Home / Browse projects / Pune, Maharashtra / Bluegrass Residences Tower III

Registered No litigation declared Residential / Group Housing project

Bluegrass Residences Tower III

By Sagitarius Ecospaces LLP

RG-MH-71144 · RERA P52100050248 · Last updated on MahaRERA portal: 7 Sep 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 4 months
  • 1 extension taken
  • Rs 147.00 crore secured on the land, in favour of Axis Bank Ltd

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

3 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Apr 2027Possession promisedmoved 4 months from the original
9 of 19Construction stages doneacross 2 buildings; furthest along: Staircases, 85%
39 of 96Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 211 documents Report an error

Bluegrass Residences Tower III is a Residential / Group Housing project by Sagitarius Ecospaces LLP in Pune, Maharashtra, registered with MahaRERA as P52100050248 on 27 Mar 2023. Possession is promised by 30 Apr 2027. The completion date has moved by 4 months from the original filing. 57 of the 96 units on this registration are recorded sold or booked, and 9 of 19 construction stages are filed complete.

At a glance

Project

  • NameBluegrass Residences Tower III
  • TypeResidential / Group Housing
  • Location
    • West Avenue
    • Kalyani Nagar
    • Pune City
    • Opp Nagarwala School
    • Kalyani Nagar Pune
    • Pune (M Corp.)
    • Pune City
    • Pune
    • 411006
  • Pincode411006
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100050248
  • ReraGenie IDRG-MH-71144

Builder

  • NameSagitarius Ecospaces LLP
  • Entity typePartnership
  • GSTIN27ADIFS7077E1ZP
  • PartnerFarrokh Framji Wadia
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredMar 2023First promiseDec 2026Revised toApr 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on27 Mar 2023
  • Promised completion30 Apr 2027
  • Revised completionRevised to 30 Apr 2027 (originally 31 Dec 2026)
  • Buildings2 building records
  • Documents filed211 files

Current status

59%57 of 96 units booked
94.9%Work done, per cost certificate

Figures as on 7 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Bluegrass Residences Tower IIINA272593295
Bluegrass Sales Gallery Building FNA11011

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 7 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

9 of 19 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 85%.

Bluegrass Residences Tower III59%
ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)100%
Plinth0%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises61%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks85%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.41%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.44%
Bluegrass Sales Gallery Building F84%
ActivityProgress
Excavation100%
Basement (if any)Not applicable
Podiums (if any)100%
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises20%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.75%

Progress on shared amenities15

As on 7 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes75%
Water SupplyYes80%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes90%
Landscaping & Tree PlantingNoNot applicable
Street LightingYes50%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes80%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes90%
Electrical meter room, sub-station, receiving stationYes80%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed474

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots474
Closed/Covered418
Stilt / Ground56
BuildingClosed/CoveredStilt / GroundTotal
Bluegrass Residences Tower III4180418
Bluegrass Sales Gallery Building F05656

Land and ownership1

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area193,204 sq m
Land owned byNot the promoter
Named landowners1
Encumbrance on the landDeclared present
Charge in favour ofAxis Bank Ltd
Secured amountRs 147.00 crore
CERSAI search filedYes
Declared on8 Jul 2025
LandownerVillageDistrict
Farrokh Framji WadiaPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI23240.61
Proposed, not sanctioned23,241 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch214/215, 2nd Floor, Ganesh Khind, University Road, Pune - 411 007
Estimated costRs 166.44 cr
Cost incurredRs 158.00 cr
Work done94.93%
BuildingWingEstimatedIncurred
Bluegrass Residences Tower IIINARs 129.78 crRs 121.81 cr
-NARs 32.38 crRs 32.20 cr
Bluegrass Sales Gallery Building FNARs 4.28 crRs 3.99 cr

Certifying professionals and partners12

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPinnac Consulting Pvt Ltd
ArchitectPinnac Consulting Pvt. Ltd
EngineerKPM Design Services Pvt Ltd
EngineerWTP Cost Advisory Services India Private Limited
EngineerCBRE South Asia Pvt. Ltd.
EngineerJones Lang La Salle Property Consultants India Pvt Ltd
EngineerWT Cost management India Pvt Ltd
EngineerWTP Cost Advisory Services India Pvt Ltd
Chartered AccountantH Malkan & Associates
Chartered AccountantP D Kudva &Co.
Chartered AccountantP D Kudva & Co LLP
Chartered AccountantH. Malkan & Associates
PartnerRole in project
Sagitarius Ecospaces LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

P52100050248/WarDec 2026 → Apr 2027

Reason as filed by the promoterNA

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Dec 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 11 Aug 2025
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 11 Aug 2025
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Oct 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Apr 2027

Documents filed211

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 211 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: RERA Form 1 T3 June 2026.pdf7 Sep 2026
Withdrawal Update Form 2File: RERA Form 2 T3 June 2026.pdf7 Sep 2026
Withdrawal Update Form 3File: RERA Form 3 T3 June 2026.pdf7 Sep 2026
Form 2A (FY 2025-2026)File: T3 Form 2A March 2026.pdf31 Aug 2026
Withdrawal Update Form 1File: RERA Form 1 T3 June 2026.pdf19 Aug 2026
Withdrawal Update Form 2File: RERA Form 2 T3 June 2026.pdf19 Aug 2026
Withdrawal Update Form 3File: RERA Form 3 T3 June 2026.pdf19 Aug 2026
Withdrawal Update Form 1File: T3 Form 1 March 2026.pdf24 Apr 2026
Withdrawal Update Form 2File: T3 Form 2 March 2026.pdf24 Apr 2026
Withdrawal Update Form 3File: T3 Form 3 March 2026.pdf24 Apr 2026
Withdrawal Update Form 1File: T3 Form 1 -Dec 2025.pdf20 Jan 2026
Withdrawal Update Form 2File: T3 Form 2 -Dec 2025.pdf20 Jan 2026
Withdrawal Update Form 3File: T3 Form 3 -Dec 2025.pdf20 Jan 2026
Withdrawal Update Form 1File: Form 1 T3 Sept 2025.pdf31 Oct 2025
Withdrawal Update Form 2File: RERA Form 2 T3 June 2025.pdf31 Oct 2025
Withdrawal Update Form 3File: Form 3 T3 Sept 2025.pdf31 Oct 2025
Layout approvalFile: Layout Plan-43 21_05_25.pdf11 Aug 2025
Building plan approvalFile: plan 29-43 T3 Lower ground 21_05_25.pdf11 Aug 2025
Building plan approvalFile: plan 30-43 T3- Ground l 21_05_25.pdf11 Aug 2025
Building plan approvalFile: plan 31-43 T3 1st floor 21_05_25.pdf11 Aug 2025
Building plan approvalFile: plan 32-43 T3- 2nd floor plan 21_05_25.pdf11 Aug 2025
Building plan approvalFile: plan 33-43 T3- Typical floor 21_05_25.pdf11 Aug 2025
Building plan approvalFile: plan 34-43 T3- Refuge floor 21_05_25.pdf11 Aug 2025
Building plan approvalFile: plan 35-43 T3- 22nd floor Refuge 21_05_25.pdf11 Aug 2025
Building plan approvalFile: plan 36-43 T3- 24th floor 21_05_25.pdf11 Aug 2025
Building plan approvalFile: plan 37-43 T3- 25th floor plan 21_05_25.pdf11 Aug 2025
Building plan approvalFile: plan 38-43 T3- Section 21_05_25.pdf11 Aug 2025
Layout approvalFile: Layout plan 01-43.pdf11 Aug 2025
Withdrawal Update Form 1File: RERA Form 1 T3 June 2025.pdf4 Aug 2025
Withdrawal Update Form 2File: RERA Form 2 T3 June 2025.pdf4 Aug 2025
Withdrawal Update Form 3File: RERA Form 3 T3 June 2025.pdf4 Aug 2025
Layout approvalFile: Layout Plan-43 21_05_25.pdf16 Jul 2025
Building plan approvalFile: plan 29-43 T3 Lower ground 21_05_25.pdf16 Jul 2025
Building plan approvalFile: plan 30-43 T3- Ground l 21_05_25.pdf16 Jul 2025
Building plan approvalFile: plan 31-43 T3 1st floor 21_05_25.pdf16 Jul 2025
Building plan approvalFile: plan 32-43 T3- 2nd floor plan 21_05_25.pdf16 Jul 2025
Building plan approvalFile: plan 33-43 T3- Typical floor 21_05_25.pdf16 Jul 2025
Building plan approvalFile: plan 34-43 T3- Refuge floor 21_05_25.pdf16 Jul 2025
Building plan approvalFile: plan 35-43 T3- 22nd floor Refuge 21_05_25.pdf16 Jul 2025
Building plan approvalFile: plan 36-43 T3- 24th floor 21_05_25.pdf16 Jul 2025
Building plan approvalFile: plan 37-43 T3- 25th floor plan 21_05_25.pdf16 Jul 2025
Building plan approvalFile: plan 38-43 T3- Section 21_05_25.pdf16 Jul 2025
Form 5 (FY 2022-2023)File: Form 5 Tower 3 as of 31st March, 2023.pdf9 Jul 2025
Layout approvalFile: Layout Plan-43 21_05_25.pdf8 Jul 2025
Building plan approvalFile: plan 29-43 T3 Lower ground 21_05_25.pdf8 Jul 2025
Building plan approvalFile: plan 30-43 T3- Ground l 21_05_25.pdf8 Jul 2025
Building plan approvalFile: plan 31-43 T3 1st floor 21_05_25.pdf8 Jul 2025
Building plan approvalFile: plan 32-43 T3- 2nd floor plan 21_05_25.pdf8 Jul 2025
Building plan approvalFile: plan 33-43 T3- Typical floor 21_05_25.pdf8 Jul 2025
Building plan approvalFile: plan 34-43 T3- Refuge floor 21_05_25.pdf8 Jul 2025
Building plan approvalFile: plan 35-43 T3- 22nd floor Refuge 21_05_25.pdf8 Jul 2025
Building plan approvalFile: plan 36-43 T3- 24th floor 21_05_25.pdf8 Jul 2025
Building plan approvalFile: plan 37-43 T3- 25th floor plan 21_05_25.pdf8 Jul 2025
Layout approvalFile: plan 38-43 T3- Section 21_05_25.pdf8 Jul 2025
Withdrawal Update Form 1File: Form 1 T3 as of 31 March 2025.pdf8 Jul 2025
Withdrawal Update Form 1File: Form 1 T3 as of 31 March 2025.pdf8 Jul 2025
Withdrawal Update Form 2File: Form 2 T3 as of 31 March 2025.pdf8 Jul 2025
Withdrawal Update Form 2File: Form 2 T3 as of 31 March 2025.pdf8 Jul 2025
Withdrawal Update Form 3File: Form 3 T3 as of 31 March 2025.pdf8 Jul 2025
Withdrawal Update Form 3File: Form 3 T3 as of 31 March 2025.pdf8 Jul 2025
Form 2A (FY 2024-2025)File: Form 2A T3 as of 31 March 2025.pdf8 Jul 2025
Form 5 (FY 2023-2024)File: Form 5 T3 as of 31 March 2024.pdf8 Jul 2025
Form 1File: Form 1 T3 as of 30 June 2024.pdf20 Jun 2025
Form 2File: Form 2 T3 as of 30 June 2024.pdf20 Jun 2025
Form 3File: Form 3 T3 as of 30 June 2024.pdf20 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold T3 as of 30 June 2024.pdf20 Jun 2025
Form 1File: Form 1 T3 as of 31 March 2024.pdf20 Jun 2025
Form 2File: Form 2 T3 as of 31 March 2024.pdf20 Jun 2025
Form 3File: Form 3 T3 as of 31 March 2024.pdf20 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold T3 as of 31 March 2024.pdf20 Jun 2025
OthersFile: Form 2A T3 as of 31 March 2024.pdf20 Jun 2025
Form 1File: Form 1 T3 as of 31 Dec 2023.pdf20 Jun 2025
Form 2File: Form 2 T3 as of 31 Dec 2023.pdf20 Jun 2025
Form 3File: Form 3 T3 as of 31 Dec 2023.pdf20 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold T3 as of 31 Dec 2023.pdf20 Jun 2025
Form 1File: Form 1 T3 as of 30 Sept 2023.pdf20 Jun 2025
Form 2File: Form 2 T3 as of 30 Sept 2023.pdf20 Jun 2025
Form 3File: Form 3 T3 as of 30 Sept 2023.pdf20 Jun 2025
Disclosure of Sold and Booked InventoryFile: Sold Unsold T3 as of 30 Sept 2023.pdf20 Jun 2025
Form 1File: Form 1 T3 as of 31 Dec 2024.pdf10 Jun 2025

