BRINDAVAN is a Residential/Group Housing project by Sri Krishna Group in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/060723/006047 on 6 Jul 2023. Possession is promised by 31 Dec 2024.
At a glance
Project
- NameBRINDAVAN
- TypeResidential/Group Housing
- Location
- Bengaluru South
- Bengaluru Urban
- 560068
- Pincode560068
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/310/PR/060723/006047
- ReraGenie IDRG-KA-49749
Builder
- NameSri Krishna Group
- Entity typePartnership Firm
- Authorized SignatoryK Rambhupal Reddy
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on6 Jul 2023
- Promised completion31 Dec 2024
- Revised completionNone
- Buildings1 building record
- Documents filed102 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Brindavan | - | - | - | 28 | 0 | 28 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 6 May 2023, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
Building:
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | - |
| Foundation footing work | - |
| Upto Plinth Level | - |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | - |
| Retaining wall (All types) | Not applicable |
| RCC or MS Framed structure | - |
| Masonry Construction | - |
| Plastering inside , outside & Ceiling | - |
| Joinery: Doors, Windows, Ventilators etc | - |
| Basic work of Water supply, Sanitary and Electrification | - |
| Dadoing, Skirting, Flooring, Tiles work (All types) | - |
| Railing and Grill fixing | - |
| Electrification, Water supply and Sanitary Finishing | - |
| Painting | - |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | Not applicable |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | Not applicable |
| Internal and External work including landscapes as per sanctioned drawings | Not applicable |
Progress on shared amenities40
As on 6 May 2023, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | - |
| Sewage and Drainage System | No | Not applicable |
| Water conservation/rain water harvesting/recharge of ground water | Yes | - |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | Yes | - |
| Solid waste management and disposal | No | Not applicable |
| Emergency Evacuation services | Yes | - |
| Internal Roads & Footpaths | No | Not applicable |
| Electricity supply transformer and substation | Yes | - |
| Storm water drains | No | Not applicable |
| Use of renewable energy | No | Not applicable |
| Sewage Treatment Plant (STP) | No | Not applicable |
| Parks & Tree planting | No | Not applicable |
| Street Lighting | No | Not applicable |
| Electricity | Yes | - |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | No | Not applicable |
| Piped Gas | No | Not applicable |
| Water and Sanitation | No | Not applicable |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | - |
| Lifts | Yes | - |
| Corridor/Lobbies | Yes | - |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | - |
| Basement | Yes | - |
| Terrace | Yes | - |
| Outer Wall | No | Not applicable |
| Open parking areas | No | Not applicable |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership1
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| V Patamal | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 5.00 cr | - |
| On-site expenditure-Salaries of workers | Rs 50.00 lakh | - |
| Payment of taxes | Rs 20.00 lakh | - |
| Payment of charges | Rs 10.00 lakh | - |
| Payment of fees | Rs 6.00 lakh | - |
| On-site expenditure-Site Overhead | Rs 5.00 lakh | - |
| On-site expenditure-Cost Of Services(Water, Electricity, Sewage) | Rs 5.00 lakh | - |
| On-site expenditure-Consultants Fees | Rs 2.50 lakh | - |
| Payment of cess | Rs 1.50 lakh | - |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Lakshmikanth S |
| Engineer | Srinivasa Rao Bolimunta |
| Chartered Accountant | RAMA RAO VANKAYALA |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed102
