Home / Browse projects / Pune, Maharashtra / Casa Skyline

Registered No litigation declared Residential / Group Housing project

Casa Skyline

By Star Reality Group

RG-MH-87280 · RERA P52100048594 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 24 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2027Possession promisedmoved 24 months from the original
3 of 8Construction stages donefurthest along: Internal walls, 80%
9 of 21Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 113 documents Report an error

Casa Skyline is a Residential / Group Housing project by Star Reality Group in Pune, Maharashtra, registered with MahaRERA as P52100048594 on 10 Jan 2023. Possession is promised by 31 Dec 2027. The completion date has moved by 24 months from the original filing. 12 of the 21 units on this registration are recorded sold or booked, and 3 of 8 construction stages are filed complete.

At a glance

Project

  • NameCasa Skyline
  • TypeResidential / Group Housing
  • Location
    • Bopkhel
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 411031
  • Pincode411031
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100048594
  • ReraGenie IDRG-MH-87280

Builder

  • NameStar Reality Group
  • Entity typePartnership
  • PartnersVRISHABH DNYANESHWAR GHULE, BABAN PANDHARINATH TAKALE, RUPALI BABAN TAKALE

Key dates

this monthRegisteredJan 2023First promiseDec 2025Revised toDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on10 Jan 2023
  • Promised completion31 Dec 2027
  • Revised completionRevised to 31 Dec 2027 (originally 31 Dec 2025)
  • Buildings1 building record
  • Documents filed113 files

Current status

57%12 of 21 units booked
77.7%Work done, per cost certificate

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Building ANA8721021

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 8 construction stages are filed complete. The stage furthest along is Internal walls, at 80%.

Building A: 69% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)Not applicable
Plinth100%
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises80%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks65%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.60%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.45%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationNoNot applicable
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed37

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots37
Closed/Covered11
Open Space26

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area383 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared none
Declared on15 Jul 2025
LandownerVillageDistrict
Sanjay Anant ShelkePimpri Chinchawad (M Corp.)Pune

Approvals and building plan

Sanctioning authoritypimpri chinchwad muncipal corporation
Permissible FSI1268.6
Proposed, not sanctioned1,268 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBABAR BUSINESS CENTRE, GR FL, UNIT 101-103, PIMPRI-BHOSARI INDUSTRIAL AREA BHOSARI, PUNE
Estimated costRs 2.82 cr
Cost incurredRs 2.19 cr
Work done77.73%
BuildingWingEstimatedIncurred
Building ANARs 2.74 crRs 2.19 cr
-NARs 8.00 lakh-

Certifying professionals and partners9

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectA Square Architects
ArchitectAtul Bapurao Ranpise
EngineerRCC Consultants Vijay Rangari - -
EngineerHrishikesh Suryakant Kale
EngineerAadi Associates
Chartered AccountantCA Yogesh Kabra and Co
Chartered AccountantDeepak C Kshirsagar
Chartered AccountantYOGESHKUMAR THANVI
Chartered AccountantGOVIND MURARILAL CHOMAL
PartnerRole in project
Star Reality Group-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EA11122518647Dec 2025 → Dec 2027

Reason as filed by the promoterTHE PROJECT WORK IS COMPLETED NEARLY AROUND 40%, TO COMPLETE THE REMAINING CONSTRUCTION OF THE SAID PROJECT WE NEED EXTENSION TILL 31/12/2027

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 15 Jan 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 15 Jan 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 8 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed113

