ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / CASALINO TOWERS PHASE 3

Registered No litigation declared Residential / Group Housing project

CASALINO TOWERS PHASE 3

By Sai Siddhi Promoters & Builders

RG-MH-65169 · RERA P52100055278 · Last updated on MahaRERA portal: 18 May 2026

Source: official MahaRERA filing

Red flags

  • Rs 6.00 crore secured on the land, in favour of JANASEVA SAHAKARI BANK LTD
  • The declared charge does not appear in the CERSAI report on the filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Oct 2026Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Basement (if any), 75%
92 of 122Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 72 documents Report an error

CASALINO TOWERS PHASE 3 is a Residential / Group Housing project by Sai Siddhi Promoters & Builders in Pune, Maharashtra, registered with MahaRERA as P52100055278 on 14 Mar 2024. Possession is promised by 1 Oct 2026. 30 of the 122 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameCASALINO TOWERS PHASE 3
  • TypeResidential / Group Housing
  • Location
    • HANDEWADI ROAD
    • OUTADE HANDEWADI
    • OUATADE HANDEWADI
    • Haveli
    • Pune
    • 412308
  • Pincode412308
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100055278
  • ReraGenie IDRG-MH-65169

Builder

  • NameSai Siddhi Promoters & Builders
  • Entity typePartnership
  • PartnersDATTATRAY MADHUKAR BHANGIRE, RAHUL NANDKUMAR HARPALE

Key dates

this monthRegisteredMar 2024PromisedOct 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Mar 2024
  • Promised completion1 Oct 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed72 files

Current status

25%30 of 122 units booked
76.6%Work done, per cost certificate

Figures as on 18 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA16141220122

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 18 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Basement (if any), at 75%.

A WING: 46% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)75%
Podiums (if any)0%
Plinth100%
Stilt Floor75%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 18 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed286

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots286
Closed/Covered193
Open Space93

Land and ownership3

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area3,893 sq m
Land owned byNot the promoter
Named landowners3
Encumbrance on the landDeclared present
Charge in favour ofJANASEVA SAHAKARI BANK LTD
Secured amountRs 6.00 crore
CERSAI search filedYes
Declared on6 Feb 2026
LandownerVillageDistrict
MUKHTYAR MOHAMMEDGhorpadiPune
MOHAMMAD ALI ARYAIPethPune
SANJIT KUMAR SINGHPethPune

Approvals and building plan

Sanctioning authorityPune Metropolitan Regional Development Authority
Permissible FSI12396.04
Proposed, not sanctioned10,055 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchS NO 177, BHEKARI NAGAR, FURSUNGI, PUNE 412308
Estimated costRs 12.16 cr
Cost incurredRs 9.31 cr
Work done76.58%
BuildingWingEstimatedIncurred
A WINGNARs 10.98 crRs 9.17 cr
-NARs 1.18 crRs 14.40 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSPIRO DESIGNS
EngineerMAYUR HARESH KASHIKAR
Chartered AccountantPRADYUMNA KUMAR KOLAPARTI
Chartered AccountantRADHESHAM BHUTADA
Chartered AccountantG S MUNDADA AND CO
Chartered AccountantPravin Pise & Associates
PartnerRole in project
Sai Siddhi Promoters & Builders-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Oct 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 10 Feb 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 10 Feb 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Dec 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed72

