Registered No litigation declared Residential / Group Housing project

Celestria

By BHAGWATI DEVELOPERS

RG-MH-18134 · RERA P51700055856 · Last updated on MahaRERA portal: 23 Jun 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 9 other registrations.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
Jun 2030Possession promisedno revision filed
0 of 22Construction stages doneacross 5 buildings; furthest along: Excavation, 0%
0Complaints at MahaRERAon this registration
Jump to the 62 documents Report an error

Celestria is a Residential / Group Housing project by BHAGWATI DEVELOPERS in Thane, Maharashtra, registered with MahaRERA as P51700055856 on 23 Apr 2024. Possession is promised by 30 Jun 2030.

At a glance

Project

  • NameCelestria
  • TypeResidential / Group Housing
  • Location
    • Knowledge Park in T.T.C. Industrial Area
    • Airoli
    • Navi Mumbai
    • Navi Mumbai (M Corp.)
    • Thane
    • 400708
  • Pincode400708
  • RERA no.P51700055856
  • ReraGenie IDRG-MH-18134

Builder

  • NameBHAGWATI DEVELOPERS
  • Entity typePartnership
  • GSTIN27AALFB5272C1ZK
  • PartnersMANJI KARMAN PATEL, JIGNA BHOGILAL VORA, BHOGILAL MAVJI VORA
  • Other registrations9 more →
  • Completed8 of 10
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredApr 2024PromisedJun 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on23 Apr 2024
  • Promised completion30 Jun 2030
  • Revised completionNone
  • Buildings5 building records
  • Documents filed62 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing ANA4639000
Wing BNA4639000
Wing CNA4639000
Wing DNA4639000
Wing ENA4639000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building5

As on 23 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 22 construction stages are filed complete across 5 buildings. The stage furthest along is Excavation, at 0%.

Wing A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing B0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing CNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable
Wing DNot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable
Wing ENot stated
ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 23 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed6490

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots6,490
Closed/Covered6,490
BuildingClosed/CoveredTotal
Wing A1,2981,298
Wing B1,2981,298
Wing C1,2981,298
Wing D1,2981,298
Wing E1,2981,298

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area22,216 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMIDC
Permissible FSI142182.4
Proposed, not sanctioned105,551 sq m
Buildings approved8
Buildings sanctioned5

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor,NISM Bhavan,Plot No. 82, Sector17 Vashi Navi Mumbai 400703

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSTAPL ARCHITECTS PVT LTD
ArchitectDIMENSIONS ARCHITECT PVT LTD
EngineerSTRUCTURAL CONCEPT PVT LTD
EngineerAssociated Structural Engineers LLP
Chartered AccountantH M SHAH AND ASSACIATES
Chartered AccountantH M SHAH AND ASSOCIATES
PartnerRole in project
BHAGWATI DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Apr 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 17 Dec 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 17 Dec 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 13 Dec 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Jun 2030