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 113 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf20 Apr 2026
Withdrawal Update Form 2File: FORM 2.pdf20 Apr 2026
Withdrawal Update Form 3File: FORM 3.pdf20 Apr 2026
Layout approvalFile: Revised Layout Casa Skyline (2).pdf15 Jan 2026
Building plan approvalFile: Revised Building Plan Casa Skyline (2).pdf15 Jan 2026
Withdrawal Update Form 1File: Form 1 Dec 25.pdf15 Jan 2026
Withdrawal Update Form 2File: Form 2 Dec 25.pdf15 Jan 2026
Withdrawal Update Form 3File: Form 3 Dec 25.pdf15 Jan 2026
Form 5 (FY 2023-2024)File: FORM 5 2023- 2024.pdf26 Dec 2025
Form 5 (FY 2022-2023)File: FORM 5 2022-2023.pdf26 Dec 2025
Form 5 (FY 2024-2025)File: Form 5 2024-2025.pdf24 Dec 2025
Form 1File: FORM 1 JUNE 2024.pdf19 Dec 2025
Form 2File: FORM 2 JUNE 2024.pdf19 Dec 2025
Form 3File: FORM 3 JUNE 2024_compressed.pdf19 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD SEPT 24 (1)_compressed.pdf19 Dec 2025
Form 2A (FY 2022-2023)File: FORM 2A- 2022-2023.pdf18 Dec 2025
Form 2A (FY 2023-2024)File: Form 2A 2023-2024.pdf18 Dec 2025
Form 2A (FY 2024-2025)File: Form 2A 2024-2025.pdf18 Dec 2025
Form 1File: Form 1.pdf12 Dec 2025
Form 2File: Form 2.pdf12 Dec 2025
Form 3File: FORM 3 (1).pdf12 Dec 2025
Disclosure of Sold and Booked InventoryFile: sold and unsold 30-12-2024.pdf12 Dec 2025
Form 1File: From 1 SEP 2024.pdf12 Dec 2025
Form 2File: FORM 2 SEP 2024.pdf12 Dec 2025
Form 3File: FORM3 SEP 2024.pdf12 Dec 2025
Disclosure of Sold and Booked InventoryFile: sold and unsold 30-09-2024.pdf12 Dec 2025
Form 1File: FORM 1 MARCH 2024.pdf12 Dec 2025
Form 2File: FORM 2 MARCH 2024.pdf12 Dec 2025
Form 3File: FORM 3 MARCH 2024.pdf12 Dec 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD MARCH 2024.pdf12 Dec 2025
Withdrawal Update Form 1File: Form 1 Casa Skyline 30-09-2025.pdf11 Dec 2025
Withdrawal Update Form 2File: FORM 2- CASA SKYLINE 30-09-2025.pdf11 Dec 2025
Withdrawal Update Form 3File: FORM 3- CASA SKYLINE 30-09-2025.pdf11 Dec 2025
Withdrawal Update Form 1File: FORM 1.pdf6 Dec 2025
Withdrawal Update Form 2File: FORM 2.pdf6 Dec 2025
Withdrawal Update Form 3File: 5.pdf6 Dec 2025
Withdrawal Update Form 1File: FORM 1.pdf21 Jul 2025
Withdrawal Update Form 2File: FORM 2.pdf21 Jul 2025
Withdrawal Update Form 3File: FORM 3.pdf21 Jul 2025
Form 1File: Form 1 march 25.pdf12 May 2025
Form 2File: Form 2 March 25.pdf12 May 2025
Form 3File: Form 3 March 25.pdf12 May 2025
Disclosure of Sold and Booked InventoryFile: Sold -Unsold March 25.pdf12 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Adobe Scan Jan 20, 2025 (1).pdf20 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 casa skyline Dec 24.pdf20 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: casa skyline Form 2 Dec 24.pdf20 Jan 2025
Disclosure of sold/ booked inventoryFile: sold unsold casa skyline dec 24.pdf20 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 2023-2024.pdf25 Oct 2024
Disclosure of sold/ booked inventoryFile: SOLD UNSOLD SEPT 24.pdf15 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From 1.pdf14 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3.pdf14 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE (1).pdf14 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1.pdf16 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_compressed.pdf16 Jul 2024
Disclosure of sold/ booked inventoryFile: Document 13.pdf16 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_compressed.pdf16 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Document 2.pdf18 Mar 2024
Disclosure of sold/ booked inventoryFile: Doument_4581 (1)_compressed.pdf5 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Adobe Scan 15 Dec 2023 (1) (1)_compressed.pdf5 Mar 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Adobe Scan 15 Dec 2023 (1)_compressed.pdf1 Mar 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 22to23 skyline compressed.pdf1 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Dec form 1 architect.pdf20 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Dec Form 3 skyline compressed.pdf20 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 Engineer’s Certificate on Cost Incurred on Project (Form 2).pdf9 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 march 2023.pdf19 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 june 2023.pdf19 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 sept 2023.pdf19 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 march 2023.pdf19 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 june 2023.pdf19 Dec 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 sept 2023.pdf19 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 june 2023_compressed.pdf19 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 sept 2023_compressed.pdf19 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: zzform 3 march 2023.pdf19 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 22to23 skyline compressed.pdf20 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Arch form 1 march 2023_compressed.pdf18 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate on Cost Incurred on Project march 2023.pdf18 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 sept 2023.pdf18 Nov 2023
Disclosure of sold/ booked inventoryFile: DSU 31 march 2023_compressed.pdf18 Nov 2023
Disclosure of sold/ booked inventoryFile: DSU 30 june 2023_compressed.pdf18 Nov 2023
Disclosure of sold/ booked inventoryFile: DSU 30 Sept 2023.pdf18 Nov 2023

How this compares with Pune

57%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 24 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Casa Skyline on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bopkhel13,700+ in Pune

2 kmCasa SkylineCompleted 7Lapsed / revoked 8Other 7Dot size: filed unitsN

Filed coordinates, straight-line distance. 22 registered projects within 2 km.

Builder: Star Reality Group

Star Reality Group has 1 registration on MahaRERA, including Casa Skyline. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Casa Skyline is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Casa Skyline?

The registered promoter entity is Star Reality Group, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Casa Skyline?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Casa Skyline?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Casa Skyline?

The professionals named in the filing: Architect: A Square Architects; Architect: Atul Bapurao Ranpise; Engineer: RCC Consultants Vijay Rangari - -; Engineer: Hrishikesh Suryakant Kale; Engineer: Aadi Associates; Chartered Accountant: CA Yogesh Kabra and Co. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Casa Skyline?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Casa Skyline. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Casa Skyline to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.