ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / BHOSALE PRIDE

Registration lapsed No litigation declared Residential / Group Housing project

BHOSALE PRIDE

By GANESH NATHU BHOSALE

RG-MH-24974 · RERA P52100010924 · Last updated on MahaRERA portal: 13 Aug 2024

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 15 months past the filed date
  • Completion date moved by 56 months
  • 3 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jul 2025Possession promised15 months past this date
23 of 33Construction stages doneacross 3 buildings; furthest along: Slabs of Super Structure, 80%
0Complaints at MahaRERAon this registration
Jump to the 128 documents Report an error

BHOSALE PRIDE is a Residential / Group Housing project by GANESH NATHU BHOSALE in Pune, Maharashtra, registered with MahaRERA as P52100010924 on 31 Aug 2017. Possession was promised by 29 Jul 2025 and is now 15 months past that date. The completion date has moved by 56 months from the original filing.

At a glance

Project

  • NameBHOSALE PRIDE
  • TypeResidential / Group Housing
  • Location
    • Moshi
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100010924
  • ReraGenie IDRG-MH-24974

Builder

  • NameGANESH NATHU BHOSALE
  • Entity typeIndividual

Key dates

15 months past promisethis monthRegisteredAug 2017First promiseNov 2020Revised toJul 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on31 Aug 2017
  • Promised completion29 Jul 2025
  • Revised completionRevised to 29 Jul 2025 (originally 30 Nov 2020)
  • Buildings3 building records
  • Documents filed128 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WINGNA160000
B WINGNA140000
COMMERCIAL WINGNA60000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 13 Aug 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

23 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Slabs of Super Structure, at 80%.

A WING100%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B WING56%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure80%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises40%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
COMMERCIAL WING64%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 13 Aug 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes50%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes90%
Storm Water DrainsYes90%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes50%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed151

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots151
Closed/Covered151
BuildingClosed/CoveredTotal
A WING6666
B WING6565
COMMERCIAL WING2020

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,200 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
DATTATRAY SOPAN BHOSALEPimpri Chinchawad (M Corp.)Pune
DASHRATH SOPAN BHOSALEPimpri Chinchawad (M Corp.)Pune

Approvals and building plan

Permissible FSI8044.0
Proposed, not sanctioned8,044 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchCHANDNI CHOWK, PUNE NASHIK HIGHWAY, PUNE - 411039

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPATIL & BUGADE ASSOCIATES
PartnerRole in project
GANESH NATHU BHOSALE-

Extensions applied for3

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100008650Nov 2020 → Nov 2021

Reason as filed by the promoterDue to Covid, Completion is delayed by one year.

EXT52100011965Nov 2020 → Jul 2024

Reason as filed by the promoterDUE COVID 19 AND NON AVAILABILITY OF RESOURCES.

EXT52100024475Nov 2020 → Jul 2025

Reason as filed by the promoterDue to unavailability of funds

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 5 Jul 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Aug 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 9 Aug 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Aug 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed128

