Red flags

  • Completion date moved by 12 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
Nov 2024Possession promisedmoved 12 months from the original
0Complaints at RERA Karnatakaon this registration
Jump to the 88 documents Report an error

BOCHS Akshaya is a Residential/Group Housing project by Axis Concept Construction Private Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/120422/004833 on 12 Apr 2022. Possession is promised by 22 Nov 2024. The completion date has moved by 12 months from the original filing.

At a glance

Project

  • NameBOCHS Akshaya
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
    • 560068
  • Pincode560068
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/310/PR/120422/004833
  • ReraGenie IDRG-KA-76298

Builder

  • NameAxis Concept Construction Private Limited
  • Entity typeCompany
  • CINU45201KA2007PTC043841
  • GSTIN29AAHCA0685P1Z1
  • Authorized SignatoryR.Harish babu
  • DirectorR.HARISH BABU
  • DirectorsR HARISH BABU, JAYANTHI AMPALLI NAGARAJU
  • Project HeadR HARISH BABU
  • Other registrations1 more →
  • Declared earlier projects6 →

Key dates

this monthRegisteredApr 2022First promiseNov 2023Revised toNov 2024

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on12 Apr 2022
  • Promised completion22 Nov 2024
  • Revised completionRevised to 22 Nov 2024 (originally 22 Nov 2023)
  • Buildings1 building record
  • Documents filed88 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BOCHS Akshaya---64064

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 21 Feb 2022, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 21 Feb 2022, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalYes-
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyYes-
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseYes-
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksNoNot applicable
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-
Common storage spacesNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,010 sq m
Named landowners1
LandownerVillageDistrict
M.KUMARASWAMY RAJU--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 28.36 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 25.70 cr-
On-site expenditure-Salaries of workersRs 1.00 cr-
Payment of PremiumsRs 75.00 lakh-
On-site expenditure-Site OverheadRs 50.00 lakh-
On-site expenditure-Consultants FeesRs 26.46 lakh-
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 15.00 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVEENA H.
EngineerJafar Imam Sajid
Chartered AccountantCA G.Pattabhi Reddy

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EX/PRM/KA/RERA/1251/310/PR/240202/004833Nov 2023 → Nov 2024

Reason as filed by the promoterAwaiting OC

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed88

As listed on the registration, under the names the promoter filed them with; the newest 80 of 88 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/120422/004833 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Sale deed from Jayamma and others to NarayanarajuFile: 2004-03-17- Sale Deed - 26848 - 2003-04 Jayamma and ors to Narayanaraju.pdf21 Feb 2022
sale deed from Narayanaraju to ShantarajuFile: 2006-10-09- Absolute Sale Deed - 18061 - 2006-07 Narayana Raju to Shantaraju.pdf21 Feb 2022
Sub register value for landFile: Sub Registrar Value for Land Cost.pdf21 Feb 2022
Non Litigation AffidavitFile: Affidavit Non-litigation.pdf21 Feb 2022
KSPCB NOCFile: NOC-KSPCB.PDF21 Feb 2022
Engineer CertificateFile: Engineer Certificate.pdf21 Feb 2022
Architects certificateFile: ARCHITECT CERTIFICATE.pdf21 Feb 2022
STP DrawingFile: STP Drawing.pdf21 Feb 2022
Project SpecificationsFile: Project Specification.pdf21 Feb 2022
BESCOM NOCFile: Bescom NOC.pdf21 Feb 2022
BWSSB NOCFile: BWSSB NOC.pdf21 Feb 2022
Inventory DetailsFile: Inventory Details.pdf21 Feb 2022
Sale agreement DraftFile: RERA Sale Agreement - Akshaya.pdf21 Feb 2022
Sale Deed DraftFile: RERA-Sale deed-Draft final.pdf21 Feb 2022
RTC, survey 24-
Mutation, survey 24-
Encumbrance Certificate, survey 24-
Conversion/Alienation Order, survey 24-
Sale/Title/Gift Deed, survey 24-
JDA, survey 24-
Khatha, survey 24-
Registration CertificateFile: Certificate of Incorporation.pdf-
Organization Structure-
Certificate issued by CA Form 1-
Certificate issued by Architect Form 2-
Certificate issued by Engineer Form 3-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Affidavit.pdf-
Certificate from Chartered Account-
Balance Sheet 2020 - 2021File: 2020-21.pdf-
Balance Sheet 2019 - 2020File: 2019-20.pdf-
Balance Sheet 2018 - 2019File: 2018-19.pdf-
Audited Profit and Loss Statement 2020 - 2021File: 2020-21.pdf-
Audited Profit and Loss Statement 2019 - 2020File: 2019-20.pdf-
Audited Profit and Loss Statement 2018 - 2019File: 2018-19.pdf-
Director's Report 2020 - 2021File: 2020-21.pdf-
Director's Report 2019 - 2020File: 2019-20.pdf-
Director's Report 2018 - 2019File: 2018-19.pdf-
Cash Flow Statement 2020 - 2021File: 2020-21.pdf-
Cash Flow Statement 2019 - 2020File: 2019-20.pdf-
Auditor's Report 2020 - 2021File: 2020-21.pdf-
Auditor's Report 2019 - 2020File: 2019-20.pdf-
Auditor's Report 2018 - 2019File: 2018-19.pdf-
Income Tax Return Acknowledgement 2019 - 2020File: 2019-20.pdf-
Income Tax Return Acknowledgement 2018 - 2019File: 2018-19.pdf-
Building Licence-
Plan sanction-1-
Plan sanction-1-
Project Specification-
Search report-
Joint Development Agreement-
Release Deed from Harish to Kumaraswamy Raju-
Agreement to sell-
Allotment Letter-
Proforma Sale Deed-
Brochure-
Form-B-
Notorized Affidavit-
Affidavit-
Conversion Order-
Property tAX-
Sharing agreement-
Architect Certificate for Work Completion Schedule till DateFile: BOCHS Akshaya - ARCHITECT CERTIFICATE - Work completed.pdf-
Engineer Certificate for Work Completion Schedule till DateFile: BOCHS Akshaya - ENGINEERING CERTIFICATE - Work completed.pdf-
CA Certificate for Funds UtilizationFile: BOCHS Akshaya -CA certificate - fund utilized.pdf-
Architect Certificate for Pending Work Completion Schedule.File: BOCHS Akshaya - ARCHITECT CERTIFICATE - Pending work.pdf-
Engineer Certificate for Pending Work Completion Schedule.File: BOCHS Akshaya -ENGINEERING CERTIFICATE - Pending work.pdf-
CA Certificate for Funds required for Project CompletionFile: BOCHS Akshaya - CA certificate - funds required.pdf-
AffidavitFile: BOCHS Akshaya - Affidavit for Extension.pdf-
Latest Encumbrance CertificateFile: BOCHS Akshaya - Online EC.pdf-
Details Of Sold/ Un-sold UnitsFile: BOCHS Akshaya - Sold Unsold Details.xls-
Document 1File: BOCHS Akshaya - OC Letter Request.pdf-
Document 2File: Bescom NOC.pdf-
Document 3File: BWSSB NOC.pdf-
Document 4File: KSPCB CFE NOC.pdf-
Document 5File: BOCHS Akshaya - Form B Affidavit.pdf-
Stability CertificateFile: Stability Certificate.pdf-
Occupancy CertificateFile: Occupancy Certificate.pdf-

