Birla Trimaya-Phase-I
RG-KA-83842 · RERA PRM/KA/RERA/1250/303/PR/300823/006200 · Last updated on RERA Karnataka portal: 15 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Birla Trimaya-Phase-I is a Residential/Group Housing project by BIRLA ARNAA LLP in Bengaluru Rural, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1250/303/PR/300823/006200 on 30 Aug 2023. Possession is promised by 31 Oct 2028. 556 of the 544 units on this registration are recorded sold or booked, and 1 of 18 construction stages are filed complete.
At a glance
Project
- NameBirla Trimaya-Phase-I
- TypeResidential/Group Housing
- Location
- Devanahalli
- Bengaluru Rural
- 562110
- Pincode562110
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1250/303/PR/300823/006200
- ReraGenie IDRG-KA-83842
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on30 Aug 2023
- Promised completion31 Oct 2028
- Revised completionNone
- Buildings8 building records
- Documents filed529 files
Current status
Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| 14 | - | - | - | 71 | 0 | 71 |
| 15 | - | - | - | 71 | 0 | 71 |
| 16 | - | - | - | 95 | 0 | 95 |
| 18 | - | - | - | 71 | 0 | 71 |
| 19 | - | - | - | 71 | 0 | 71 |
| 20 | - | - | - | 71 | 0 | 71 |
| 21 | - | - | - | 94 | 0 | 94 |
| 31A | - | - | - | 12 | 0 | 12 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
1 of 18 construction stages are filed complete. The stage furthest along is Foundation footing work, at 99%.
Building: 29% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 99% |
| Upto Plinth Level | 96% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 0% |
| Retaining wall (All types) | 95% |
| RCC or MS Framed structure | 99% |
| Masonry Construction | 0% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 30% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 0% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 0% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 0% |
| Use of renewable energy | Yes | 0% |
| Sewage Treatment Plant (STP) | Yes | 0% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | Yes | 0% |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | No | Not applicable |
| Power Backup | No | Not applicable |
| Piped Gas | No | Not applicable |
| Water and Sanitation | No | Not applicable |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 80% |
| Lifts | Yes | 80% |
| Corridor/Lobbies | Yes | 80% |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | No | Not applicable |
| Basement | Yes | 96% |
| Terrace | Yes | 0% |
| Outer Wall | No | Not applicable |
| Open parking areas | Yes | 0% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | No | Not applicable |
| Common storage spaces | No | Not applicable |
Land and ownership27
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| M/s.M.S.Ramaiah Realty LLP | - | - |
| M/s.M.S.Ramaiah Realty LLP | - | - |
| M.S.Ramaiah Realty LLP | - | - |
| M/s.M.S.Ramaiah Realty LLP | - | - |
| M.S.Ramaiah Realty LLP | - | - |
| M.S.Ramaiah Realty LLP | - | - |
| M/s. M.S.Ramaiah Realty LLP | - | - |
| M.S.Ramaiah Realty LLP | - | - |
| M.S.Ramaiah Realty LLP | - | - |
| M/s.M.S.Ramaiah Realty LLP | - | - |
| M.S.Ramaiah Realty LLP | - | - |
| M/s.M.S Ramaiah Realty LLP | - | - |
| M/s.Ramaiah Realty LLP | - | - |
| M.S.Ramaiah Realty LLP | - | - |
| M/s.M.S.Ramaiah Realty LLP | - | - |
| M/s.M.S.Ramaiah Realty LLP | - | - |
| M/s.M.S.Ramaiah Realty LLP | - | - |
| M/s.M.S.Ramaiah Realty LLP | - | - |
| Ms.M.S.Ramaiah Realty LLP | - | - |
| M/s.Ramaiah Realty LLP | - | - |
| M/s.M.S.Ramaiah Realty LLP | - | - |
| M/s.M.S.Ramaiah Realty LLP | - | - |
| M/s.Ramaiah Realty LLP | - | - |
| M/s.M.S.Ramaiah Realty LLP | - | - |
| M/s.Ramaiah Realty LLP | - | - |
| M/s.Ramaiah Realty LLP | - | - |
| M/s.M.S.Ramaiah Realty LLP | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 410.27 cr | Rs 11.13 cr |
| On-site expenditure-Site Overhead | - | Rs 1.66 cr |
