Bharat Leelaa
RG-MH-27667 · RERA P52100035009 · Last updated on MahaRERA portal: 17 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 54 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Bharat Leelaa is a Others project by Bharat Leelaa Developers in Pune, Maharashtra, registered with MahaRERA as P52100035009 on 28 Apr 2022. Possession is promised by 31 Dec 2030. The completion date has moved by 54 months from the original filing. 0 of the 68 units on this registration are recorded sold or booked, and 4 of 36 construction stages are filed complete.
At a glance
Project
- NameBharat Leelaa
- TypeOthers
- Location
- Autade-Handewadi
- Haveli
- Autadwadi Handewadi
- Pune
- 412308
- Pincode412308
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100035009
- ReraGenie IDRG-MH-27667
Builder
- NameBharat Leelaa Developers
- Entity typePartnership
- PartnersAvinash Bharatlal Doshi, Sanjay Anantilal Vora
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on28 Apr 2022
- Promised completion31 Dec 2030
- Revised completionRevised to 31 Dec 2030 (originally 30 Jun 2026)
- Buildings4 building records
- Documents filed101 files
Current status
Figures as on 17 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Bharat Leelaa Wing A | NA | 5 | 5 | 0 | 35 | 35 |
| Bharat Leelaa Wing B | NA | 8 | 7 | 14 | 0 | 14 |
| Bharat Leelaa Wing C | NA | 8 | 7 | 14 | 0 | 14 |
| Bharat Leelaa Wing D | NA | 4 | 3 | 5 | 0 | 5 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building4
As on 17 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 36 construction stages are filed complete across 4 buildings. The stage furthest along is Internal walls, at 95%.
Bharat Leelaa Wing A97%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 95% |
| Sanitary Fittings within the flats / premises | 95% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 95% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 95% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 95% |
Bharat Leelaa Wing B0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Bharat Leelaa Wing C0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Bharat Leelaa Wing D0%
| Activity | Progress |
|---|---|
| Excavation | 0% |
| Basement (if any) | Not applicable |
| Podiums (if any) | Not applicable |
| Plinth | 0% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 0% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 17 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 50% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 90% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 95% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | Yes | 0% |
Parking filed145
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Bharat Leelaa Wing A | 89 | 89 |
| Bharat Leelaa Wing B | 23 | 23 |
| Bharat Leelaa Wing C | 23 | 23 |
| Bharat Leelaa Wing D | 10 | 10 |
Land and ownership4
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Swati Avinash Doshi | Pune (M Corp.) | Pune |
| Ujawala Bahubali Doshi | Pune (M Corp.) | Pune |
| Vrushali Sanjay Vora | Pune (M Corp.) | Pune |
| Sanjay Anantlal Vora | Pune (M Corp.) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Bharat Leelaa Wing A | NA | Rs 5.50 cr | Rs 4.04 cr |
| Bharat Leelaa Wing B | NA | Rs 5.00 cr | - |
| Bharat Leelaa Wing C | NA | Rs 5.00 cr | - |
| - | NA | Rs 5.00 cr | Rs 1.61 cr |
| Bharat Leelaa Wing D | NA | Rs 2.50 cr | - |
Certifying professionals and partners8
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | A Design Studio Mangesh Gotal |
| Architect | Mangesh Gotal |
| Engineer | M. P. Warudkar |
| Engineer | Makarand Warudkar |
| Chartered Accountant | CA Paresh Sabadra |
| Chartered Accountant | RSPH & Associates |
| Chartered Accountant | P N Sabadra and Associates |
| Chartered Accountant | CA Suchita Rakesh Pawar |
| Partner | Role in project |
|---|---|
| Bharat Leelaa Developers | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promotera) There is total four wings in a project viz., Wing A, Wing B, Wing C, Wing D. Wing A is completed around 95% but Wing B, Wing C and Wing D is not started yet. b) There was severe slow-down in Housing Construction Sector due to which we are in delay to achieve sale/booking target of flats in spite of our best efforts and the project is continued till date with our own funds only. we have not sold units, not accepted bookings in a project till date, hence extension of project completion date is not affecting adversely to anyone.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 8 Apr 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 24 Mar 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 9 Nov 2025 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 23 Mar 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2030
Documents filed101
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 101 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Architect Certificate 14 Jul 2026.pdf | 17 Jul 2026 |
| Withdrawal Update Form 2File: Engineers Certificate 14 Jul 2026.pdf | 17 Jul 2026 |
| Withdrawal Update Form 3File: CA Cert_Bharat Leela_ June 26..pdf | 17 Jul 2026 |
| Form 2A (FY 2025-2026)File: Form 2A - March 26 .pdf | 22 Apr 2026 |
| Withdrawal Update Form 1File: Architect Certificate 08 April 2026.pdf | 16 Apr 2026 |
| Withdrawal Update Form 2File: Engineers Certificate 10 Apr 2026.pdf | 16 Apr 2026 |
| Withdrawal Update Form 3File: CA Cert_Bharat Leela_ March 26 final 2.pdf | 16 Apr 2026 |
| Withdrawal Update Form 1File: AR - Dec 25 .pdf | 20 Jan 2026 |
| Withdrawal Update Form 2File: Engineers Certificate .pdf | 20 Jan 2026 |
| Withdrawal Update Form 3File: CA Cert_Bharat Leela_Dec 25-Final.pdf | 20 Jan 2026 |
| Form 2A (FY 2023-2024)File: Form 2A - March 24.pdf | 12 Nov 2025 |
| Form 2A (FY 2024-2025)File: Form 2A - March 25.pdf | 12 Nov 2025 |
| Building plan approvalFile: Plan.pdf | 9 Nov 2025 |
| Form 5 (FY 2024-2025)File: Bharat Leela-RERA Audit Report FY -24-25 final.pdf | 7 Nov 2025 |
| Form 2A (FY 2022-2023)File: Form 2A 2023.pdf | 5 Nov 2025 |
| Form 5 (FY 2022-2023)File: Bharat Leela-RERA Audit Report FY 22-23.pdf | 5 Nov 2025 |
