Home / Browse projects / Pune, Maharashtra / Central Park Residences C1
Central Park Residences C1
By SRI KALPATRU REALTY PVT. LTD.
RG-MH-81729 · RERA P52100054901 · Last updated on MahaRERA portal: 4 Oct 2025
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Central Park Residences C1 is a Residential / Group Housing project by SRI KALPATRU REALTY PVT. LTD. in Pune, Maharashtra, registered with MahaRERA as P52100054901 on 15 Feb 2024. The registration is recorded completed; possession was promised by 30 May 2026. 26 of the 28 units on this registration are recorded sold or booked, and 8 of 11 construction stages are filed complete.
At a glance
Project
- NameCentral Park Residences C1
- TypeResidential / Group Housing
- Location
- Sr. No. 37 and 38P
- CTS No. 848
- 885P
- Plot No: C
- Borhadewadi
- Pune- 412105.
- Borhadewadi
- Pimpri Chinchawad (M Corp.)
- Haveli
- Pune
- 412105
- Pincode412105
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100054901
- ReraGenie IDRG-MH-81729
Builder
- NameSRI KALPATRU REALTY PVT. LTD.
- Entity typeCompany
- DirectorsAmit Sunil Israni, Moti Milani
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on15 Feb 2024
- Promised completion30 May 2026
- Revised completionNone
- Buildings1 building record
- Documents filed50 files
Current status
Figures as on 4 Oct 2025, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Central Park Residences C1 | NA | 7 | 7 | 28 | 0 | 28 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 4 Oct 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
8 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 0%.
Central Park Residences C1: 73% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 4 Oct 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed65
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership19
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Shri. Nathu Dharu Borhade | Pimpri Chinchawad (M Corp.) | Pune |
| Shantaram Vishnu Borhade | Pimpri Chinchawad (M Corp.) | Pune |
| Shri. Baban Vishnu Borhade | Pimpri Chinchawad (M Corp.) | Pune |
| Shri. Pandurang Vishnu Borhade | Pimpri Chinchawad (M Corp.) | Pune |
| Shri. Narayan vishnu Borhade | Pimpri Chinchawad (M Corp.) | Pune |
| Smt. Bhagubai Vishnu Borhade | Pimpri Chinchawad (M Corp.) | Pune |
| Sou. Sindhubai Shantaram Borhade | Pimpri Chinchawad (M Corp.) | Pune |
| Sou. Manisha Sunil Satste | Pimpri Chinchawad (M Corp.) | Pune |
| Sou. Vimal baban Borhade | Pimpri Chinchawad (M Corp.) | Pune |
| Sou. Nanda Pandurang Borhade | Pimpri Chinchawad (M Corp.) | Pune |
| Sou. Tai Narayan Borhade | Pimpri Chinchawad (M Corp.) | Pune |
| Sou. Sharda Nathu Borhade | Pimpri Chinchawad (M Corp.) | Pune |
| Sou. Sushila Vishu Saste | Pimpri Chinchawad (M Corp.) | Pune |
| Sou. Kausalya Vinayak Gaware | Pimpri Chinchawad (M Corp.) | Pune |
| Sou. Rakhmabai Manohar Bhoire | Pimpri Chinchawad (M Corp.) | Pune |
| Sou. Bhamabai Dashrath Saste | Pimpri Chinchawad (M Corp.) | Pune |
| Sou. Vithabai Ganpat Waghire | Pimpri Chinchawad (M Corp.) | Pune |
| Sou. Baidabai Baban Kotwal | Pimpri Chinchawad (M Corp.) | Pune |
| Sou. Sakhubai Sitaram Bhalekar | Pimpri Chinchawad (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Central Park Residences C1 | NA | Rs 6.41 cr | Rs 6.41 cr |
| - | NA | Rs 1.17 cr | Rs 1.17 cr |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Manik Buchade Architects |
| Engineer | Rohinee Engineers |
| Engineer | SETU Engineering Services |
| Chartered Accountant | Pravin Pise And Associates |
| Chartered Accountant | SCT & Company |
| Chartered Accountant | Milani Gattani & Co. |
| Partner | Role in project |
|---|---|
| SRI KALPATRU REALTY PVT. LTD. | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 5 Jan 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 29 May 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 5 Jan 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 9 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed50
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Occupational CertificateFile: OC Verification CPR C1.pdf | 4 Oct 2025 |
| Form 5 (FY 2024-2025)File: FORM 5 CPR C1.pdf | 26 Sep 2025 |
| Occupational CertificateFile: PCMC Completion Certf CPR-C1.pdf | 2 Sep 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 CPR C1.pdf | 19 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CPRC1_compressed.pdf | 19 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 CPR C1.pdf | 19 Apr 2025 |
