Red flags

  • 39 complaints at MahaRERA

Clear

  • No litigation declared
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2030Possession promisedno revision filed
0 of 77Construction stages doneacross 7 buildings; furthest along: Excavation, 0%
39Complaints at MahaRERAon this registration
Jump to the 181 documents Report an error

CELESTIAL LIVING is a Others project by Oyster Living LLP in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800028969 on 15 Apr 2021. Possession is promised by 31 Dec 2030. 39 complaints are on record with the regulator.

At a glance

Project

  • NameCELESTIAL LIVING
  • TypeOthers
  • Location
    • RAWAL PADA
    • DAHISAR EAST
    • Borivali
    • Mumbai Suburban
    • 400068
  • Pincode400068
  • RERA no.P51800028969
  • ReraGenie IDRG-MH-29703

Builder

  • NameOyster Living LLP
  • Entity typeOthers
  • Named personOyster Living LLP
  • Other registrations2 more →
  • No longer live2 lapsed, de-registered or revoked

Key dates

this monthRegisteredApr 2021PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Apr 2021
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings7 building records
  • Documents filed181 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
AURANA460000
DIVINONA460000
ELIXIR 1NA460000
ELIXIR 2NA460000
AURANA00000
ELIXIR 1NA00000
ELIXIR 2NA00000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building7

As on 8 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 77 construction stages are filed complete across 7 buildings. The stage furthest along is Excavation, at 0%.

AURA0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
DIVINO0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ELIXIR 10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ELIXIR 20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
AURA0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ELIXIR 10%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ELIXIR 20%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 8 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed470

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots470
Closed/Covered470
BuildingClosed/CoveredTotal
AURA117117
DIVINO117117
ELIXIR 1118118
ELIXIR 2118118

Land and ownership1

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area21,831 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
LandownerVillageDistrict
Dream Heritage Private LimitedBorivaliMumbai Suburban

Approvals and building plan

Permissible FSI51555.37
Proposed, not sanctioned34,035 sq m
Buildings approved7
Buildings sanctioned7

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTHAKUR COMPLEX KANDIVALI EAST

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAAKAR CONSULTANT AND ARCHEITECT
EngineerACE PROJECT MANAGEMENT CONSULANT
Chartered AccountantBHARAT VASANI
PartnerRole in project
Oyster Living LLP-

Complaints filed with MahaRERA39

Case no.ComplainantRespondentFiled
CC006000000197398Jignasa Tejas RanaOyster Living LLP24/06/2021
CC006000000197401Tejas Pranjivan RanaOyster Living LLP24/06/2021
CC006000000197805Anupam PawarOyster LLP28/07/2021
CC006000000209399SMRATI CHAURASIA & SHAILENDRA KUMAROYSTER LIVING LLP13/12/2021
CC006000000209506Ronak ChitrodaOyster Living LLP22/12/2021
CC006000000209820Mrs. Yuga Ashok Parab and Anr.M/s. Oyester Living & Ors.25/01/2022
CC006000000210255Arnab ChakrabartiOyster Living LLP10/03/2022
CC006000000292809Nishi Rajendra AvasthiOyster Living28/09/2022
CC006000000333920Ramaa Iyer ZamanOYSTER LIVING LLP & ANR16/01/2023
CC006000000396412Anima Subhasish RoyOyester Living LLP11/07/2023
CC006000000397486Darshan ShahOyster Living LLP25/10/2023
CC006000000408316AKSHAYA SURESH SAWANTOyster Living LLP02/12/2023
CC006000000408434OMKAR SURESH SAWANTOYSTER LIVING LLP11/12/2023
CC006000000429026Nirali JainOyster Living LLP05/02/2024
CC006000000500461mangesh chandrakant dalviOyester Living LLP02/07/2024
CC006000000591492Asha Ajay GuptaOyster Living LLP10/08/2024
CC12400014Ramesh Laxman LaljiOyster Living LLP03/09/2024
CC12400054Bharti LaljiOyster Living LLP06/09/2024
CC12400303Rahul TejwaniOyster Living LLP02/10/2024
CC12500206Narayan Gangaram NuthipellyOyster Living LLP21/01/2025
CC12500374Pramod Rameshchandra DubeOyster Living LLP04/02/2025
CC12500439Mehul Girish ParikhOyster Living LLP10/02/2025
CC12500592Arko BoseOyster Living LLP20/02/2025
CC12501554OMKAR EKNATH SAWANTOyster Living LLP12/05/2025
CC12501821Prajjot Harishchandra KarnikOyster Living LLP03/06/2025
CC12503181Ashvin Keshav AnvekarOyster Living LLP09/09/2025
CC12504036SHAILESH ASHOK KANCHANOyster Living LLP16/11/2025
CC12503861Vijay SawantOyster Living LLP03/11/2025
CC12503940Manoj Bhikaji KadamOyster Living LLP10/11/2025
CC12504536KISHOR PRALHAD SANGARKISHOR SANGAR19/12/2025
CC12600260Sadhana Chandrakant TanpureOyster Living LLP15/01/2026
CC12600161Gajanan Ganpat ValanjuOyster Living LLP10/01/2026
CC12601856CHAITANYA ANKUSH BARGEOyster Living LLP29/03/2026
CC12600571Shailendra KumarOyster Living LLP02/02/2026
CC12601932Dipak Jivanbhai KanthariaOyster Living LLP01/04/2026
CC12602388Deepak Babulal JainOyster Living LLP23/04/2026
CC12602581Jigisha MistryOyster Living LLP03/05/2026
CC12602585Jigisha MistryOyster Living LLP03/05/2026
CC12603863Shubhangi Vijay NaikOyster Living LLP22/06/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Apr 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Mar 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Apr 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 21 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2030

