BHUVANA BOULEVARD PHASE 1

By VSPR DEVELOPERS

RG-KA-16085 · RERA PRM/KA/RERA/1250/304/PR/170425/007677 · Last updated on RERA Karnataka portal: 10 Jul 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2030Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 98 documents Report an error

BHUVANA BOULEVARD PHASE 1 is a Residential/Group Housing project by VSPR DEVELOPERS in Bengaluru Rural, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1250/304/PR/170425/007677 on 17 Apr 2025. Possession is promised by 31 Dec 2030.

At a glance

Project

  • NameBHUVANA BOULEVARD PHASE 1
  • TypeResidential/Group Housing
  • Location
    • Hosakote
    • Bengaluru Rural
  • PincodeNot stated
  • RERA no.PRM/KA/RERA/1250/304/PR/170425/007677
  • ReraGenie IDRG-KA-16085

Builder

  • NameVSPR DEVELOPERS
  • Entity typePartnership Firm
  • GSTIN29AAWFV8034D1ZL
  • Authorized SignatoryM SRINIVAS
  • Other registrations1 more →

Key dates

this monthRegisteredApr 2025PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on17 Apr 2025
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings1 building record
  • Documents filed98 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BHUVANA BOULEVARD PHASE 1---28028

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 10 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)-
Wardrobe, Showcase, Kitchen cabinet, Puja work-
Elevation work-
Internal and External work including landscapes as per sanctioned drawings-

Progress on shared amenities40

As on 10 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemYes-
Water conservation/rain water harvesting/recharge of ground waterYes-
Energy managementYes-
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalYes-
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsYes-
Electricity supply transformer and substationYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes-
Parks & Tree plantingYes-
Street LightingYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceNoNot applicable
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksYes-
Power BackupYes-
Piped GasNoNot applicable
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsNoNot applicable
Corridor/LobbiesNoNot applicable
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementNoNot applicable
TerraceNoNot applicable
Outer WallYes-
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes-
Common storage spacesNoNot applicable

Land and ownership2

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Named landowners2
LandownerVillageDistrict
SAMPANGIRAMAIAH R AND OTHERS--
SAMPANGIRAMAIAH R AND OTHERS--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 30.90 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 25.27 cr-
Administrative CostsRs 5.00 cr-
On-site expenditure-Consultants FeesRs 62.95 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectY S Ytiraj
EngineerMADAMANCHI SURENDRA NADH
Chartered AccountantJayatheertha K B

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed98

As listed on the registration, under the names the promoter filed them with; the newest 80 of 98 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1250/304/PR/170425/007677 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form 4 - CA - June-26- Phase 1.pdf10 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5 Architect Certificate - Phase 1.pdf10 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer Certificate - Phase 1.pdf10 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 CA March 26 P1.pdf7 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form 5 Architect March 26 P1.pdf7 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6 Engineer March 26 P1.pdf7 Apr 2026
Q4 2025-26 Water supply and sewage board7 Apr 2026
Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres)7 Apr 2026
Q4 2025-26 KPTCL- BESCOM7 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form 4 - CA - Dec 25 - Phase 1.pdf12 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form 6 Engineer Certificate - Dec 25 - Phase 1.pdf12 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 5 Architect Certificate - Dec 25 - Phase 1.pdf12 Jan 2026
Q3 2025-26 Water supply and sewage board12 Jan 2026
Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres)12 Jan 2026
Q3 2025-26 KPTCL- BESCOM12 Jan 2026
Firm Reg CertiFile: 2 Firm Reg Certi.pdf7 Apr 2025
Designated Bank Acc StatementFile: 3 Designated Bank Acc Statement.jpeg7 Apr 2025
Bank StatementFile: 4 Bank Statement.pdf7 Apr 2025
BS with SchedulesFile: 5 BS with Schedules.pdf7 Apr 2025
Profit & LossFile: 5 Profit & Loss.pdf7 Apr 2025
Abstract Estimation P1File: 11 Abstract Estimation P1.pdf7 Apr 2025
Bescom Noc with Fee ReceiptFile: 12 Bescom Noc with Fee Receipt.pdf7 Apr 2025
Water Noc P1File: 12 Water Noc P1.pdf7 Apr 2025
STP Drawing P1File: 13 STP Drawing P1.pdf7 Apr 2025
SOF & Supporting Doc P1File: 6 SOF & Supporting Doc P1.pdf7 Apr 2025
Amenities and Common areaFile: 8 Amenities and Common area.pdf7 Apr 2025
RTC, survey 219/2-
Mutation, survey 219/2-
Encumbrance Certificate, survey 219/2-
Conversion/Alienation Order, survey 219/2-
JDA, survey 219/2-
Khatha, survey 219/2-
RTC, survey 219/3-
Mutation, survey 219/3-
Encumbrance Certificate, survey 219/3-
Conversion/Alienation Order, survey 219/3-
JDA, survey 219/3-
Khatha, survey 219/3-
Registration CertificateFile: 2 Firm Reg Certi.pdf-
GST CertificateFile: VSPR GST Registration.pdf-
Partnership DeedFile: Partnership deed.pdf-
Partner Details-
Partner Details-
Certificate issued by CA Form 1File: Form 1 CA P1.pdf-
Certificate issued by Architect Form 2File: Form 2 Architect P1.pdf-
Certificate issued by Engineer Form 3File: Form 3 P1.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: No Litigation P1.pdf-
Phase 1 Sanction Letter-
Site Plan-
Sectional Elevation-
Structural Stability PH1-
Project Specification P1-
Relinquishment Deed-
Proforma of AOS Phase 1-
Allotment Letter flat Phase 1-
Form B P1-
Section 3 1 P1-
JD Affidavit P1-
Legal Opinion-
BESCOM NOC PH1-
Water NOC Ph-1-
PCB NOC PH 1-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
GPA-
PH 1 Labor NOC-
Ph 1 Panchayat NOC-
Adhaara Bidugade Pathra-
ADLR 219 2-

How this compares with Bengaluru Rural

20%of Bengaluru Rural projects moved their completion datethis one has not
0%of Bengaluru Rural registrations are shown as withdrawn or revokedthis one is not

Computed across the 650+ Bengaluru Rural projects on ReraGenie, from their own filings.

Keep BHUVANA BOULEVARD PHASE 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Rural650+ in Bengaluru Rural

Builder: VSPR DEVELOPERS

VSPR DEVELOPERS has 2 registrations on RERA Karnataka, including BHUVANA BOULEVARD PHASE 2 and BHUVANA BOULEVARD PHASE 1. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Rural district page.

Frequently asked questions

What are my rights if BHUVANA BOULEVARD PHASE 1 is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of BHUVANA BOULEVARD PHASE 1?

The registered promoter entity is VSPR DEVELOPERS, a partnership firm as per the filing. Its GSTIN 29AAWFV8034D1ZL can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in BHUVANA BOULEVARD PHASE 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at BHUVANA BOULEVARD PHASE 1?

The professionals named in the filing: Architect: Y S Ytiraj; Engineer: MADAMANCHI SURENDRA NADH; Chartered Accountant: Jayatheertha K B. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BHUVANA BOULEVARD PHASE 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BHUVANA BOULEVARD PHASE 1. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BHUVANA BOULEVARD PHASE 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.