How this compares with Pune

59%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 4 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Bluegrass Residences Tower III on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Kalyani Nagar Pune13,700+ in Pune

2 kmBluegrass Residences TowCompleted 7Lapsed / revoked 6Other 18Dot size: filed unitsN

Filed coordinates, straight-line distance. 31 registered projects within 2 km.

Builder: Sagitarius Ecospaces LLP

Sagitarius Ecospaces LLP has 3 registrations on MahaRERA, including Bluegrass Residences - Tower I and Bluegrass Residences Tower II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Bluegrass Residences Tower III is delayed beyond 30 Apr 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Bluegrass Residences Tower III?

The registered promoter entity is Sagitarius Ecospaces LLP, a partnership as per the filing. Its GSTIN 27ADIFS7077E1ZP can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Bluegrass Residences Tower III?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Bluegrass Residences Tower III?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Bluegrass Residences Tower III?

The professionals named in the filing: Architect: Pinnac Consulting Pvt Ltd; Architect: Pinnac Consulting Pvt. Ltd; Engineer: KPM Design Services Pvt Ltd; Engineer: WTP Cost Advisory Services India Private Limited; Engineer: CBRE South Asia Pvt. Ltd.; Engineer: Jones Lang La Salle Property Consultants India Pvt Ltd. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Bluegrass Residences Tower III?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Bluegrass Residences Tower III. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Bluegrass Residences Tower III to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.