Red flags

  • Completion date moved by 48 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Palghar registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 48 months from the original
33 of 69Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 86 documents Report an error

CARNIVAL RESIDENCY 2 is a Residential / Group Housing project by MARYLAND INFRA in Palghar, Maharashtra, registered with MahaRERA as P99000014202 on 14 Nov 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 48 months from the original filing. 36 of the 69 units on this registration are recorded sold or booked.

At a glance

Project

  • NameCARNIVAL RESIDENCY 2
  • TypeResidential / Group Housing
  • Location
    • BANGLI
    • VASAI-WEST
    • Vasai-Virar City (M Corp)
    • Vasai
    • Palghar
    • 401201
  • Pincode401201
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P99000014202
  • ReraGenie IDRG-MH-90290

Builder

  • NameMARYLAND INFRA
  • Entity typePartnership
  • PartnersKENNETH FRANCIS COUTINHO, NEIL FRANCIS COUTINHO, MEENA NEIL COUTINHO, ADRINA KENNETH COUTINHO, JAMES JOSEPH ALMEIDA, COLLIN STEPHEN DCUNHA, SWAPNIL NAZARETH NUNES

Key dates

this monthRegisteredNov 2017First promiseDec 2022Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on14 Nov 2017
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Dec 2022)
  • Buildings1 building record
  • Documents filed86 files

Current status

52%36 of 69 units booked
89.9%Work done, per cost certificate

Figures as on 30 Jun 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CARNIVAL RESIDENCY 2NA191865469

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Jun 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

CARNIVAL RESIDENCY 2:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 30 Jun 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed8

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots8
Closed/Covered8

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,858 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on30 Jun 2025

Approvals and building plan

Sanctioning authorityVASAI VIRAR CITY MUNCIPAL CORPORATION
Permissible FSI1204.64
Proposed, not sanctioned1,205 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBANGLI BRANCH BANGALI NAKA SANDOR VASAI WEST
Estimated costRs 13.94 cr
Cost incurredRs 12.54 cr
Work done89.94%
BuildingWingEstimatedIncurred
CARNIVAL RESIDENCY 2NARs 13.30 crRs 12.43 cr
-NARs 63.75 lakhRs 10.75 lakh

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAJAY WADE
EngineerPARESH UNNARKAR
EngineerSIDDHESH M GAWDE
Chartered AccountantBHAKTI K MODY & ASSOCIATES
Chartered AccountantAAKASH R DADIA & CO
Chartered AccountantSARIKA R SHETTY
PartnerRole in project
MARYLAND INFRA-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT99000016601Dec 2022 → Dec 2026

Reason as filed by the promoterWE HAD APPLIED FOR APPLICATION FOR TRANSFER OF PROJECT AND THE SAME WAS APPROVED BY MAHARERA.(EMAIL ATTACHED) THE OLD PROMOTER HAD PUT THE DATE OF COMPLETION AS 30/12/2022. HOWEVER WE NOW APPLY FOR EXTENSION WITH REVISED DATE OF 31/12/2026.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Nov 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Oct 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Oct 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 11 Oct 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed86

