Home / Browse projects / Nagpur, Maharashtra / BRINDABAN ELITE

Registered No litigation declared Plotted project

BRINDABAN ELITE

By PRABHAT JANAK GARG, CHANDANA JANAK GARG AND VIKAS JANAK GARG

RG-MH-82197 · RERA P50500056026 · Last updated on MahaRERA portal: 15 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.

See what the report covers Free either way: or have every new Nagpur registration emailed to you, free during the pilot beta.
Mar 2027Possession promisedno revision filed
25 of 35Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 73 documents Report an error

BRINDABAN ELITE is a Plotted project by PRABHAT JANAK GARG, CHANDANA JANAK GARG AND VIKAS JANAK GARG in Nagpur, Maharashtra, registered with MahaRERA as P50500056026 on 6 May 2024. Possession is promised by 31 Mar 2027. 10 of the 35 units on this registration are recorded sold or booked.

At a glance

Project

  • NameBRINDABAN ELITE
  • TypePlotted
  • Location
    • BHILGAON
    • Kamptee
    • Nagpur
    • 441110
  • Pincode441110
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P50500056026
  • ReraGenie IDRG-MH-82197

Builder

  • NamePRABHAT JANAK GARG, CHANDANA JANAK GARG AND VIKAS JANAK GARG
  • Entity typeOthers
  • Named personsPRABHAT JANAK GARG, CHANDANA JANAK GARG, Vikas Janak Garg

Key dates

this monthRegisteredMay 2024PromisedMar 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 May 2024
  • Promised completion31 Mar 2027
  • Revised completionNone
  • BuildingsNot stated in filing
  • Documents filed73 files

Current status

29%10 of 35 units booked

Figures as on 15 May 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 15 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes91%
Water SupplyYes94%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes85%
Storm Water DrainsYes52%
Landscaping & Tree PlantingYes21%
Street LightingYes52%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes12%
Solid Waste Management And DisposalYes8%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes73%
Aggregate area of recreational Open SpaceYes81%
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,024 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityNagpur Metropolitan Region Development Authority

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchTRIVEDI BUILDIN, COFFEE HOUSE SQUARE, DHARAMPETH, NAGPUR 440010

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSachin Waghmare
ArchitectAGRASEN ARCHITECTS
EngineerRohit Dhone
EngineerSARANG AGRAWAL
Chartered AccountantCA ANKIT TALREJA
Chartered AccountantSUMIT SANTOSH AGRAWAL & ASSOCIATES
PartnerRole in project
PRABHAT JANAK GARG, CHANDANA JANAK GARG AND VIKAS JANAK GARG-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 2 Apr 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Apr 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Apr 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Mar 2027

