Home / Browse projects / Bengaluru Rural, Karnataka / BIRLA TRIMAYA PHASE-3

Registration approved No litigation declared Residential/Group Housing project

BIRLA TRIMAYA PHASE-3

By BIRLA ARNAA LLP

RG-KA-11508 · RERA PRM/KA/RERA/1250/303/PR/300125/007458

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • Completion date never moved
Jump to the 42 documents Report an error

BIRLA TRIMAYA PHASE-3 is a Residential/Group Housing project by BIRLA ARNAA LLP in Bengaluru Rural, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1250/303/PR/300125/007458 on 30 Jan 2025. Possession is promised by 31 Aug 2030.

At a glance

Project

  • NameBIRLA TRIMAYA PHASE-3
  • TypeResidential/Group Housing
  • Location
    • Devanahalli
    • Bengaluru Rural
    • 562110
  • Pincode562110
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1250/303/PR/300125/007458
  • ReraGenie IDRG-KA-11508

Builder

  • NameBIRLA ARNAA LLP
  • Entity typePartnership Firm
  • LLPINABA-8025
  • GSTIN29AAZFB1893R1Z4
  • Authorized SignatoryMr. Naveen N
  • Other registrations3 more →
  • Declared earlier projects8 →

Key dates

this monthRegisteredJan 2025PromisedAug 2030

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on30 Jan 2025
  • Promised completion31 Aug 2030
  • Revised completionNone
  • Buildings6 building records
  • Documents filed42 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Tower 25---1040104
Tower 26---1040104
Tower 27---97097
Tower 28---69069
Tower 29-30---65065
Tower 32---24024

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)-
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementYes-
Fire protection and fire safety requirementsYes-
Solid waste management and disposalYes-
Emergency Evacuation servicesYes-
Internal Roads & FootpathsYes-
Electricity supply transformer and substationNoNot applicable
Storm water drainsYes-
Use of renewable energyYes-
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseYes-
Community HallNoNot applicable
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksNoNot applicable
Power BackupNoNot applicable
Piped GasNoNot applicable
Water and SanitationNoNot applicable
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesYes-
Common entrance and exit for the building/common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffYes-
Water conservation and renewable energyYes-
Common storage spacesNoNot applicable

Land and ownership5

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area26,497 sq m
Named landowners5
LandownerVillageDistrict
M.S. Ramaiah Realty Private Limited--
M.S. Ramaiah Realty Private Limited--
M.S. Ramaiah Realty Private Limited--
M.S. Ramaiah Realty Private Limited--
M.S. Ramaiah Realty Private Limited--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Estimated costRs 522.61 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 306.70 cr-
Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC)Rs 215.91 cr-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectDILIP KUMAR P. R
EngineerB E PRUTHVIRAJA
Chartered AccountantRaghupati Hegde

Documents filed42

As listed on the registration, under the names the promoter filed them with. The files themselves are available at source: search the registration number PRM/KA/RERA/1250/303/PR/300125/007458 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
RTC, survey 12/1-
Mutation, survey 12/1-
Encumbrance Certificate, survey 12/1-
Conversion/Alienation Order, survey 12/1-
JDA, survey 12/1-
Khatha, survey 12/1-
RTC, survey 12/2-
Mutation, survey 12/2-
Encumbrance Certificate, survey 12/2-
Conversion/Alienation Order, survey 12/2-
JDA, survey 12/2-
Khatha, survey 12/2-
RTC, survey 13/1-
Mutation, survey 13/1-
Encumbrance Certificate, survey 13/1-
Conversion/Alienation Order, survey 13/1-
JDA, survey 13/1-
Khatha, survey 13/1-
RTC, survey 13/2-
Mutation, survey 13/2-
Encumbrance Certificate, survey 13/2-
Conversion/Alienation Order, survey 13/2-
JDA, survey 13/2-
Khatha, survey 13/2-
RTC, survey 14/1B-
Mutation, survey 14/1B-
Encumbrance Certificate, survey 14/1B-
Conversion/Alienation Order, survey 14/1B-
JDA, survey 14/1B-
Khatha, survey 14/1B-
Registration CertificateFile: Certificate of incorporation Birla Arnaa LLP.pdf-
GST CertificateFile: Birla Arnaa LLP Revised GST Certifcate.pdf-
Partnership DeedFile: Birla Arnaa-LLP Deed.pdf-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: Form-1 CA Certificate.pdf-
Certificate issued by Architect Form 2File: Form-2 Architect Certificate.pdf-
Certificate issued by Engineer Form 3File: Form-3 Engineer Certificate-Signed.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Non Litigation Affidavit.pdf-

Promoter's earlier projects2

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

2 under way, not due yet
ProjectLocationStatusPromisedDelivered
Birla Trimaya Phase-2Survey No. 2 and other, Akkalenahalli-Mallenahalli Village, Devanahalli TalukOngoingJun 2029Not due yet
Birla Trimaya Phase-1Survey No. 2 and other, Akkalenahalli-Mallenahalli Village, Devanahalli TalukOngoingOct 2028Not due yet

How this compares with Bengaluru Rural

20%of Bengaluru Rural projects moved their completion datethis one has not
0%of Bengaluru Rural registrations are shown as withdrawn or revokedthis one is not

Computed across the 650+ Bengaluru Rural projects on ReraGenie, from their own filings.

Keep BIRLA TRIMAYA PHASE-3 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Rural650+ in Bengaluru Rural

2 kmBIRLA TRIMAYA PHASE-3Other 14Dot size: filed unitsN

Filed coordinates, straight-line distance. 14 registered projects within 2 km.

Builder: BIRLA ARNAA LLP

BIRLA ARNAA LLP has 4 registrations on RERA Karnataka, including BIRLA TRIMAYA PHASE-2 and BIRLA TRIMAYA PHASE-4. Its filings declare 8 earlier projects, 1 of them declared completed. Read the full track record. See more projects on the Bengaluru Rural district page.

Frequently asked questions

What are my rights if BIRLA TRIMAYA PHASE-3 is delayed beyond 31 Aug 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of BIRLA TRIMAYA PHASE-3?

The registered promoter entity is BIRLA ARNAA LLP, a partnership firm as per the filing. Its LLPIN ABA-8025 and GSTIN 29AAZFB1893R1Z4 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in BIRLA TRIMAYA PHASE-3?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at BIRLA TRIMAYA PHASE-3?

The professionals named in the filing: Architect: DILIP KUMAR P. R; Engineer: B E PRUTHVIRAJA; Chartered Accountant: Raghupati Hegde. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BIRLA TRIMAYA PHASE-3?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BIRLA TRIMAYA PHASE-3. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BIRLA TRIMAYA PHASE-3 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.