Home / Browse projects / Pune, Maharashtra / BOSTON D-E-F

Registered No litigation declared Residential / Group Housing project

BOSTON D-E-F

By R P PROPERTIES

RG-MH-19230 · RERA P52100078307 · Last updated on MahaRERA portal: 21 Apr 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Sep 2027Possession promisedno revision filed
12 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 16%
279 of 543Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 87 documents Report an error

BOSTON D-E-F is a Residential / Group Housing project by R P PROPERTIES in Pune, Maharashtra, registered with MahaRERA as P52100078307 on 4 Dec 2024. Possession is promised by 30 Sep 2027. 264 of the 543 units on this registration are recorded sold or booked, and 12 of 33 construction stages are filed complete.

At a glance

Project

  • NameBOSTON D-E-F
  • TypeResidential / Group Housing
  • Location
    • D Y PATIL ROAD
    • CHARHOLI
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • RERA no.P52100078307
  • ReraGenie IDRG-MH-19230

Builder

  • NameR P PROPERTIES
  • Entity typePartnership
  • PartnerARVIND JAIN
  • Other registrations2 more →

Key dates

this monthRegisteredDec 2024PromisedSep 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on4 Dec 2024
  • Promised completion30 Sep 2027
  • Revised completionNone
  • Buildings3 building records
  • Documents filed87 files

Current status

49%264 of 543 units booked
33.8%Work done, per cost certificate

Figures as on 21 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BOSTON ENA27231810181
BOSTON FNA27231810181
BOSTON DNA27231810181

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 21 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 16%.

BOSTON E38%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure16%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BOSTON F38%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure16%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BOSTON D38%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure16%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed543

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots543
Closed/Covered543
BuildingClosed/CoveredTotal
BOSTON E181181
BOSTON F181181
BOSTON D181181

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area4,725 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on16 Jul 2025

Approvals and building plan

Sanctioning authorityPIMPRI CHINCHWAD MUNICIPAL CORPORATION
Permissible FSI51071.14
Proposed, not sanctioned14,003 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchICICI Bank Ltd., Satguru House 362/6, CTS. No. 30, Ground Floor, Bund Garden Road, Pune.411001
Estimated costRs 136.07 cr
Cost incurredRs 46.01 cr
Work done33.81%
BuildingWingEstimatedIncurred
BOSTON ENARs 34.12 crRs 5.49 cr
BOSTON FNARs 34.12 crRs 4.92 cr
BOSTON DNARs 34.12 crRs 5.35 cr
-NARs 33.71 crRs 30.26 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectRAHUL ARUN NIKAM
EngineerVaibhav Bapurao jadhav
EngineerSHANTANU GANJAVE
Chartered AccountantAMITSATISH SHINGVI
Chartered AccountantSAC &Co LLP
Chartered AccountantShah Khandelwal Jain and Associates
PartnerRole in project
R P PROPERTIES-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 10 Oct 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Feb 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Feb 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 10 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Sep 2027