Promoter's earlier projects6

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

6 declared completed, no finish date filed
ProjectLocationStatusPromisedDelivered
VedamSurvey No. 131, New Survey No. 131/3C, portion of old Survey No. 131, New Survey No.131/3 New Survey No.131/4, Situated at Kothanur Village, Uttarahalli Hobli, Bangalore South TalukCompleted-No date filed
VanamSurvey No. 127/1A, Khatha No.111/127/1A Situated at Kothanur Village, Uttarahalli Hobli, Bangalore South TalukCompleted-No date filed
TatvamSurvey No.184, Situated at Kaggalipura Village ,Uttarahalli Hobli, Bangalore South TalukCompleted-No date filed
CitrinoHouse list No.543/12, 543/13, 543/14 & House list No.1, BBMP Khatha No.638/627/613/62/1/543/12, Bommanahalli Village Begur Hobli, Bangalore South TalukCompleted-No date filed
AntaraSurvey No.27/1, Survey No.27/2 Situated at Yelenahalli Village, Begur Hobli, Bangalore South TalukCompleted-No date filed
AmairoSite No.35, Khatha No.1293/2/35, New BBMP Khatha No.81/70/1293/2/35/81/35, Site No.36, BBMP Khatha No.479/476/36/3, at Sarakkikere Uttarahalli Hobli, Bangalore South talukCompleted-No date filed

How this compares with Bengaluru Urban

34%of Bengaluru Urban projects moved their completion datethis one moved by 12 months
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep BOCHS Akshaya on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmBOCHS AkshayaOther 26Dot size: filed unitsN

Filed coordinates, straight-line distance. 26 registered projects within 2 km.

Builder: Axis Concept Construction Private Limited

Axis Concept Construction Private Limited has 2 registrations on RERA Karnataka, including BOCHS Akshaya and AXIS ASHOKAM. Its filings declare 6 earlier projects, 6 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if BOCHS Akshaya is delayed beyond 22 Nov 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of BOCHS Akshaya?

The registered promoter entity is Axis Concept Construction Private Limited, a company as per the filing. Its CIN U45201KA2007PTC043841 and GSTIN 29AAHCA0685P1Z1 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in BOCHS Akshaya?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at BOCHS Akshaya?

The professionals named in the filing: Architect: VEENA H.; Engineer: Jafar Imam Sajid; Chartered Accountant: CA G.Pattabhi Reddy. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BOCHS Akshaya?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BOCHS Akshaya. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BOCHS Akshaya to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.