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.pdf18 May 2026
Withdrawal Update Form 2File: Form 2.pdf18 May 2026
Withdrawal Update Form 3File: Form 3.pdf18 May 2026
Form 2A (FY 2025-2026)File: Form 2A FY-2025-2026.pdf15 May 2026
Layout approvalFile: LAYOUT.pdf10 Feb 2026
Building plan approvalFile: SANCTION PLAN-2.pdf10 Feb 2026
Building plan approvalFile: SANCTION PLAN-3.pdf10 Feb 2026
Withdrawal Update Form 1File: Form 1.pdf7 Feb 2026
Withdrawal Update Form 2File: Form 2 Dec-25 Q3 25-26.pdf7 Feb 2026
Withdrawal Update Form 3File: Form 3.pdf7 Feb 2026
Form 1File: Form 1 31-03-2025.pdf12 Dec 2025
Form 2File: FORM 2 31-03-2025.pdf12 Dec 2025
Form 3File: Form 3 31-03-2025.pdf12 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY DATED 31-03-2025.pdf12 Dec 2025
Form 1File: Form 1 June-25.pdf12 Dec 2025
Form 2File: Revised Form 2 June-2025.pdf12 Dec 2025
Form 3File: Form 3 30-06-2025.pdf12 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY DATED 30-06-2025.pdf12 Dec 2025
Form 1File: Form 1 30-09-2025.pdf12 Dec 2025
Form 2File: FORM 2 30-09-2025.pdf12 Dec 2025
Form 3File: Form 3 30-09-225.pdf12 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY DATED 30-09-2025.pdf12 Dec 2025
Form 5 (FY 2023-2024)File: Form 5 Mrach-24.pdf3 Dec 2025
Form 5 (FY 2024-2025)File: Form 5 March-25.pdf3 Dec 2025
Disclosure for secured/unsecured finance availed for the projectFile: Loan Statement.pdf25 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Dec 2024.pdf20 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_Sep 2024.pdf20 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1_June 2024.pdf20 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 2024.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Mar 2024.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Sep 2024.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Dec 2024.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Sep 2024.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Jun 2024.pdf20 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2_Mar 2024.pdf20 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5_Mar 2024.pdf20 Feb 2025
Copy of the legal title reportFile: IndexII.pdf8 Oct 2024
Details of encumbrances concerned to LegalFile: mortgage index 2_compressed.pdf8 Oct 2024
Details of encumbrances concerned to FinanceFile: mortgage index 2_compressed.pdf8 Oct 2024
Copy of the legal title reportFile: mortgage index 2_compressed.pdf8 Oct 2024
Copy of the legal title reportFile: IndexII.pdf8 Oct 2024
Copy of the legal title reportFile: mortgage index 2_compressed.pdf8 Oct 2024
Details of encumbrances concerned to FinanceFile: mortgage index 2_compressed.pdf8 Oct 2024
Details of encumbrances concerned to LegalFile: mortgage index 2_compressed.pdf8 Oct 2024
Other - TechnicalFile: ANNEXURE A.pdf9 Feb 2024
Layout approvalFile: LAYOUT.pdf19 Dec 2023
Building plan approvalFile: 02SANCTION PLAN.pdf19 Dec 2023
Building plan approvalFile: 03SANCTION SHEET.pdf19 Dec 2023
Building plan approvalFile: 04SANCTION SHEET.pdf19 Dec 2023
PAN CardFile: 1 PAN Card.pdf19 Dec 2023
Copy of the legal title reportFile: Rera Serch Report Part1.pdf19 Dec 2023
Copy of the legal title reportFile: Rera Serch Report2.pdf19 Dec 2023
Details of encumbrances concerned to FinanceFile: Encumbarance finance and legal revised.pdf19 Dec 2023
Details of encumbrances concerned to LegalFile: Encumbarance finance and legal revised.pdf19 Dec 2023
Copy of Layout Approval (in case of layout)File: LAYOUT.pdf19 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 02SANCTION PLAN.pdf19 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 03SANCTION SHEET.pdf19 Dec 2023
Building Plan Approval / NA Order for plotted developmentFile: 04SANCTION SHEET.pdf19 Dec 2023
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf19 Dec 2023
Declaration about Commencement CertificateFile: Declaration about commencement.pdf19 Dec 2023
Declaration in FORM BFile: FORM B BUILDER.pdf19 Dec 2023
CERSAI detailsFile: Cersai.pdf19 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3.pdf19 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Datta Bhangire.pdf19 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Rahul Harpale.pdf19 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Sanjay Harpale.pdf19 Dec 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure Santhosh Harpale.pdf19 Dec 2023
Proforma of Allotment letterFile: Allotment letter.pdf19 Dec 2023
Proforma of Agreement for saleFile: RERA Flat Agreement-Master Draft.pdf19 Dec 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about separate Bank account.pdf19 Dec 2023
Deviation Report with respect to Allotment letterFile: Declaration about Allotment.pdf19 Dec 2023
Deviation Report with respect to model copy of AgreementFile: Declaration about agreement to sale.pdf19 Dec 2023

How this compares with Pune

25%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep CASALINO TOWERS PHASE 3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near OUTADE HANDEWADI13,700+ in Pune

2 kmCASALINO TOWERS PHASE 3Completed 37Lapsed / revoked 18Other 33Dot size: filed unitsN

Filed coordinates, straight-line distance. 88 registered projects within 2 km.

Builder: Sai Siddhi Promoters & Builders

Sai Siddhi Promoters & Builders has 1 registration on MahaRERA, including CASALINO TOWERS PHASE 3. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if CASALINO TOWERS PHASE 3 is delayed beyond 1 Oct 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CASALINO TOWERS PHASE 3?

The registered promoter entity is Sai Siddhi Promoters & Builders, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CASALINO TOWERS PHASE 3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for CASALINO TOWERS PHASE 3?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CASALINO TOWERS PHASE 3?

The professionals named in the filing: Architect: SPIRO DESIGNS; Engineer: MAYUR HARESH KASHIKAR; Chartered Accountant: PRADYUMNA KUMAR KOLAPARTI; Chartered Accountant: RADHESHAM BHUTADA; Chartered Accountant: G S MUNDADA AND CO; Chartered Accountant: Pravin Pise & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CASALINO TOWERS PHASE 3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CASALINO TOWERS PHASE 3. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CASALINO TOWERS PHASE 3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.