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 128 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: edited_Form 1 31122021.pdf13 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: edited_Form 1 31032022.pdf13 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: edited_Form 1 31062022.pdf13 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: edited_form 1 3192022.pdf13 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: edited_Form 1 31122022.pdf13 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: edited_Form 1 31032023.pdf13 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: edited_Form 1 31062023.pdf13 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: edited_Form 1 31092023.pdf13 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: edited_Form 1 31122023.pdf13 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: edited_Form 1 31032024.pdf13 Aug 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: edited_Form 1 31062024.pdf13 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 31122021.pdf13 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 31032022.pdf13 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 31062022.pdf13 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 31092022.pdf13 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 31122022.pdf13 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 31032023.pdf13 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 31062023.pdf13 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 31092023.pdf13 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 31122023.pdf13 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 31032024.pdf13 Aug 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2 31062024.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: sold circular a wing 31062022.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: sold circular a wing 31092022.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: sold circular a wing 31122022.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: sold circular a wing 310323.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: sold circular a wing 31062023.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: sold circular a wing 31092023.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: sold circular a wing 31122023.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: sold circular a wing 31032024.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: sold circular a wing 31062024.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: Sold circular 310622.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: Sold circular 310922.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: Sold circular 311222.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: Sold circular 310323.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: Sold circular 310623.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: Sold circular 310923.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: Sold circular 311223.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: Sold circular 310324.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: Sold circular 310624.pdf13 Aug 2024
Certificates of CA (Form 3)File: Form 3 31-12-2021.pdf13 Aug 2024
Certificates of CA (Form 3)File: Q4 21-22.pdf13 Aug 2024
Certificates of CA (Form 3)File: Q1-22-23.pdf13 Aug 2024
Certificates of CA (Form 3)File: Q2-22-23.pdf13 Aug 2024
Certificates of CA (Form 3)File: Q3-22-23_11zon.pdf13 Aug 2024
Certificates of CA (Form 3)File: Q4-22-23_11zon.pdf13 Aug 2024
Certificates of CA (Form 3)File: Q1-23-24_11zon.pdf13 Aug 2024
Certificates of CA (Form 3)File: Q2-23-24.pdf13 Aug 2024
Certificates of CA (Form 3)File: Q3-23-24.pdf13 Aug 2024
Certificates of CA (Form 3)File: Q4-23-24.pdf13 Aug 2024
Certificates of CA (Form 3)File: Q1-24-25.pdf13 Aug 2024
Declaration in FORM BFile: Form B.pdf2 Aug 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM 5 PS.pdf31 Dec 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 final 20-21.pdf31 Jan 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 final signed.pdf31 Jan 2023
Layout approvalFile: scan0499.pdf9 Aug 2022
Building plan approvalFile: scan0500.pdf9 Aug 2022
Building plan approvalFile: scan0501.pdf9 Aug 2022
Building plan approvalFile: scan0502.pdf9 Aug 2022
Building plan approvalFile: scan0503.pdf9 Aug 2022
Building plan approvalFile: scan0504.pdf9 Aug 2022
Building plan approvalFile: scan0505.pdf9 Aug 2022
Building plan approvalFile: scan0506.pdf9 Aug 2022
Copy of Layout Approval (in case of layout)File: scan0499.pdf9 Aug 2022
Building Plan Approval (IOD)File: scan0500.pdf9 Aug 2022
Building Plan Approval (IOD)File: scan0501.pdf9 Aug 2022
Building Plan Approval (IOD)File: scan0502.pdf9 Aug 2022
Building Plan Approval (IOD)File: scan0503.pdf9 Aug 2022
Building Plan Approval (IOD)File: scan0504.pdf9 Aug 2022
Building Plan Approval (IOD)File: scan0505.pdf9 Aug 2022
Building Plan Approval (IOD)File: scan0506.pdf9 Aug 2022
Commencement Certificates / NA Order for plotted developmentFile: cc_compressed.pdf9 Aug 2022
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: form 1.pdf31 May 2022
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: form 2.pdf31 May 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: FROM-2A ENGINEERS CERTIFICATE.pdf31 May 2022
CERSAI detailsFile: CERSAI_Search_Report_200238552666_For_Asset_Based_Search_31_05_2022_15_37_27_500.pdf31 May 2022
Disclosure of sold/ booked inventoryFile: circular 29.pdf31 May 2022
Layout approvalFile: LAYOUT.pdf22 Jul 2021
Building plan approvalFile: a720210402_065141.pdf22 Jul 2021
Building plan approvalFile: b wing elevtion.pdf22 Jul 2021

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 56 months
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep BHOSALE PRIDE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Moshi13,700+ in Pune

2 kmBHOSALE PRIDECompleted 57Lapsed / revoked 30Other 76Dot size: filed unitsN

Filed coordinates, straight-line distance. 163 registered projects within 2 km.

Builder: GANESH NATHU BHOSALE

GANESH NATHU BHOSALE has 1 registration on MahaRERA, including BHOSALE PRIDE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that BHOSALE PRIDE shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if BHOSALE PRIDE is delayed beyond 29 Jul 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BHOSALE PRIDE?

The registered promoter entity is GANESH NATHU BHOSALE, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BHOSALE PRIDE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BHOSALE PRIDE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BHOSALE PRIDE?

The professionals named in the filing: Architect: PATIL & BUGADE ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BHOSALE PRIDE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BHOSALE PRIDE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BHOSALE PRIDE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.