As listed on the registration, under the names the promoter filed them with; the newest 80 of 102 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/060723/006047 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Upload profit and loss account and balance sheet 2021-22 with CA UDINFile: 4 - P&L.pdf | 6 May 2023 |
| Upload Cash flow statementFile: Cash Flow Statement.pdf | 6 May 2023 |
| upload bank pass book / cheque leaf / pass sheetFile: Passbook RERA.pdf | 6 May 2023 |
| site is not come under approved layout , not uploaded layout planFile: Layout Plan.pdf | 6 May 2023 |
| betterment charges paid receiptFile: Betterment Charges paid receipt.pdf | 6 May 2023 |
| Khatha CertificateFile: Khatha Certificate.pdf | 6 May 2023 |
| Khatha ExtractFile: Khatha Extract.pdf | 6 May 2023 |
| Engineer CertifiicateFile: Engineer Certificate Final.pdf | 6 May 2023 |
| Proforma of Agreement for SaleFile: Proforma Agreement of Sale.pdf | 6 May 2023 |
| Allottment LetterFile: ALLOTMENT LETTER.pdf | 6 May 2023 |
| BWSSB fee paid receiptFile: Affidavit receipt.pdf | 6 May 2023 |
| chartered accountant certificate in prescribed format form -01File: Form-01-Chartered Accountants Certificate.pdf | 28 Mar 2023 |
| profit and loss account and balance sheet 2021-22 with CA UDINFile: P&L.pdf | 28 Mar 2023 |
| profit and loss account and balance sheet 2021-22 with CA UDINFile: PL.pdf | 28 Mar 2023 |
| Cash flow statementFile: Cash Flow Statement.pdf | 28 Mar 2023 |
| pass book / cheque leaf / pass sheetFile: Statement of Accounts.pdf | 28 Mar 2023 |
| Layout planFile: Layout Plan.pdf | 28 Mar 2023 |
| betterment charges paid receiptFile: Betterment Charges paid receipt.pdf | 28 Mar 2023 |
| e khata with PID numberFile: Khatha Certificate.pdf | 28 Mar 2023 |
| e khata with PID numberFile: Khatha Extract.pdf | 28 Mar 2023 |
| form bFile: Form B - signed.pdf | 28 Mar 2023 |
| pid no/syno in project address column in project detail pageFile: Acknowledgement.pdf | 28 Mar 2023 |
| Area details the project details page not matching with the Approved PlanFile: Acknowledgement.pdf | 28 Mar 2023 |
| FAR As per the sanction Plan is Not Matching with the details EnteredFile: Acknowledgement.pdf | 28 Mar 2023 |
| single plot layoutFile: Layout Plan.pdf | 28 Mar 2023 |
| CDP Plan demarcation of the proposed siteFile: CDP color.pdf | 28 Mar 2023 |
| update the Land area, Covered area, Open area, Total built up area, Plinth areaFile: Acknowledgement.pdf | 28 Mar 2023 |
| Engineer certificate (Form-3)File: Engineer Certificate pdf.pdf | 28 Mar 2023 |
| update the cost details on the project detail page and cost detail pageFile: Acknowledgement.pdf | 28 Mar 2023 |
| proforma of Agreement for Sale(AFS)File: Draft Sale Agreement - Brindavan.pdf | 28 Mar 2023 |
| Allotment letterFile: ALLOTMENT LETTER.pdf | 28 Mar 2023 |
| BESCOM NOCFile: BESCOM NOC.pdf | 28 Mar 2023 |
| BWSSB NOCFile: BWSSB NOC.pdf | 28 Mar 2023 |
| Letter supporting Financial statusFile: Supporting Letter to FInancial Status.pdf | 28 Mar 2023 |
| Cash Flow StatementFile: Cash Flow Statement.pdf | 28 Mar 2023 |
| Upload profit and loss account and balance sheet 2018-19, 2019-20 & 2020-21 with CA UDINFile: 4 - P&L.pdf | 22 Feb 2023 |
| Upload profit and loss account and balance sheet 2018-19, 2019-20 & 2020-21 with CA UDINFile: 4 - PL.pdf | 22 Feb 2023 |
| Upload Cash flow statement, Directors report and Auditor report for 2018-19, 2019-20File: 4 - BS_1.pdf | 22 Feb 2023 |
| upload bank pass book / cheque leaf / pass sheetFile: Statement of Accounts.pdf | 22 Feb 2023 |
| Betterment Charges Paid receiptFile: 2 - Betterment Charges Receipt.pdf | 22 Feb 2023 |
| Engineer certificateFile: 3 - yuktivs_22204 - Engineer Certificate.pdf | 22 Feb 2023 |
| Complete copy of BESCOM NOCFile: Bescom NOC complete.pdf | 22 Feb 2023 |
| Allotement LetterFile: 5 - Allotement Letter.pdf | 22 Feb 2023 |
| STP marked PlanFile: 6 - STP marked.pdf | 22 Feb 2023 |
| Profarma Agreement of SaleFile: RERA-Profarma Sale Agreement - Brindavan Apartment.pdf | 22 Feb 2023 |