Documents filed73

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM-1 DEC-25 BRINDABAN ELITE.pdf15 May 2026
Withdrawal Update Form 1File: FORM-1 BRINDABAN ELITE MAR-2026.pdf15 May 2026
Withdrawal Update Form 2File: FORM 2 DECEMBER 2025.pdf15 May 2026
Withdrawal Update Form 2File: FORM 2 MARCH 2026.pdf15 May 2026
Withdrawal Update Form 3File: FORM-3 BRINDABAN ELITE DEC-2025.pdf15 May 2026
Withdrawal Update Form 3File: form 3 Brindaban elite march 2026.pdf15 May 2026
Withdrawal Update Form 1File: FORM-1 SEPT-25 GENERATED.pdf19 Apr 2026
Withdrawal Update Form 2File: FORM-2 SEPT-25.pdf19 Apr 2026
Withdrawal Update Form 3File: FORM-3 SEPT-25 SCANNED COMPRESSED.pdf19 Apr 2026
Withdrawal Update Form 1File: FORM-1 SEPT-25 GENERATED.pdf20 Jan 2026
Withdrawal Update Form 2File: FORM-2 SEPT-25.pdf20 Jan 2026
Withdrawal Update Form 3File: FORM-3 SEPT-25 SCANNED COMPRESSED.pdf20 Jan 2026
Form 5 (FY 2024-2025)File: FORM-5 MAR-25 SCANNED.pdf5 Nov 2025
Withdrawal Update Form 1File: FORM-1 JUN-25 GENERATED.pdf4 Nov 2025
Withdrawal Update Form 1File: FORM-1 SEPT-25 GENERATED.pdf4 Nov 2025
Withdrawal Update Form 2File: FORM-2 JUN-25.pdf4 Nov 2025
Withdrawal Update Form 2File: FORM-2 SEPT-25.pdf4 Nov 2025
Withdrawal Update Form 3File: FORM-3 JUN-25 SCANNED COMPRESSED.pdf4 Nov 2025
Withdrawal Update Form 3File: FORM-3 SEPT-25 SCANNED COMPRESSED.pdf4 Nov 2025
form 1 brindaban29 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Architect’s Certificate of Percentage of Completion of Work (Form 1) (2).pdf21 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BE-3.pdf21 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: BE-2.pdf21 Apr 2025
Disclosure of sold/ booked inventoryFile: BE Sold.pdf21 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Brindaban Elite_Dec-24.pdf2 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Brindaban Elight_Jun-24.pdf18 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 Brindaban Elight_Sep-24.pdf18 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Brindaban Elite_Sep-24.pdf25 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_SEP-24.pdf23 Nov 2024
Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD_JUNE-24.pdf23 Nov 2024
Disclosure of sold/ booked inventoryFile: SOLD-UNSOLD_SEP-24.pdf23 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3_JUNE-24.pdf19 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Brindavan Elite Form 1 June 2024-page-001.pdf19 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BRINDABAN ELITE_FORM-3.pdf18 Apr 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BRINDABAN ELITE_FORM-3.pdf18 Apr 2024
Other - FinanceFile: POA.pdf18 Apr 2024
Other - TechnicalFile: Annexure-A.pdf18 Apr 2024
Other - FinanceFile: 1 Other - Technical (8).pdf16 Apr 2024
Other - TechnicalFile: CC.pdf16 Apr 2024
Layout approvalFile: MAP.pdf2 Apr 2024
Building plan approval or NA orderFile: MAP.pdf2 Apr 2024
PAN CardFile: PRABHAT PAN.pdf2 Apr 2024
PAN CardFile: vikas garg pan.pdf2 Apr 2024
PAN CardFile: PAN-CHANDANA GARG.pdf2 Apr 2024
Copy of the legal title reportFile: Search Report -vikas garg (1).pdf2 Apr 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Certificate Finance.pdf2 Apr 2024
Details of encumbrances concerned to FinanceFile: Encumbrance Certificate Legal.pdf2 Apr 2024
Details of encumbrances concerned to LegalFile: Encumbrance Certificate Finance.pdf2 Apr 2024
Details of encumbrances concerned to LegalFile: Encumbrance Certificate Legal.pdf2 Apr 2024
Copy of Layout Approval (in case of layout)File: MAP.pdf2 Apr 2024
Building Plan Approval / NA Order for plotted developmentFile: MAP.pdf2 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: NA_.pdf2 Apr 2024
Commencement Certificates / NA Order for plotted developmentFile: na-2.pdf2 Apr 2024
Declaration about Commencement CertificateFile: form d (2) _Brindaban.pdf2 Apr 2024
Declaration in FORM BFile: 1 Declaration in FORM B (24).pdf2 Apr 2024
CERSAI detailsFile: Cersai.pdf2 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Int prabhat garg.pdf2 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of int Chandana garg.pdf2 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of int Vikas garg.pdf2 Apr 2024
Proforma of Allotment letterFile: Allotment letter.pdf2 Apr 2024
Proforma of Agreement for saleFile: Agreement to Sale -BRINDABAN ELITE (1).pdf2 Apr 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: bank.pdf2 Apr 2024
Deviation Report with respect to Allotment letterFile: Deviation Allotment_Brindavan Elite.pdf2 Apr 2024
Deviation Report with respect to model copy of AgreementFile: Deviation report Agreement to Sale.pdf2 Apr 2024
Other - LegalFile: GIFT DEED_compressed (1)-1-15.pdf2 Apr 2024
Other - LegalFile: GIFT DEED_compressed (1)-16-31.pdf2 Apr 2024
Other - LegalFile: sale deed_.pdf2 Apr 2024
Other - LegalFile: Deed of Correction-part-1_mixed_compressed-1-15.pdf2 Apr 2024
Other - LegalFile: Deed of Correction-part-1_mixed_compressed-16-25.pdf2 Apr 2024
Other - LegalFile: Deed of Correction-part-1_mixed_compressed-26-35.pdf2 Apr 2024
Other - LegalFile: Deed of Correction-part-1_mixed_compressed-36-45.pdf2 Apr 2024
Other - LegalFile: Deed of Correction-part-1_mixed_compressed-46-62.pdf2 Apr 2024
Other - TechnicalFile: DECLARATION (1).pdf2 Apr 2024

How this compares with Nagpur

29%of this project is bookeddistrict median 35%
13%of Nagpur projects moved their completion datethis one has not
22%of Nagpur registrations have lapsed or been cancelledthis one is on the register

Computed across the 2,800+ Nagpur projects on ReraGenie, from their own filings.

Free monthly report: Nagpur on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep BRINDABAN ELITE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BHILGAON2,800+ in Nagpur

2 kmBRINDABAN ELITECompleted 6Lapsed / revoked 2Other 17Dot size: filed unitsN

Filed coordinates, straight-line distance. 25 registered projects within 2 km.

Builder: PRABHAT JANAK GARG, CHANDANA JANAK GARG AND VIKAS JANAK GARG

PRABHAT JANAK GARG, CHANDANA JANAK GARG AND VIKAS JANAK GARG has 1 registration on MahaRERA, including BRINDABAN ELITE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Nagpur district page.

Frequently asked questions

What are my rights if BRINDABAN ELITE is delayed beyond 31 Mar 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BRINDABAN ELITE?

The registered promoter entity is PRABHAT JANAK GARG, CHANDANA JANAK GARG AND VIKAS JANAK GARG, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BRINDABAN ELITE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BRINDABAN ELITE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BRINDABAN ELITE?

The professionals named in the filing: Architect: Sachin Waghmare; Architect: AGRASEN ARCHITECTS; Engineer: Rohit Dhone; Engineer: SARANG AGRAWAL; Chartered Accountant: CA ANKIT TALREJA; Chartered Accountant: SUMIT SANTOSH AGRAWAL & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BRINDABAN ELITE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BRINDABAN ELITE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BRINDABAN ELITE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.