Registered No litigation declared Residential / Group Housing project

Bougainvillea

By Richa Realtors Private Ltd.

RG-MH-40949 · RERA P51800010842 · Last updated on MahaRERA portal: 2 Dec 2025

Source: official MahaRERA filing

Red flags

  • 9 complaints at MahaRERA
  • Completion date moved by 92 months
  • 7 extensions taken

Clear

  • No litigation declared
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedmoved 92 months from the original
10 of 11Construction stages donefurthest along: Sanitary Fittings within the flats /..., 80%
6 of 35Units unsoldnot recorded sold or booked
9Complaints at MahaRERAon this registration
Jump to the 114 documents Report an error

Bougainvillea is a Residential / Group Housing project by Richa Realtors Private Ltd. in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800010842 on 31 Aug 2017. Possession is promised by 31 Dec 2026. The completion date has moved by 92 months from the original filing. 29 of the 35 units on this registration are recorded sold or booked, and 10 of 11 construction stages are filed complete. 9 complaints are on record with the regulator.

At a glance

Project

  • NameBougainvillea
  • TypeResidential / Group Housing
  • Location
    • Sundar Nagar
    • Kalina
    • Andheri
    • Mumbai Suburban
    • 400098
  • Pincode400098
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800010842
  • ReraGenie IDRG-MH-40949

Builder

  • NameRicha Realtors Private Ltd.
  • Entity typeCompany
  • Managing DirectorPrakash Sharad Joshi
  • Declared earlier projects3 →

Key dates

this monthRegisteredAug 2017First promiseApr 2019Revised toDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on31 Aug 2017
  • Promised completion31 Dec 2026
  • Revised completionRevised to 31 Dec 2026 (originally 30 Apr 2019)
  • Buildings1 building record
  • Documents filed114 files

Current status

83%29 of 35 units booked
80.6%Work done, per cost certificate

Figures as on 2 Dec 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BougainviellaNA151235035

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 2 Dec 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 11 construction stages are filed complete. The stage furthest along is Sanitary Fittings within the flats / premises, at 80%.

Bougainviella: 98% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises80%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 2 Dec 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes95%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed46

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots46
Closed/Covered1
Open Space45

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area1,676 sq m
Land owned byThe promoter
Named landownersNone

Approvals and building plan

Sanctioning authorityMaharashtra Housing and Area Development Authority
Permissible FSI7958.57
Proposed, not sanctioned6,776 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchGround Floor Ashford chambers L J Road Mahim West Mumbai-16
Estimated costRs 33.64 cr
Cost incurredRs 27.13 cr
Work done80.64%
BuildingWingEstimatedIncurred
BougainviellaNARs 28.30 crRs 21.78 cr
-NARs 5.35 crRs 5.35 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectJ G Kawa And Associates
ArchitectMilan Bharat Kholia
EngineerManohar Ashtavadhani
EngineerBharat Kholia
Chartered AccountantTarang Savla
Chartered AccountantYash Ravasa
PartnerRole in project
Richa Realtors Private Ltd.-

Extensions applied for7

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51800012254Apr 2019 → Mar 2023

Reason as filed by the promoterDue to COVID-19

EXT51800002220Apr 2019 → Apr 2020

Reason as filed by the promoterWherein we have submitted revised completion date of the project as 1st April, 2020. We hereby regretfully, inform you that we will not be able to complete the said project Till April,2019. The said delay is not deliberate butsome unavoidable circumstances are forced us to delay the project. Following are the chronological events which will explain the said delay details uploaded We have received Commencement Certificate on dated 27th May 2019 We have also initiated process of construction

EXT51800008565Apr 2019 → May 2021

Reason as filed by the promoterWe have taken extension from 30.04.2019 to 30.04.2020 due to different circumstances and details of the same was also uploaded while taking extension considering previous circumstances along with pandemic situation we request you to give us extension 31st May, 2021. Even in this situation we have completed 75% of work and putting our efforts to complete prior to extension date.