Documents filed62

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PLOT NO KR-1 ARCHITECT CERTIFICATE 19 12 2024.pdf23 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE_.pdf23 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: UPLOAD FORM 3.pdf27 Mar 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: format A.pdf27 Mar 2025
Proforma of Agreement for saleFile: AGREEMENT FOR SALE- CELESTRIA.pdf17 Mar 2025
Disclosure of sold/ booked inventoryFile: CELESTRIA AIROLI BHAGWATI DEVELOPERD_11zon.pdf28 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 (2).pdf18 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 UPLOAD.pdf18 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form A.pdf18 Feb 2025
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Form A.pdf18 Feb 2025
Declaration about Commencement CertificateFile: CC DEC.pdf18 Dec 2024
Layout approvalFile: Plot Layout.PDF17 Dec 2024
Building plan approvalFile: Plot Layout.PDF17 Dec 2024
Copy of Layout Approval (in case of layout)File: Plot Layout.PDF17 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: Plot Layout.PDF17 Dec 2024
Details of encumbrances concerned to FinanceFile: FINANCE ENCUM.pdf16 Dec 2024
Declaration in FORM BFile: FORM B.pdf16 Dec 2024
Declaration about Commencement CertificateFile: CC DEC.pdf16 Dec 2024
CERSAI detailsFile: cersai.pdf16 Dec 2024
Details of encumbrances concerned to LegalFile: FINANCE ENCUM.pdf16 Dec 2024
Building plan approvalFile: PLOT NO KR-1 2-4.pdf13 Dec 2024
Building plan approvalFile: PLOT NO KR-1 5-8.pdf13 Dec 2024
Building plan approvalFile: PLOT NO KR-1 9-12.pdf13 Dec 2024
Building plan approvalFile: PLOT NO KR-1 13-14.pdf13 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT'S CERTIFICATE.pdf13 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3 CA.pdf13 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 ENGINEER.pdf13 Dec 2024
Commencement Certificates / NA Order for plotted developmentFile: CC LETTER.pdf13 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: PLOT NO KR-1 2-4.pdf13 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: PLOT NO KR-1 13-14.pdf13 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: PLOT NO KR-1 9-12.pdf13 Dec 2024
Building Plan Approval / NA Order for plotted developmentFile: PLOT NO KR-1 5-8.pdf13 Dec 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD (2).pdf13 Dec 2024
Proforma of Agreement for saleFile: Final AFS 270524 Celestria.pdf27 May 2024
Proforma of Agreement for saleFile: Final AFS Bhagwati 17 April 2024.pdf17 Apr 2024
Copy of the legal title reportFile: Final Legal Title- 1 to 4 Bhagwati.pdf10 Apr 2024
Copy of the legal title reportFile: Final Legal Title- 5 to 8 Bhagwati.pdf10 Apr 2024
Layout approvalFile: 1 Copy of Layout Approval (in case of layout) (2).pdf8 Apr 2024
Building plan approvalFile: 1 Building Plan Approval _ NA Order for plotted development (1).pdf8 Apr 2024
Building plan approvalFile: 2 Building Plan Approval _ NA Order for plotted development (1).pdf8 Apr 2024
PAN CardFile: 1 PAN Card (2).pdf8 Apr 2024
Details of encumbrances concerned to FinanceFile: 1 a Details of encumbrances concerned to Finance.pdf8 Apr 2024
Details of encumbrances concerned to FinanceFile: 2 b Details of encumbrances concerned to Legal.pdf8 Apr 2024
Details of encumbrances concerned to LegalFile: 1 a Details of encumbrances concerned to Finance.pdf8 Apr 2024
Details of encumbrances concerned to LegalFile: 2 b Details of encumbrances concerned to Legal.pdf8 Apr 2024
Copy of Layout Approval (in case of layout)File: 1 Copy of Layout Approval (in case of layout) (2).pdf8 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 1 Building Plan Approval _ NA Order for plotted development (1).pdf8 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: 2 Building Plan Approval _ NA Order for plotted development (1).pdf8 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: 1 Commencement Certificates _ NA Order for plotted development.pdf8 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: CC Verification- Celestria.pdf8 Apr 2024
Declaration about Commencement CertificateFile: 1 Declaration about Commencement Certificate (1).pdf8 Apr 2024
Declaration in FORM BFile: Final Form B- Celestria.pdf8 Apr 2024
CERSAI detailsFile: 1 CERSAI details.pdf8 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 FINAL CELESTRIA_11zon.pdf8 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: ANNEXURE A (3)_removed_removed_11zon.pdf8 Apr 2024
Proforma of Allotment letterFile: 1 Proforma of Allotment letter (2).pdf8 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A- Separate Bank Account- Celestria.pdf8 Apr 2024
Deviation Report with respect to Allotment letterFile: Final DEVIATION REPORT - ALLOTMENT LETTER - KR-1 (1).pdf8 Apr 2024
Deviation Report with respect to model copy of AgreementFile: Final Deviation Report-Bhagwati Celestria_11zon.pdf8 Apr 2024
Other - LegalFile: 1 Other - Legal (3).pdf8 Apr 2024
Other - TechnicalFile: 1 Other - Technical.pdf8 Apr 2024
Other - TechnicalFile: CC Verification- Celestria.pdf8 Apr 2024

How this compares with Thane

24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is on the register

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Celestria on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Airoli, Navi Mumbai7,600+ in Thane

Builder: BHAGWATI DEVELOPERS

BHAGWATI DEVELOPERS has 10 registrations on MahaRERA, including BHAGWATI ELEGANZA and BHAGWATI IMPERIA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Celestria is delayed beyond 30 Jun 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Celestria?

The registered promoter entity is BHAGWATI DEVELOPERS, a partnership as per the filing. Its GSTIN 27AALFB5272C1ZK can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Celestria?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Celestria?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Celestria?

The professionals named in the filing: Architect: STAPL ARCHITECTS PVT LTD; Architect: DIMENSIONS ARCHITECT PVT LTD; Engineer: STRUCTURAL CONCEPT PVT LTD; Engineer: Associated Structural Engineers LLP; Chartered Accountant: H M SHAH AND ASSACIATES; Chartered Accountant: H M SHAH AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Celestria?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Celestria. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Celestria to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.