| Payment of taxes | - | Rs 1.84 cr |
| Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC) | - | Rs 2.60 cr |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | V. NARASIMHAN |
| Engineer | Yogesh HP |
| Chartered Accountant | Anilkumar R. Gupta |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed529
As listed on the registration, under the names the promoter filed them with; the newest 80 of 529 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1250/303/PR/300823/006200 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: CA Certificate.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Architect Certificate.pdf | 15 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Engineer Certificate.pdf | 15 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 15 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Oct 2026 |
| Q2 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Oct 2026 |
| Q2 2026-27 KPTCL- BESCOM | 15 Oct 2026 |
| Q2 2026-27 Fire and Safety | 15 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 15 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form -4 CA Certificate - June 26 - Trimaya.pdf | 13 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architect Certificate QU June 26 Ph 1 - Trimaya.pdf | 13 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6, Engineer Certificate QU Jun-26 Ph 1 -Trimaya.pdf | 13 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 13 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 13 Jul 2026 |
| Q1 2026-27 KSPCB- MOEF (Above 50 Acres) | 13 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 13 Jul 2026 |
| Q1 2026-27 Fire and Safety | 13 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 13 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA certificate March 26.pdf | 14 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5 Architect QU Trimaya Ph -1 Mar 26.pdf | 14 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form-6 Engineer QU Trimaya I March 26.pdf | 14 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 14 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 14 Apr 2026 |
| Q4 2025-26 KSPCB- MOEF (Above 50 Acres) | 14 Apr 2026 |
| Q4 2025-26 KPTCL- BESCOM | 14 Apr 2026 |
| Q4 2025-26 Fire and Safety | 14 Apr 2026 |
| Q4 2025-26 Airport Authority of India | 14 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: form 4 CA Certificate OCt Nov Dec 2025.pdf | 14 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Architect QU Dec 25.pdf | 14 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer QU Dec 25.pdf | 14 Jan 2026 |
| Q3 2025-26 Water supply and sewage board | 14 Jan 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 14 Jan 2026 |
| Q3 2025-26 KSPCB- MOEF (Above 50 Acres) | 14 Jan 2026 |
| Q3 2025-26 KPTCL- BESCOM | 14 Jan 2026 |
| Q3 2025-26 Fire and Safety | 14 Jan 2026 |
| Q3 2025-26 Airport Authority of India | 14 Jan 2026 |
| CA CERTIFICATEFile: Form 1 Chartered Accountant.pdf | 24 Aug 2023 |
| AREA details of PHase IFile: Phase 1 area statement.pdf | 24 Aug 2023 |
| area details of project and Phase IFile: Total project Phase1 area.pdf | 24 Aug 2023 |
| birla aarna LLP partners Birla estates and MS ramaiah RealtyFile: Birla Arnaa LLP Deed.pdf | 24 Aug 2023 |
| Bank details mentioned in CAFile: Bank Details 1.pdf | 24 Aug 2023 |
| Profit and loss UDINFile: Final FS Birla Arnaa LLP 2022 and Balance sheet.pdf | 24 Aug 2023 |
| Signed financialsFile: BEPL_Signed Financial Mar-2023.pdf | 24 Aug 2023 |
| Self fund and bank loan if requiredFile: Letter for Funding to the Project.pdf | 24 Aug 2023 |
| Ca certificateFile: CA Certificate.pdf | 24 Aug 2023 |
| RTC Sy.No.13/1File: RTC 131 (1).pdf | 24 Aug 2023 |
| RTC Sy.No.15/1File: RTC 151 (1).pdf | 24 Aug 2023 |
| RTC Sy.No.17File: RTC 17.pdf | 24 Aug 2023 |
| RTC Sy.No.20File: RTC 20.pdf | 24 Aug 2023 |
| RTC Sy.No.3/1File: RTC 31.pdf | 24 Aug 2023 |