Documents filed87

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 2A (FY 2025-2026)File: QTY ASSURANCE CERT FORM 2A BOSTON DEF.pdf21 Apr 2026
Withdrawal Update Form 1File: Form 1 Bosotn DEF.pdf16 Apr 2026
Withdrawal Update Form 2File: Form 2 Bosotn DEF.pdf16 Apr 2026
Withdrawal Update Form 3File: Form 3-Boston DEF.pdf16 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf30 Jan 2026
Withdrawal Update Form 2File: Form 2.pdf30 Jan 2026
Withdrawal Update Form 3File: Form 3.pdf30 Jan 2026
Form 5 (FY 2024-2025)File: System Generated Form 5 Boston DEF upload.pdf2 Dec 2025
Withdrawal Update Form 1File: Form 1.pdf26 Nov 2025
Withdrawal Update Form 2File: Form 2.pdf26 Nov 2025
Withdrawal Update Form 3File: Form 3.pdf26 Nov 2025
Form 1File: Form 1.pdf16 Oct 2025
Form 2File: Form 2.pdf16 Oct 2025
Form 3File: Form 3.pdf16 Oct 2025
Disclosure of Sold and Booked InventoryFile: Sold circular.pdf16 Oct 2025
Form 1File: ARCHITECT CERT BOSTON DEF 30062025.pdf16 Oct 2025
Form 2File: ENGINEER CERT BOSTON DEF 30062025.pdf16 Oct 2025
Form 3File: Form 3.pdf16 Oct 2025
Disclosure of Sold and Booked InventoryFile: SOld circular.pdf16 Oct 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Boston D E F.pdf18 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERT BOSTON DEF 31032025.pdf11 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERT BOSTON DEF 31032025.pdf11 Apr 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QTY ASSURANCE CERT BOSTON DEF 31032025.pdf11 Apr 2025
Layout approvalFile: BOSTON LAYOUT 2025compressed.pdf11 Feb 2025
Building plan approvalFile: BOSTONBLD D REFUGE FLOOR PLAN 2025.pdf11 Feb 2025
Building plan approvalFile: BOSTONBLD D 1ST TYP FLOOR PLAN 2025.pdf11 Feb 2025
Building plan approvalFile: BOSTONBLD D BASAMENT FLOOR PLAN 2025.pdf11 Feb 2025
Building plan approvalFile: BOSTONBLD E 1ST TYP FLOOR PLAN 2025.pdf11 Feb 2025
Building plan approvalFile: BOSTONBLD E PARKING FLOOR PLAN 2025.pdf11 Feb 2025
Building plan approvalFile: BOSTONBLD E REFUGE FLOOR PLAN 2025.pdf11 Feb 2025
Building plan approvalFile: BOSTONBLD F 1ST TYP FLOOR PLAN 2025.pdf11 Feb 2025
Building plan approvalFile: BOSTONBLD F PARKING FLOOR PLAN 2025.pdf11 Feb 2025
Building plan approvalFile: BOSTONBLD F REFUGE FLOOR PLAN 2025.pdf11 Feb 2025
Copy of Layout Approval (in case of layout)File: BOSTON LAYOUT 2025compressed.pdf11 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: BOSTONBLD D REFUGE FLOOR PLAN 2025.pdf11 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: BOSTONBLD D 1ST TYP FLOOR PLAN 2025.pdf11 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: BOSTONBLD D BASAMENT FLOOR PLAN 2025.pdf11 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: BOSTONBLD E 1ST TYP FLOOR PLAN 2025.pdf11 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: BOSTONBLD E PARKING FLOOR PLAN 2025.pdf11 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: BOSTONBLD E REFUGE FLOOR PLAN 2025.pdf11 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: BOSTONBLD F 1ST TYP FLOOR PLAN 2025.pdf11 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: BOSTONBLD F PARKING FLOOR PLAN 2025.pdf11 Feb 2025
Building Plan Approval / NA Order for plotted developmentFile: BOSTONBLD F REFUGE FLOOR PLAN 2025.pdf11 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERT BOSTON DEF 16012025.pdf20 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certi BOSTON D E F.pdf10 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERT BOSTON DEF 31122024.pdf10 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: QUALITY CERT BOSTON D E F.pdf10 Jan 2025
Other - FinanceFile: DECLARATION ABOUT SANCTION FSI BOSTON DEF 18112024.pdf21 Nov 2024
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE LETTER LEGAL BOSTON DEF 09102024.pdf8 Nov 2024
Details of encumbrances concerned to LegalFile: ENCUMBRANCE LETTER LEGAL BOSTON DEF 09102024.pdf8 Nov 2024
Other - TechnicalFile: R P Properties.pdf25 Oct 2024
Other - TechnicalFile: DECLARATION CUM UNDERTAKING BOSTON DEF 22102024.pdf22 Oct 2024
Letter from the bank regarding the opening of RERA Designated Bank Accounts (Format B)File: FORMAT B BOSTON DEF.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: C A CERT FORM 3 BOSTON DEF 11102024.pdf16 Oct 2024
Proforma of Allotment letterFile: ALLOTMENT DRAFT.pdf11 Oct 2024
Declaration in FORM BFile: FORM B AFFIDAVIT CUM DECLARATION BOSTON DEF10102024.pdf11 Oct 2024
Proforma of Agreement for saleFile: DRAFT AGREEMENT.pdf11 Oct 2024
Building plan approvalFile: TYPICAL FLOOR PLAN D BUILDING.pdf10 Oct 2024
Building plan approvalFile: STILT FLOOR PLAN.pdf10 Oct 2024
Building plan approvalFile: BASEMENT 3 PLAN.pdf10 Oct 2024
Building plan approvalFile: BASEMENT 2 PLAN.pdf10 Oct 2024
Building plan approvalFile: BASEMENT 1 PLAN.pdf10 Oct 2024
Building plan approvalFile: 8TH 13TH FLOOR PLAN D BUILDING.pdf10 Oct 2024
Layout approvalFile: LAYOUT PLAN.pdf10 Oct 2024
PAN CardFile: R P Properties PAN CARD.pdf10 Oct 2024
Copy of the legal title reportFile: FORMAT A TITLE REPORT BOSTON DEF 10102024.pdf10 Oct 2024
Details of encumbrances concerned to FinanceFile: ENCUMBRANCE LETTER FINANCE BOSTON DEF 09102024.pdf10 Oct 2024
Copy of Layout Approval (in case of layout)File: LAYOUT PLAN.pdf10 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT CERT BOSTON DEF 01102024.pdf10 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER CERT BOSTON DEF 01102024.pdf10 Oct 2024
Commencement Certificates / NA Order for plotted developmentFile: COMMENCMENT CERTIFICATE.pdf10 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: TYPICAL FLOOR PLAN D BUILDING.pdf10 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: 8TH 13TH FLOOR PLAN D BUILDING.pdf10 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: BASEMENT 1 PLAN.pdf10 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: BASEMENT 2 PLAN.pdf10 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: BASEMENT 3 PLAN.pdf10 Oct 2024
Building Plan Approval / NA Order for plotted developmentFile: STILT FLOOR PLAN.pdf10 Oct 2024
Other - LegalFile: 7 12 R P PROPERTIES.pdf10 Oct 2024
Declaration about Commencement CertificateFile: FORMAT D DECLARATION CC BOSTON DEF 10102024.pdf10 Oct 2024
CERSAI detailsFile: CERSAI CERT BOSTON DEF 10102024.pdf10 Oct 2024

How this compares with Pune

49%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep BOSTON D-E-F on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near CHARHOLI13,700+ in Pune

Builder: R P PROPERTIES

R P PROPERTIES has 3 registrations on MahaRERA, including BOSTON A B C and SRIDHAM. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if BOSTON D-E-F is delayed beyond 30 Sep 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BOSTON D-E-F?

The registered promoter entity is R P PROPERTIES, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BOSTON D-E-F?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BOSTON D-E-F?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BOSTON D-E-F?

The professionals named in the filing: Architect: RAHUL ARUN NIKAM; Engineer: Vaibhav Bapurao jadhav; Engineer: SHANTANU GANJAVE; Chartered Accountant: AMITSATISH SHINGVI; Chartered Accountant: SAC &Co LLP; Chartered Accountant: Shah Khandelwal Jain and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BOSTON D-E-F?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BOSTON D-E-F. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BOSTON D-E-F to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.