| CDP PlanFile: 5 - CDP.pdf | 22 Feb 2023 |
| Commencement CertificateFile: Commencement Certificate.jpeg | 22 Feb 2023 |
| Conversion Order not available since the same comes under BBM Limits, attached Betterment ChargesFile: Betterment Charges Receipt.pdf | 15 Dec 2022 |
| Since the Property comes under BBM, e Khatha not availableFile: Betterment Charges Receipt.pdf | 15 Dec 2022 |
| Single Layout Plan not available, since the building plan is obtainedFile: Building License.pdf | 15 Dec 2022 |
| Profarma Allotement LetterFile: Allotement Letter.pdf | 15 Dec 2022 |
| Balance SheetFile: Balance Sheet.pdf | 15 Dec 2022 |
| Bescom NOCFile: Bescom NOC.pdf | 15 Dec 2022 |
| Project SpecificationFile: Project Specification.pdf | 15 Dec 2022 |
| CDPFile: CDP.pdf | 15 Dec 2022 |
| Village MapFile: Village Map.pdf | 15 Dec 2022 |
| Profarma Sale AgreementFile: Draft Sale Agreement - Brindavan Apartment-AJ- 23 Aug 2022.pdf | 15 Dec 2022 |
| Profarma Sale DeedFile: Draft Sale Deed- BRINDAVAN-AJ-23 Aug 2022.pdf | 15 Dec 2022 |
| Form BFile: Form B.pdf | 14 Nov 2022 |
| Non Litigation AffidavitFile: Non Litigation.pdf | 14 Nov 2022 |
| Conversion Order is not obtained, Betterment charges are paid to concerned departmentFile: Betterment Charges Receipt.pdf | 14 Nov 2022 |
| E-Khatha - This property comes under BBMP hence the BBMP Khatha is uploaded hereinFile: Khatha Certificate.pdf | 14 Nov 2022 |
| E-Khatha - This property comes under BBMP hence the BBMP Khatha is uploaded hereinFile: Khatha Extract.pdf | 14 Nov 2022 |
| EC from 01.04.2004 to 14.09.2022File: EC from 01 04 2004 to 14 09 2022.pdf | 18 Oct 2022 |
| Architecture DetailsFile: COA Certificate.pdf | 18 Oct 2022 |
| Building LiscenceFile: Building License.pdf | 18 Oct 2022 |
| Guidline ValueFile: Guidline Value.pdf | 18 Oct 2022 |
| Need to upload conversion order - Betterment Charges Paid Receipt UploadedFile: Betterment Charges Receipt.pdf | 12 Sep 2022 |
| Need to upload e khata- Uploaded BBMP KhathaFile: Khatha Extract.pdf | 12 Sep 2022 |
| Need to upload e khata- Uploaded BBMP KhathaFile: Khatha Certificate.pdf | 12 Sep 2022 |
| Absolute sale deed to V Patamal, R Ramalingam ,R Velu and othersFile: Sale Deed of Mr V Patmal.pdf | 12 Sep 2022 |
| Need hissa phody copy.File: Hissa Phodi Copy.pdf | 12 Sep 2022 |
| Need akarabandFile: Aakharbandh.pdf | 12 Sep 2022 |
| Need to upload partnership deedFile: partnership deed srikrishna grouop new.pdf | 12 Sep 2022 |
| Registration CertificateFile: Firm Registration.pdf | - |
| Partnership DeedFile: partnership deed srikrishna grouop new.pdf | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
| Partner Details | - |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep BRINDAVAN on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 15 registered projects within 2 km.
MEMCO SKYLINE - JUTAKU
MEMCO SKYLINE PRIVATE LIMITED
SNN RAJ SERENITY
SNN Builders Private Limited
TVS Emerald Jardin
Emerald Haven Development Limited
CASAGRAND AMOR
CASA GRANDE GARDEN CITY BUILDERS PVT LTD
Assetz Mizumi Reserve Tower A1 A2 A4
APG COMMUNITY DEVELOPMENT PRIVATE LIMITED
Assetz Canvas & Cove 2.0 - Block B & C
APG HABITAT PRIVATE LIMITED
See every Bengaluru Urban project, with the district possession charts
Builder: Sri Krishna Group
Sri Krishna Group has 1 registration on RERA Karnataka, including BRINDAVAN. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if BRINDAVAN is delayed beyond 31 Dec 2024?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of BRINDAVAN?
The registered promoter entity is Sri Krishna Group, a partnership firm as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in BRINDAVAN?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at BRINDAVAN?
The professionals named in the filing: Architect: Lakshmikanth S; Engineer: Srinivasa Rao Bolimunta; Chartered Accountant: RAMA RAO VANKAYALA. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in BRINDAVAN?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback