Home / Browse projects / Bengaluru Urban, Karnataka / BRINDAVAN

Registration approved No litigation declared Residential/Group Housing project

BRINDAVAN

By Sri Krishna Group

RG-KA-49749 · RERA PRM/KA/RERA/1251/310/PR/060723/006047 · Last updated on RERA Karnataka portal: 6 May 2023

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2024Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 102 documents Report an error

BRINDAVAN is a Residential/Group Housing project by Sri Krishna Group in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/060723/006047 on 6 Jul 2023. Possession is promised by 31 Dec 2024.

At a glance

Project

  • NameBRINDAVAN
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
    • 560068
  • Pincode560068
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/310/PR/060723/006047
  • ReraGenie IDRG-KA-49749

Builder

  • NameSri Krishna Group
  • Entity typePartnership Firm
  • Authorized SignatoryK Rambhupal Reddy

Key dates

this monthRegisteredJul 2023PromisedDec 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on6 Jul 2023
  • Promised completion31 Dec 2024
  • Revised completionNone
  • Buildings1 building record
  • Documents filed102 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Brindavan---28028

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 6 May 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation workNot applicable
Internal and External work including landscapes as per sanctioned drawingsNot applicable

Progress on shared amenities40

As on 6 May 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes-
Solid waste management and disposalNoNot applicable
Emergency Evacuation servicesYes-
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationYes-
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)NoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupNoNot applicable
Piped GasNoNot applicable
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallNoNot applicable
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area993 sq m
Named landowners1
LandownerVillageDistrict
V Patamal--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 6.00 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 5.00 cr-
On-site expenditure-Salaries of workersRs 50.00 lakh-
Payment of taxesRs 20.00 lakh-
Payment of chargesRs 10.00 lakh-
Payment of feesRs 6.00 lakh-
On-site expenditure-Site OverheadRs 5.00 lakh-
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 5.00 lakh-
On-site expenditure-Consultants FeesRs 2.50 lakh-
Payment of cessRs 1.50 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectLakshmikanth S
EngineerSrinivasa Rao Bolimunta
Chartered AccountantRAMA RAO VANKAYALA

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed102

As listed on the registration, under the names the promoter filed them with; the newest 80 of 102 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/060723/006047 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Upload profit and loss account and balance sheet 2021-22 with CA UDINFile: 4 - P&L.pdf6 May 2023
Upload Cash flow statementFile: Cash Flow Statement.pdf6 May 2023
upload bank pass book / cheque leaf / pass sheetFile: Passbook RERA.pdf6 May 2023
site is not come under approved layout , not uploaded layout planFile: Layout Plan.pdf6 May 2023
betterment charges paid receiptFile: Betterment Charges paid receipt.pdf6 May 2023
Khatha CertificateFile: Khatha Certificate.pdf6 May 2023
Khatha ExtractFile: Khatha Extract.pdf6 May 2023
Engineer CertifiicateFile: Engineer Certificate Final.pdf6 May 2023
Proforma of Agreement for SaleFile: Proforma Agreement of Sale.pdf6 May 2023
Allottment LetterFile: ALLOTMENT LETTER.pdf6 May 2023
BWSSB fee paid receiptFile: Affidavit receipt.pdf6 May 2023
chartered accountant certificate in prescribed format form -01File: Form-01-Chartered Accountants Certificate.pdf28 Mar 2023
profit and loss account and balance sheet 2021-22 with CA UDINFile: P&L.pdf28 Mar 2023
profit and loss account and balance sheet 2021-22 with CA UDINFile: PL.pdf28 Mar 2023
Cash flow statementFile: Cash Flow Statement.pdf28 Mar 2023
pass book / cheque leaf / pass sheetFile: Statement of Accounts.pdf28 Mar 2023
Layout planFile: Layout Plan.pdf28 Mar 2023
betterment charges paid receiptFile: Betterment Charges paid receipt.pdf28 Mar 2023
e khata with PID numberFile: Khatha Certificate.pdf28 Mar 2023
e khata with PID numberFile: Khatha Extract.pdf28 Mar 2023
form bFile: Form B - signed.pdf28 Mar 2023
pid no/syno in project address column in project detail pageFile: Acknowledgement.pdf28 Mar 2023
Area details the project details page not matching with the Approved PlanFile: Acknowledgement.pdf28 Mar 2023
FAR As per the sanction Plan is Not Matching with the details EnteredFile: Acknowledgement.pdf28 Mar 2023
single plot layoutFile: Layout Plan.pdf28 Mar 2023
CDP Plan demarcation of the proposed siteFile: CDP color.pdf28 Mar 2023
update the Land area, Covered area, Open area, Total built up area, Plinth areaFile: Acknowledgement.pdf28 Mar 2023
Engineer certificate (Form-3)File: Engineer Certificate pdf.pdf28 Mar 2023
update the cost details on the project detail page and cost detail pageFile: Acknowledgement.pdf28 Mar 2023
proforma of Agreement for Sale(AFS)File: Draft Sale Agreement - Brindavan.pdf28 Mar 2023
Allotment letterFile: ALLOTMENT LETTER.pdf28 Mar 2023
BESCOM NOCFile: BESCOM NOC.pdf28 Mar 2023
BWSSB NOCFile: BWSSB NOC.pdf28 Mar 2023
Letter supporting Financial statusFile: Supporting Letter to FInancial Status.pdf28 Mar 2023
Cash Flow StatementFile: Cash Flow Statement.pdf28 Mar 2023
Upload profit and loss account and balance sheet 2018-19, 2019-20 & 2020-21 with CA UDINFile: 4 - P&L.pdf22 Feb 2023
Upload profit and loss account and balance sheet 2018-19, 2019-20 & 2020-21 with CA UDINFile: 4 - PL.pdf22 Feb 2023
Upload Cash flow statement, Directors report and Auditor report for 2018-19, 2019-20File: 4 - BS_1.pdf22 Feb 2023
upload bank pass book / cheque leaf / pass sheetFile: Statement of Accounts.pdf22 Feb 2023
Betterment Charges Paid receiptFile: 2 - Betterment Charges Receipt.pdf22 Feb 2023
Engineer certificateFile: 3 - yuktivs_22204 - Engineer Certificate.pdf22 Feb 2023
Complete copy of BESCOM NOCFile: Bescom NOC complete.pdf22 Feb 2023
Allotement LetterFile: 5 - Allotement Letter.pdf22 Feb 2023
STP marked PlanFile: 6 - STP marked.pdf22 Feb 2023
Profarma Agreement of SaleFile: RERA-Profarma Sale Agreement - Brindavan Apartment.pdf22 Feb 2023
CDP PlanFile: 5 - CDP.pdf22 Feb 2023
Commencement CertificateFile: Commencement Certificate.jpeg22 Feb 2023
Conversion Order not available since the same comes under BBM Limits, attached Betterment ChargesFile: Betterment Charges Receipt.pdf15 Dec 2022
Since the Property comes under BBM, e Khatha not availableFile: Betterment Charges Receipt.pdf15 Dec 2022
Single Layout Plan not available, since the building plan is obtainedFile: Building License.pdf15 Dec 2022
Profarma Allotement LetterFile: Allotement Letter.pdf15 Dec 2022
Balance SheetFile: Balance Sheet.pdf15 Dec 2022
Bescom NOCFile: Bescom NOC.pdf15 Dec 2022
Project SpecificationFile: Project Specification.pdf15 Dec 2022
CDPFile: CDP.pdf15 Dec 2022
Village MapFile: Village Map.pdf15 Dec 2022
Profarma Sale AgreementFile: Draft Sale Agreement - Brindavan Apartment-AJ- 23 Aug 2022.pdf15 Dec 2022
Profarma Sale DeedFile: Draft Sale Deed- BRINDAVAN-AJ-23 Aug 2022.pdf15 Dec 2022
Form BFile: Form B.pdf14 Nov 2022
Non Litigation AffidavitFile: Non Litigation.pdf14 Nov 2022
Conversion Order is not obtained, Betterment charges are paid to concerned departmentFile: Betterment Charges Receipt.pdf14 Nov 2022
E-Khatha - This property comes under BBMP hence the BBMP Khatha is uploaded hereinFile: Khatha Certificate.pdf14 Nov 2022
E-Khatha - This property comes under BBMP hence the BBMP Khatha is uploaded hereinFile: Khatha Extract.pdf14 Nov 2022
EC from 01.04.2004 to 14.09.2022File: EC from 01 04 2004 to 14 09 2022.pdf18 Oct 2022
Architecture DetailsFile: COA Certificate.pdf18 Oct 2022
Building LiscenceFile: Building License.pdf18 Oct 2022
Guidline ValueFile: Guidline Value.pdf18 Oct 2022
Need to upload conversion order - Betterment Charges Paid Receipt UploadedFile: Betterment Charges Receipt.pdf12 Sep 2022
Need to upload e khata- Uploaded BBMP KhathaFile: Khatha Extract.pdf12 Sep 2022
Need to upload e khata- Uploaded BBMP KhathaFile: Khatha Certificate.pdf12 Sep 2022
Absolute sale deed to V Patamal, R Ramalingam ,R Velu and othersFile: Sale Deed of Mr V Patmal.pdf12 Sep 2022
Need hissa phody copy.File: Hissa Phodi Copy.pdf12 Sep 2022
Need akarabandFile: Aakharbandh.pdf12 Sep 2022
Need to upload partnership deedFile: partnership deed srikrishna grouop new.pdf12 Sep 2022
Registration CertificateFile: Firm Registration.pdf-
Partnership DeedFile: partnership deed srikrishna grouop new.pdf-
Partner Details-
Partner Details-
Partner Details-
Partner Details-

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep BRINDAVAN on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmBRINDAVANOther 15Dot size: filed unitsN

Filed coordinates, straight-line distance. 15 registered projects within 2 km.

Builder: Sri Krishna Group

Sri Krishna Group has 1 registration on RERA Karnataka, including BRINDAVAN. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if BRINDAVAN is delayed beyond 31 Dec 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of BRINDAVAN?

The registered promoter entity is Sri Krishna Group, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in BRINDAVAN?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at BRINDAVAN?

The professionals named in the filing: Architect: Lakshmikanth S; Engineer: Srinivasa Rao Bolimunta; Chartered Accountant: RAMA RAO VANKAYALA. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BRINDAVAN?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BRINDAVAN. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BRINDAVAN to a free account