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: FORM-2A 25-26.pdf30 Jun 2026
Withdrawal Update Form 1File: FORM-1.pdf20 Apr 2026
Withdrawal Update Form 2File: FORM-2.pdf20 Apr 2026
Withdrawal Update Form 3File: FORM 3.pdf20 Apr 2026
Withdrawal Update Form 1File: FORM 1.pdf20 Jan 2026
Withdrawal Update Form 2File: FORM 2.pdf20 Jan 2026
Withdrawal Update Form 3File: FORM 3 FINAL.pdf20 Jan 2026
Form 5 (FY 2023-2024)File: MARYLAND INFRA FORM 5.pdf7 Jan 2026
Form 5 (FY 2022-2023)File: FORM 5 - FINAL.pdf18 Nov 2025
Form 5 (FY 2024-2025)File: FORM 5 - FINAL.pdf18 Nov 2025
Withdrawal Update Form 1File: FORM 1.pdf17 Oct 2025
Withdrawal Update Form 2File: FORM 2.pdf17 Oct 2025
Withdrawal Update Form 3File: FORM 3.pdf17 Oct 2025
Form 1File: Form 1.pdf11 Jul 2025
Form 2File: form 2.pdf11 Jul 2025
Form 3File: form 3.pdf11 Jul 2025
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf11 Jul 2025
Form 1File: FORM 1.pdf11 Jul 2025
Form 2File: FORM 2.pdf11 Jul 2025
Form 3File: Form 3.pdf11 Jul 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold.pdf11 Jul 2025
Form 5 (FY 2017-2018)File: 3 FORM 5 - EMMANUEL DEVELOPERS - 2017-18.pdf11 Jul 2025
Form 5 (FY 2018-2019)File: 4 FORM 5 - EMMANUEL DEVELOPERS - 2018-19.pdf11 Jul 2025
Form 5 (FY 2019-2020)File: 5 FORM 5 - EMMANUEL DEVELOPERS - 2019-20.pdf11 Jul 2025
Form 5 (FY 2020-2021)File: 6 FORM 5 - EMMANUEL DEVELOPERS - 2020-21.pdf11 Jul 2025
Form 5 (FY 2021-2022)File: 7 FORM 5 - EMMANUEL DEVELOPERS - 2021-22.pdf11 Jul 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf19 Apr 2025
Certificates of CA (Form 3)File: form 3.pdf19 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2.pdf19 Apr 2025
Disclosure of sold/ booked inventoryFile: sold unsold.pdf19 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1.pdf23 Jan 2025
Certificates of CA (Form 3)File: Form 3.pdf23 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf23 Jan 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold.pdf23 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: MARYLAND INFRA FORM 5.pdf6 Jan 2025
Certificates of CA (Form 3)File: FORM3 MARYLAND INFRA.pdf7 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM1.pdf4 Jun 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2_compressed (1).pdf4 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf26 Feb 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf26 Feb 2024
Certificates of CA (Form 3)File: FORM3_11zon.pdf11 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: form2a 300923.pdf10 Nov 2023
Disclosure of sold/ booked inventoryFile: NEW MARYLAND INFRA SOLD UNSOLD_page-0001.pdf10 Nov 2023
Certificates of CA (Form 3)File: FORM 3 - FINAL F.pdf10 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM1_compressed.pdf8 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM2_compressed.pdf8 Nov 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Maryland Infra - From 2A.pdf8 Nov 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: FORMAT-A.pdf8 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - MARYLAND - FINAL.pdf1 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: FORM 2A - MARYLAND - FINAL.pdf1 Jun 2023
PAN CardFile: 12 MARYLAND INFRA PAN.pdf6 May 2023
Declaration in FORM BFile: 22 FORM B MARYLAND INFRA.pdf6 May 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 - MARYLAND.pdf6 May 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM 2 - MARYLAND.pdf6 May 2023
Disclosure of sold/ booked inventoryFile: 11 SOLD UNSOLD INVENTORY - EMMANUEL DEVELOPERS.pdf6 May 2023
Certificates of CA (Form 3)File: 25 FORM 3.pdf6 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: 3 FORM 5 - EMMANUEL DEVELOPERS - 2017-18.pdf6 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: 4 FORM 5 - EMMANUEL DEVELOPERS - 2018-19.pdf6 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: 5 FORM 5 - EMMANUEL DEVELOPERS - 2019-20.pdf6 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: 6 FORM 5 - EMMANUEL DEVELOPERS - 2020-21.pdf6 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: 7 FORM 5 - EMMANUEL DEVELOPERS - 2021-22.pdf6 May 2023
Layout approvalFile: LAYOUT PLAN_compressed.pdf11 Oct 2022
Building plan approvalFile: LAYOUT PLAN_compressed.pdf11 Oct 2022
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN_compressed.pdf11 Oct 2022
Building Plan Approval (IOD)File: LAYOUT PLAN_compressed.pdf11 Oct 2022
Commencement Certificates / NA Order for plotted developmentFile: CC Copy_compressed.pdf11 Oct 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architech Certificate Wade Ltr to RERA - Bldg No 2.pdf11 Oct 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engineers certificate Unnarkar Ltr to RERA - Bldg No 2 - Revised_compressed.pdf11 Oct 2022
CERSAI detailsFile: CERSAI certificate Carnival Residency 2.pdf11 Oct 2022
Layout approvalFile: layout approval.pdf7 Nov 2017
Building plan approvalFile: Rera 1.pdf7 Nov 2017
Copy of Layout Approval (in case of layout)File: layout approval.pdf7 Nov 2017
Building Plan Approval (IOD)File: Rera 1.pdf7 Nov 2017
Commencement Certificates / NA Order for plotted developmentFile: COMMON COMMENCEMENT CERTIFICATE.pdf7 Nov 2017
Certificates of CA (Form 3)File: ca certificate compressed building 2.pdf7 Nov 2017
Proforma of Allotment letterFile: SALE AGREEMENT-1-15 NEW-1-10.pdf7 Nov 2017
Proforma of Allotment letterFile: SALE AGREEMENT 11-15.pdf7 Nov 2017
Proforma of Allotment letterFile: SALE AGREEMENT-16-30.pdf7 Nov 2017
Proforma of Allotment letterFile: ALLOTMENT LETTER NEW.pdf7 Nov 2017
PAN CardFile: PAN CARD.pdf6 Nov 2017

How this compares with Palghar

52%of this project is bookeddistrict median 25%
31%of Palghar projects moved their completion datethis one moved by 48 months
26%of Palghar registrations have lapsed or been cancelledthis one is on the register

Computed across the 3,200+ Palghar projects on ReraGenie, from their own filings.

Free monthly report: Vasai-Virar and Palghar on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep CARNIVAL RESIDENCY 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VASAI-WEST3,200+ in Palghar

2 kmCARNIVAL RESIDENCY 2Completed 11Lapsed / revoked 7Other 2Dot size: filed unitsN

Filed coordinates, straight-line distance. 20 registered projects within 2 km.

Builder: MARYLAND INFRA

MARYLAND INFRA has 1 registration on MahaRERA, including CARNIVAL RESIDENCY 2. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Palghar district page.

Frequently asked questions

What are my rights if CARNIVAL RESIDENCY 2 is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of CARNIVAL RESIDENCY 2?

The registered promoter entity is MARYLAND INFRA, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in CARNIVAL RESIDENCY 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for CARNIVAL RESIDENCY 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at CARNIVAL RESIDENCY 2?

The professionals named in the filing: Architect: AJAY WADE; Engineer: PARESH UNNARKAR; Engineer: SIDDHESH M GAWDE; Chartered Accountant: BHAKTI K MODY & ASSOCIATES; Chartered Accountant: AAKASH R DADIA & CO; Chartered Accountant: SARIKA R SHETTY. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in CARNIVAL RESIDENCY 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About CARNIVAL RESIDENCY 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save CARNIVAL RESIDENCY 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.