EXT51800018894Apr 2019 → Aug 2024

Reason as filed by the promoterDue to non-corporation of some existing customers

EXT51800017740Apr 2019 → Dec 2023

Reason as filed by the promoterDue to Financial issue Project was delayed now we are completed 90% please find the consent

EXT51800025975Apr 2019 → Aug 2025

Reason as filed by the promoterfinancial issues

EA02122518500Apr 2019 → Dec 2026

Reason as filed by the promoterInitially, the progress of the project was severely affected by the COVID-19 pandemic, which caused restrictions on labour availability, material supply, and overall construction activity. Subsequently, the project faced financial constraints. Further, certain clients stopped making their scheduled payments, which directly impacted the project cash flow. Due to these combined challenges, the project execution slowed down, and the unsold flats could not be sold in time, making it difficult to raise the necessary funds for uninterrupted progress.

Complaints filed with MahaRERA9

Case no.ComplainantRespondentFiled
CC006000000056561Anthony Anil Noronha & Shaila NoronhaRicha Realtors Pvt Ltd13/10/2018
CC006000000192842Kuruppancheril Shiju JohnRicha Realtors Pvt Ltd03/03/2020
CC006000000192844Vishwanath K ShettyRicha Realtors Pvt Ltd03/03/2020
CC006000000193302Mr. Vivek ShyamasundarRicha Realtors Pvt Ltd.20/06/2020
CC006000000209881Soumya NichaniRicha Realtors Private Limited04/02/2022
CC006000000210101Anthony Anil NoronhaRicha Realtors Pvt. Ltd.21/02/2022
CC006000000210425Shamshad S. KhanRicha Realtors Pvt. Ltd17/03/2022
CC006000000220748Tasneem Ahmed Afaque AnsariRicha Realtors Pvt Ltd09/04/2022
CC006000000590958abneesh kumar royRICHA REALTORS10/07/2024

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Sep 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Dec 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Dec 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 2 Dec 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed114

