.)Pune
Sou. Rakhmabai Manohar BhoirePimpri Chinchawad (M Corp.)Pune
Sou. Bhamabai Dashrath SastePimpri Chinchawad (M Corp.)Pune
Sou. Vithabai Ganpat WaghirePimpri Chinchawad (M Corp.)Pune
Sou. Baidabai Baban KotwalPimpri Chinchawad (M Corp.)Pune
Sou. Sakhubai Sitaram BhalekarPimpri Chinchawad (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPimpri Chinchwad Municipal Corporation
Permissible FSI2093.87
Proposed, not sanctioned2,094 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchHDFC BANK LTD SHETTY COMPLEX, GP 69 THERMAX CHOWK, SAMBHAJI NAGAR, CHINCHWAD, PUNE- 411019
Estimated costRs 7.58 cr
Cost incurredRs 7.58 cr
Work done100.0%
BuildingWingEstimatedIncurred
Central Park Residences C1NARs 6.41 crRs 6.41 cr
-NARs 1.17 crRs 1.17 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectManik Buchade Architects
EngineerRohinee Engineers
EngineerSETU Engineering Services
Chartered AccountantPravin Pise And Associates
Chartered AccountantSCT & Company
Chartered AccountantMilani Gattani & Co.
PartnerRole in project
SRI KALPATRU REALTY PVT. LTD.-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Jan 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 May 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Jan 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed50

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: OC Verification CPR C1.pdf4 Oct 2025
Form 5 (FY 2024-2025)File: FORM 5 CPR C1.pdf26 Sep 2025
Occupational CertificateFile: PCMC Completion Certf CPR-C1.pdf2 Sep 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 CPR C1.pdf19 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CPRC1_compressed.pdf19 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 CPR C1.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: Promoters Disclosure.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: CPR C1 Architect.pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CPR C1.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: CPR C1 Engineer .pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: CPR C1- Disclosure.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARchitect CPR C1.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Central Park Residency Form 3_compressed.pdf19 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: CPR C1 Form2 Engineer Certificate.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure CPR (Building No C1).pdf19 Oct 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 -23-24-SKRPL-CPR,C1.pdf10 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf20 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf20 Jul 2024
Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold C1.pdf20 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf20 Jul 2024
Layout approvalFile: NEW PLAN 1 OF 2_compressed.pdf29 May 2024
Copy of Layout Approval (in case of layout)File: NEW PLAN 1 OF 2_compressed.pdf29 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CPR C1_compressed.pdf23 Apr 2024
Proforma of Agreement for saleFile: New Agreement Draft.pdf1 Apr 2024
Other - TechnicalFile: Declaration cum Undertaking.pdf3 Feb 2024
Other - TechnicalFile: PCMC Mail - CC verification - REA52100151922.pdf25 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Mail .pdf9 Jan 2024
CERSAI detailsFile: CERSAI_Search_Report_200292772014_For_Asset_Based_Search_08_01_2024_11_23_05_371 (1).pdf8 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SKRPL-CPR,C1- Form 3_compressed.pdf8 Jan 2024
Other - LegalFile: DIR-12 _Resignation of directopr.pdf8 Jan 2024
Other - LegalFile: MCA_Master data.pdf8 Jan 2024
Other - LegalFile: MCA_Signatory details.pdf8 Jan 2024
Layout approvalFile: Plan 1.PDF5 Jan 2024
Building plan approvalFile: plan 2.PDF5 Jan 2024
Copy of the legal title reportFile: fffffff_rotated (1).pdf5 Jan 2024
Details of encumbrances concerned to FinanceFile: Encumbrances (1).pdf5 Jan 2024
Details of encumbrances concerned to LegalFile: Encumbrances (1).pdf5 Jan 2024
Copy of Layout Approval (in case of layout)File: Plan 1.PDF5 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: plan 2.PDF5 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: New CC_compressed.pdf5 Jan 2024
Declaration about Commencement CertificateFile: Declaration of Commencement Certificate.pdf5 Jan 2024
Declaration in FORM BFile: GetUserDocumentFileContent (13)_rotated (1).pdf5 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: AMit sunil Israni.pdf5 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A (Moti Milani).pdf5 Jan 2024
Proforma of Agreement for saleFile: Agreement to sael as per RERA.pdf5 Jan 2024
Proforma of Allotment letterFile: GetUserDocumentFileContent (12) (1).pdf5 Jan 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A (Bank Details).pdf5 Jan 2024
Deviation Report with respect to Allotment letterFile: Deviation Report of Alootment Letter.pdf5 Jan 2024
Deviation Report with respect to model copy of AgreementFile: Deviation Report Agreement To Sale - CPR 1_11zon.pdf5 Jan 2024
PAN CardFile: Kalpatru Pan Card.pdf3 Jan 2024

How this compares with Pune

93%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Central Park Residences C1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Borhadewadi13,700+ in Pune

2 kmCentral Park Residences Completed 67Lapsed / revoked 31Other 55Dot size: filed unitsN

Filed coordinates, straight-line distance. 153 registered projects within 2 km.

Builder: SRI KALPATRU REALTY PVT. LTD.

SRI KALPATRU REALTY PVT. LTD. has 1 registration on MahaRERA, including Central Park Residences C1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Central Park Residences C1 is delayed beyond 30 May 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Central Park Residences C1?

The registered promoter entity is SRI KALPATRU REALTY PVT. LTD., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Central Park Residences C1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Central Park Residences C1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Central Park Residences C1?

The professionals named in the filing: Architect: Manik Buchade Architects; Engineer: Rohinee Engineers; Engineer: SETU Engineering Services; Chartered Accountant: Pravin Pise And Associates; Chartered Accountant: SCT & Company; Chartered Accountant: Milani Gattani & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Central Park Residences C1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Central Park Residences C1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Central Park Residences C1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.