| Disclosure of sold/ booked inventoryFile: Promoters Disclosure.pdf | 19 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: CPR C1 Architect.pdf | 20 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CPR C1.pdf | 20 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: CPR C1 Engineer .pdf | 20 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: CPR C1- Disclosure.pdf | 20 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 ARchitect CPR C1.pdf | 19 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Central Park Residency Form 3_compressed.pdf | 19 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: CPR C1 Form2 Engineer Certificate.pdf | 19 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure CPR (Building No C1).pdf | 19 Oct 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM 5 -23-24-SKRPL-CPR,C1.pdf | 10 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 20 Jul 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 20 Jul 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Unsold C1.pdf | 20 Jul 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 20 Jul 2024 |
| Layout approvalFile: NEW PLAN 1 OF 2_compressed.pdf | 29 May 2024 |
| Copy of Layout Approval (in case of layout)File: NEW PLAN 1 OF 2_compressed.pdf | 29 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CPR C1_compressed.pdf | 23 Apr 2024 |
| Proforma of Agreement for saleFile: New Agreement Draft.pdf | 1 Apr 2024 |
| Other - TechnicalFile: Declaration cum Undertaking.pdf | 3 Feb 2024 |
| Other - TechnicalFile: PCMC Mail - CC verification - REA52100151922.pdf | 25 Jan 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: CC Mail .pdf | 9 Jan 2024 |
| CERSAI detailsFile: CERSAI_Search_Report_200292772014_For_Asset_Based_Search_08_01_2024_11_23_05_371 (1).pdf | 8 Jan 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SKRPL-CPR,C1- Form 3_compressed.pdf | 8 Jan 2024 |
| Other - LegalFile: DIR-12 _Resignation of directopr.pdf | 8 Jan 2024 |
| Other - LegalFile: MCA_Master data.pdf | 8 Jan 2024 |
| Other - LegalFile: MCA_Signatory details.pdf | 8 Jan 2024 |
| Layout approvalFile: Plan 1.PDF | 5 Jan 2024 |
| Building plan approvalFile: plan 2.PDF | 5 Jan 2024 |
| Copy of the legal title reportFile: fffffff_rotated (1).pdf | 5 Jan 2024 |
| Details of encumbrances concerned to FinanceFile: Encumbrances (1).pdf | 5 Jan 2024 |
| Details of encumbrances concerned to LegalFile: Encumbrances (1).pdf | 5 Jan 2024 |
| Copy of Layout Approval (in case of layout)File: Plan 1.PDF | 5 Jan 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: plan 2.PDF | 5 Jan 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: New CC_compressed.pdf | 5 Jan 2024 |
| Declaration about Commencement CertificateFile: Declaration of Commencement Certificate.pdf | 5 Jan 2024 |
| Declaration in FORM BFile: GetUserDocumentFileContent (13)_rotated (1).pdf | 5 Jan 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: AMit sunil Israni.pdf | 5 Jan 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A (Moti Milani).pdf | 5 Jan 2024 |
| Proforma of Agreement for saleFile: Agreement to sael as per RERA.pdf | 5 Jan 2024 |
| Proforma of Allotment letterFile: GetUserDocumentFileContent (12) (1).pdf | 5 Jan 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A (Bank Details).pdf | 5 Jan 2024 |
| Deviation Report with respect to Allotment letterFile: Deviation Report of Alootment Letter.pdf | 5 Jan 2024 |
| Deviation Report with respect to model copy of AgreementFile: Deviation Report Agreement To Sale - CPR 1_11zon.pdf | 5 Jan 2024 |
| PAN CardFile: Kalpatru Pan Card.pdf | 3 Jan 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 50 filed documents as one ZIP, foldered, with a manifest
Keep Central Park Residences C1 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Borhadewadi13,700+ in Pune
Filed coordinates, straight-line distance. 153 registered projects within 2 km.
TANISH PARK
TANISH DEVELOPERS
Ajinkya Towers
APAK Bussiness Innovation Pvt Ltd
SILVER GARDENIA
SILVER PROMOTERS AND DEVELOPERS
Mangalam Life Park
Mangalam Buildcorp
SingaPune Ph 3
Xrbia Mirth Properties LLP
SingaPune Ph 2
Xrbia Mirth Properties LLP
Builder: SRI KALPATRU REALTY PVT. LTD.
SRI KALPATRU REALTY PVT. LTD. has 1 registration on MahaRERA, including Central Park Residences C1. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Central Park Residences C1 is delayed beyond 30 May 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Central Park Residences C1?
The registered promoter entity is SRI KALPATRU REALTY PVT. LTD., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Central Park Residences C1?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Central Park Residences C1?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Central Park Residences C1?
The professionals named in the filing: Architect: Manik Buchade Architects; Engineer: Rohinee Engineers; Engineer: SETU Engineering Services; Chartered Accountant: Pravin Pise And Associates; Chartered Accountant: SCT & Company; Chartered Accountant: Milani Gattani & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Central Park Residences C1?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.