| rtc-20File: RTC 20 (1).pdf | 24 Aug 2023 |
| gift deed 8/2, 9/2, 10/2 and 11File: Gift deed 3469200506.pdf | 24 Aug 2023 |
| MR 8/2File: MR 82.pdf | 24 Aug 2023 |
| MR 9/2File: MR 92.pdf | 24 Aug 2023 |
| MR 10File: MR 10.pdf | 24 Aug 2023 |
| MR 11File: MR 11.pdf | 24 Aug 2023 |
| gift deed 12/2File: Gift deed 3470200506 (1).pdf | 24 Aug 2023 |
| gift deed 12/3File: Gift deed 3469200506.pdf | 24 Aug 2023 |
| OM 12/3File: OM 123.pdf | 24 Aug 2023 |
| rtc 13/1File: RTC 131 (1).pdf | 24 Aug 2023 |
| rtc 13/2File: RTC-13-2.pdf | 24 Aug 2023 |
| om 13/1File: OM 13.pdf | 24 Aug 2023 |
| om 13/2File: OM 13.pdf | 24 Aug 2023 |
| gift deed 13/1File: Gift deed 3469200506.pdf | 24 Aug 2023 |
| gift deed 13/2 and 14/1bFile: Gift deed 3470200506 (1).pdf | 24 Aug 2023 |
| rtc 15/1File: RTC 151.pdf | 24 Aug 2023 |
| rtc 15/1File: RTC 151 (1).pdf | 24 Aug 2023 |
| rtc 17File: RTC 17.pdf | 24 Aug 2023 |
| MR 15/1File: MR 151.pdf | 24 Aug 2023 |
| MR 17File: MR 17.pdf | 24 Aug 2023 |
| GIFT DEED 15/1 AND 17File: Gift deed 3468200506.pdf | 24 Aug 2023 |
| RTC 20/1File: RTC 20 (1).pdf | 24 Aug 2023 |
| RTC 20/2File: RTC 20 (2).pdf | 24 Aug 2023 |
| MR 37/7File: MR 377.pdf | 24 Aug 2023 |
| PARTNERSHIP DEED-MSRFile: MSSRLLPPartnershipdeed.pdf | 24 Aug 2023 |
| JDA WITH SY.NO. DETAILSFile: JDA Pages with Sy No details.pdf | 24 Aug 2023 |
| JDAFile: jda.pdf | 24 Aug 2023 |
| EC TILL DATEFile: EC 01042022 to 20072023.pdf | 24 Aug 2023 |
| CANCELLATION DEED TO JDAFile: Cancelation Deed.pdf | 24 Aug 2023 |
| Partial Release deed to JDAFile: OBLP PARTIAL RELEASE20220322063917.pdf | 24 Aug 2023 |
Promoter's earlier projects2
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| Project -2, Birla Tisya No.PRM/KA/RERA/1251/309/PR/211022/004371-Completion date: 31/12/2026 | Plot No. bearing No.11 (Old No.5), PID No.21-11-77, CTS No.3730 of Magadi Main Road, Agrahara Dasarahalli, Bangalore North, Bangalore | Ongoing | Dec 2027 | Not due yet |
| Project-1, Birla Alokya No. PRM/KA/RERA/1250/304/PR/190724/002725- Completion date: 31/05/2024 | Survey No.218,219,220 and Survey No.91,94, 95 of Koraluru Village & Thirumalashettyhalli Village, Soukya Road, Hoskote | Ongoing | May 2024 | Not delivered |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Rural
Computed across the 650+ Bengaluru Rural projects on ReraGenie, from their own filings.
Keep Birla Trimaya-Phase-I on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Rural650+ in Bengaluru Rural
Filed coordinates, straight-line distance. 9 registered projects within 2 km.
BARCA AT GODREJ MSR CITY
M S RAMAIAH VENTURES LLP
Prestige Parklane
APEX REALTY MANAGEMENT PRIVATE LIMITED
Sattva Vasanta Skye
Sattva Resi Private Limited
EMBASSY GREENSHORE
EMBASSY DEVELOPMENTS LIMITED
EMBASSY VERDE PHASE 2
EMBASSY DEVELOPMENTS LIMITED
Assetz Sora & Saki Phase 2
NETRA SOFTWARE TECHNOLOGIES PRIVATE LIMITE
See every Bengaluru Rural project, with the district possession charts
Builder: BIRLA ARNAA LLP
BIRLA ARNAA LLP has 4 registrations on RERA Karnataka, including BIRLA TRIMAYA PHASE-2 and BIRLA TRIMAYA PHASE-4. Its filings declare 8 earlier projects, 1 of them declared completed. Read the full track record. See more projects on the Bengaluru Rural district page.
Frequently asked questions
What are my rights if Birla Trimaya-Phase-I is delayed beyond 31 Oct 2028?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Birla Trimaya-Phase-I?
The registered promoter entity is BIRLA ARNAA LLP, a partnership firm as per the filing. Its GSTIN 29AAZFB1893R1Z4 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Birla Trimaya-Phase-I?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Birla Trimaya-Phase-I?
The professionals named in the filing: Architect: V. NARASIMHAN; Engineer: Yogesh HP; Chartered Accountant: Anilkumar R. Gupta. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Birla Trimaya-Phase-I?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.