Documents filed181

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 181 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Architecture Certificate 31 03 2026.pdf8 Apr 2026
Form 2File: ENGINEER CERTIFICATE 31 03 26.pdf8 Apr 2026
Form 3File: CA Certificate 31 03 26.pdf8 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold and booked inventory 31 03 26.pdf8 Apr 2026
Self-declaration of Quarterly ProgressFile: self declaration 31 03 26.pdf8 Apr 2026
Form 1File: Architecture Certificate 31 12 2025-.pdf24 Jan 2026
Form 2File: ENGINEER CERTIFICATE 31 12 25.pdf24 Jan 2026
Form 3File: CA Certificate 31 12 25.pdf24 Jan 2026
Disclosure of Sold and Booked InventoryFile: Disclosure of sold and booked inventory 31 12 25.pdf24 Jan 2026
Self-declaration of Quarterly ProgressFile: self declaration 31 12 25.pdf24 Jan 2026
Form 2A (FY 2022-2023)File: Form 2A FY 2022-23.pdf9 Dec 2025
Form 2A (FY 2023-2024)File: Form 2A FY 2023-24.pdf9 Dec 2025
Form 2A (FY 2024-2025)File: Form 2A FY 2024-25.pdf9 Dec 2025
Form 1File: Architecture Certificate 30 06 2023.pdf6 Dec 2025
Form 2File: ENGINEER CERTIFICATE 30 06 23.pdf6 Dec 2025
Form 3File: CA Certificate 30 06 23.pdf6 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold and booked inventory 30 06 23.pdf6 Dec 2025
Form 1File: Architecture Certificate 30 09 2023.pdf6 Dec 2025
Form 2File: ENGINEER CERTIFICATE 30 09 23.pdf6 Dec 2025
Form 3File: CA Certificate 30 09 23.pdf6 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold and booked inventory 30 09 23.pdf6 Dec 2025
Form 1File: Architecture Certificate 31 12 2023.pdf6 Dec 2025
Form 2File: ENGINEER CERTIFICATE 31 12 23.pdf6 Dec 2025
Form 3File: CA Certificate 31 12 23.pdf6 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold and booked inventory 31 12 23.pdf6 Dec 2025
Form 1File: Architecture Certificate 31 03 2024.pdf6 Dec 2025
Form 2File: ENGINEER CERTIFICATE 31 03 24.pdf6 Dec 2025
Form 3File: CA Certificate 31 03 24.pdf6 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold and booked inventory 31 03 24.pdf6 Dec 2025
Form 1File: Architecture Certificate 30 06 2024.pdf6 Dec 2025
Form 2File: ENGINEER CERTIFICATE 30 06 24.pdf6 Dec 2025
Form 3File: CA Certificate 30 06 24.pdf6 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold and booked inventory 30 06 24.pdf6 Dec 2025
Self-declaration of Quarterly ProgressFile: self declaration 30 06 24.pdf6 Dec 2025
Form 1File: Architecture Certificate 30 09 2024.pdf6 Dec 2025
Form 2File: ENGINEER CERTIFICATE 30 09 24.pdf6 Dec 2025
Form 3File: CA Certificate 30 09 24.pdf6 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold and booked inventory 30 09 24.pdf6 Dec 2025
Self-declaration of Quarterly ProgressFile: self declaration 30 09 24.pdf6 Dec 2025
Form 1File: Architecture Certificate 31 12 2024.pdf6 Dec 2025
Form 2File: ENGINEER CERTIFICATE 31 12 24.pdf6 Dec 2025
Form 3File: CA Certificate 31 12 24.pdf6 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold and booked inventory 31 12 24.pdf6 Dec 2025
Self-declaration of Quarterly ProgressFile: self declaration 31 12 24.pdf6 Dec 2025
Form 1File: Architecture Certificate 31 03 2025.pdf6 Dec 2025
Form 2File: ENGINEER CERTIFICATE 31 03 25.pdf6 Dec 2025
Form 3File: CA Certificate 31 03 25.pdf6 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold and booked inventory 31 03 25.pdf6 Dec 2025
Self-declaration of Quarterly ProgressFile: self declaration 31 03 25.pdf6 Dec 2025