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 114 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Commencement certificateFile: Full CC.pdf2 Dec 2025
Layout approvalFile: Layout.pdf2 Dec 2025
Building plan approvalFile: page2.pdf2 Dec 2025
Building plan approvalFile: page3.pdf2 Dec 2025
Building plan approvalFile: page4.pdf2 Dec 2025
Building plan approvalFile: page5.pdf2 Dec 2025
Building plan approvalFile: page6.pdf2 Dec 2025
Building plan approvalFile: page7.pdf2 Dec 2025
Withdrawal Update Form 1File: FORM 1 - BOUGAINVILLE SEPTEMBER 2025 (1).pdf2 Dec 2025
Withdrawal Update Form 2File: Form 2 - Bouganvillae 30 Sept 2025.pdf2 Dec 2025
Withdrawal Update Form 3File: form 3 sept 2025 (1).pdf2 Dec 2025
Form 2A (FY 2024-2025)File: Form 2A FY 2024-25 C.pdf2 Dec 2025
Form 5 (FY 2024-2025)File: Form 5 (1).pdf2 Dec 2025
Withdrawal Update Form 1File: FORM 1 - BOUGAINVILLE JUNE 2025 (1).pdf1 Dec 2025
Withdrawal Update Form 2File: Form 2 - Bouganvillae 30 June 2025.pdf1 Dec 2025
Withdrawal Update Form 3File: Form 3 June 2025.pdf1 Dec 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 - BOUGAINVILLEA JUNE 2024.pdf28 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 - BOUGAINVILLEA SEPTEMBER 2024.pdf28 Mar 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM 1 - BOUGAINVILLEA DECEMBERR 2024.pdf28 Mar 2025
Certificates of CA (Form 3)File: Form-3 June-24_compressed.pdf28 Mar 2025
Certificates of CA (Form 3)File: Form-3 Sep-24_compressed.pdf28 Mar 2025
Certificates of CA (Form 3)File: Form-3 Dec-24_compressed.pdf28 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 Jun-2024.pdf28 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form-2 Sep-2024.pdf28 Mar 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form -2 Dec-24.pdf28 Mar 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold and unsold.pdf28 Mar 2025
Other - TechnicalFile: Pert Chart.pdf28 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Quality Certificate March-24.pdf28 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf28 Mar 2025
Declaration in FORM BFile: Form B.pdf13 Mar 2025
Other - LegalFile: Reply (CC006000000590958).pdf4 Mar 2025
Certificates of CA (Form 3)File: Form 3 March 24-1.pdf10 May 2024
Layout approvalFile: layout sunder nagar.pdf20 Apr 2024
Copy of Layout Approval (in case of layout)File: layout sunder nagar.pdf20 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of interest .pdf15 Apr 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Disclosure of Interest in other .pdf15 Apr 2024
Declaration in FORM BFile: FROM-B.pdf11 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 dec 23.pdf11 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1 march 24.pdf11 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 dec 23.pdf11 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 march 24.pdf11 Apr 2024
Certificates of CA (Form 3)File: form 3 dec 24.pdf11 Apr 2024
Certificates of CA (Form 3)File: form 3 march 24.pdf11 Apr 2024
Disclosure of sold/ booked inventoryFile: doc05297920240314124016.pdf14 Mar 2024
Disclosure of sold/ booked inventoryFile: doc05297920240314124016.pdf14 Mar 2024
Declaration about Commencement CertificateFile: Declaration about commencement certificate.pdf5 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer certificate MARCH 2020.pdf5 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Engineer certificate MARCH 2021.pdf5 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Engineer certificate MARCH 2022.pdf5 Mar 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineer certificate MARCH 2023.pdf5 Mar 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory.pdf5 Mar 2024
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about separate bank.pdf5 Mar 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Mar 18.pdf22 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Mar 19.pdf22 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Mar 20.pdf22 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Mar 21.pdf22 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Dec 22.pdf22 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Mar 23.pdf22 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: June 23.pdf22 Nov 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Sept 23.pdf22 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Mar 18.pdf22 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Mar 19.pdf22 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Mar 20.pdf22 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Mar 21.pdf22 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Mar 22.pdf22 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Dec 22.pdf22 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Mar 23.pdf22 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: June 23.pdf22 Nov 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Sept 23.pdf22 Nov 2023
Certificates of CA (Form 3)File: Form-3 Mar 18.pdf22 Nov 2023
Certificates of CA (Form 3)File: Form-3 Mar 19.pdf22 Nov 2023
Certificates of CA (Form 3)File: Form - 3 Mar 20.pdf22 Nov 2023
Certificates of CA (Form 3)File: Form-3 Mar 21.pdf22 Nov 2023
Certificates of CA (Form 3)File: Form-3 Mar 22.pdf22 Nov 2023
Certificates of CA (Form 3)File: Form-3 Dec 22.pdf22 Nov 2023
Certificates of CA (Form 3)File: Form-3 Mar 23.pdf22 Nov 2023
Certificates of CA (Form 3)File: Form-3 June 23.pdf22 Nov 2023
Certificates of CA (Form 3)File: Form-3 Sept 23.pdf22 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2017-18)File: Form-5 17-18.pdf22 Nov 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2018-19)File: Form-5 18-19.pdf22 Nov 2023

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 delivered late
ProjectLocationFlatsStatusPromisedDelivered
exoticaVileparle W26CompletedJan 2010Late, Feb 2010
Emerald ResidencyMahim29CompletedMay 2009Late, Mar 2010
Gandhar Tower C wingPrabhadevi7CompletedAug 2008Late, Sep 2008

How this compares with Mumbai Suburban

83%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one moved by 92 months
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Bougainvillea on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kalina6,700+ in Mumbai Suburban

2 kmBougainvilleaCompleted 56Lapsed / revoked 57Other 71Dot size: filed unitsN

Filed coordinates, straight-line distance. 184 registered projects within 2 km.

Builder: Richa Realtors Private Ltd.

Richa Realtors Private Ltd. has 1 registration on MahaRERA, including Bougainvillea. Its filings disclose 3 earlier MahaRERA projects: declares 0 of 3 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if Bougainvillea is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Bougainvillea?

The registered promoter entity is Richa Realtors Private Ltd., a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Bougainvillea?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against Bougainvillea?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for Bougainvillea?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Bougainvillea?

The professionals named in the filing: Architect: J G Kawa And Associates; Architect: Milan Bharat Kholia; Engineer: Manohar Ashtavadhani; Engineer: Bharat Kholia; Chartered Accountant: Tarang Savla; Chartered Accountant: Yash Ravasa. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Bougainvillea?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Bougainvillea. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Bougainvillea to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.