Form 1File: Architecture Certificate 30 06 2025.pdf6 Dec 2025
Form 2File: ENGINEER CERTIFICATE 30 06 25.pdf6 Dec 2025
Form 3File: CA Certificate 30 06 25.pdf6 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold and booked inventory 30 06 25.pdf6 Dec 2025
Self-declaration of Quarterly ProgressFile: self declaration 30 06 25.pdf6 Dec 2025
Form 1File: Architecture Certificate 30 09 2025.pdf6 Dec 2025
Form 2File: ENGINEER CERTIFICATE 30 09 25.pdf6 Dec 2025
Form 3File: CA Certificate 30 09 25.pdf6 Dec 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of sold and booked inventory 30 09 25.pdf6 Dec 2025
Self-declaration of Quarterly ProgressFile: self declaration 30 09 25.pdf6 Dec 2025
Proforma of Agreement for saleFile: Celestail Living Draft Agreement.pdf30 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: DHPL - Signed Form 3 - March 25_page-0001.pdf23 Apr 2025
Disclosure of sold/ booked inventoryFile: Disclosure of Inventory_compressed.pdf19 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate of percentage of Completion of work Form 1-310325.pdf14 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Engineer’s Certificate on Cost Incurred on Project- 310325.pdf14 Apr 2025
Building plan approvalFile: Revised IOA-4.pdf5 Apr 2025
Building plan approvalFile: Revised IOA-1.pdf5 Apr 2025
Building plan approvalFile: Revised IOA-2.pdf5 Apr 2025
Building plan approvalFile: Revised IOA-3.pdf5 Apr 2025
Building plan approvalFile: Revised IOA-4.pdf5 Apr 2025
Building plan approvalFile: Revised IOA-5.pdf5 Apr 2025
Building plan approvalFile: Revised IOA-6.pdf5 Apr 2025
Building plan approvalFile: Revised IOA-7.pdf5 Apr 2025
Building plan approvalFile: Revised IOA-8.pdf5 Apr 2025
Building plan approvalFile: Revised IOA-9.pdf5 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Revised IOA-4.pdf5 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Revised IOA-1.pdf5 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Revised IOA-2.pdf5 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Revised IOA-3.pdf5 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Revised IOA-4.pdf5 Apr 2025
Building Plan Approval / NA Order for plotted developmentFile: Revised IOA-5.pdf5 Apr 2025

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep CELESTIAL LIVING on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near DAHISAR EAST6,700+ in Mumbai Suburban

Builder: Oyster Living LLP

Oyster Living LLP has 3 registrations on MahaRERA, including Anantam - Phase II and Anantam - Phase I. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if CELESTIAL LIVING is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CELESTIAL LIVING?

The registered promoter entity is Oyster Living LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CELESTIAL LIVING?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against CELESTIAL LIVING?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for CELESTIAL LIVING?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CELESTIAL LIVING?

The professionals named in the filing: Architect: AAKAR CONSULTANT AND ARCHEITECT; Engineer: ACE PROJECT MANAGEMENT CONSULANT; Chartered Accountant: BHARAT VASANI. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CELESTIAL LIVING?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CELESTIAL LIVING. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CELESTIAL LIVING to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.