| Form 5 (FY 2023-2024)File: Bharat Leela-RERA Audit Report FY -23-24.pdf | 5 Nov 2025 |
| Form 1File: Architect Certificate 10 Oct 2025.pdf | 18 Oct 2025 |
| Form 2File: Engineers Certificate 10 Oct 2025.pdf | 18 Oct 2025 |
| Form 3File: CA Cert_Bharat Leela_Sept 25 final.pdf | 18 Oct 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure - sep 25.pdf | 18 Oct 2025 |
| Form 1File: AR June 25.pdf | 26 Jul 2025 |
| Form 2File: ER June 25.pdf | 26 Jul 2025 |
| Form 3File: CA June 25final.pdf | 26 Jul 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory- Bharat Leelaa June 25(1).pdf | 26 Jul 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect’s Certificate Apr 2025.pdf | 25 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final CA Cert_Bharat Leela _March 25.pdf | 25 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate Apr 2025.pdf | 25 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate-Dec-24.pdf | 20 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final CA Certificate-Dec-24.pdf | 20 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate-Dec-24.pdf | 20 Feb 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate-Dec-24.pdf | 8 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Final CA Certificate-Dec-24.pdf | 8 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineers Certificate-Dec-24.pdf | 8 Feb 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Bharat Leela-RERA Audit Report FY -23-24.pdf | 27 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate 10 Oct 2024.pdf | 14 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Cert_Bharat Leela _Sept 24 Final Sign copy.pdf | 14 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer’s Certificate 15 Oct 2024.pdf | 14 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 AR Final Signed copy.pdf | 15 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 CA Cert -June-24 pdf signed copy.pdf | 15 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 ER Final Signed copy.pdf | 15 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory- Bharat Leelaa .PDF | 30 May 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Separate Bank Account Declaration - Bharat Leelaa.pdf | 30 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate for application in change.pdf | 25 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Engineers Quality Assurance Apr 2024.pdf | 23 May 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Engineers Certircate For Quality Assurance.pdf | 23 May 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate March 2024.pdf | 4 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer’s Certificate March 2024.pdf | 4 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate March 2024.pdf | 4 May 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate March 2024.pdf | 4 May 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer’s Certificate.pdf | 10 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - Dec23- Final.pdf | 10 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect’s Certificate Dec23-Final.pdf | 9 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate-Bharat leela-Final.pdf | 9 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect’s Certificate 15012024_compressed.pdf | 24 Jan 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure.pdf | 24 Jan 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect’s Certificate 15-09-22.pdf | 13 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect’s Certificate 15-12-22.pdf | 13 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect’s Certificate 15-03-23.pdf | 13 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect’s Certificate June 2023.pdf | 13 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect’s Certificate 15-09-23.pdf | 13 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate Sept 22.pdf | 13 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate-Dec 22.pdf | 13 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate March 23.pdf | 13 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate June 23.pdf | 13 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer certificate Sept 23.pdf | 13 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Bharat leela Sep 22.pdf | 13 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Bharat leela Dec 22.pdf | 13 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Bharat leela Mar 23.pdf | 13 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Bharat leela June 23.pdf | 13 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_Bharat leela Sep 23.pdf | 13 Dec 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Bharat Leela-RERA Audit Report FY 22-23.pdf | 6 Dec 2023 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold Booked Inventory- Bharat Leelaa.pdf | 16 May 2023 |
| Other - TechnicalFile: Engineer's Certircate For Quality Assurance.pdf | 16 May 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Bharat Leela CA certificate.pdf | 13 Aug 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT’S CERTIFICATE 15 July 2022.pdf | 20 Jul 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER’S CERTIFICATE 15 July 2022.pdf | 20 Jul 2022 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate_compressed.pdf | 18 Apr 2022 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate_Bharat Leelaa_compressed.pdf | 18 Apr 2022 |
| Copy of the legal title reportFile: Title Report.pdf | 8 Apr 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 101 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Bharat Leelaa on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Haveli13,700+ in Pune
Filed coordinates, straight-line distance. 85 registered projects within 2 km.
Ashtavinayak City Phase - 3
Ashtavinayak City Pune LLP
CELESTIA
Malpani Properties
SAMRUDDHI HEIGHTS
Shree Samruddhi Corporation
Suyog Shrushti
Suyog Developers
Ashtavinayak City Phase - 4
Ashtavinayak Reality
Everra Phase 1
Honcho Properties Private Limited
Builder: Bharat Leelaa Developers
Bharat Leelaa Developers has 1 registration on MahaRERA, including Bharat Leelaa. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Bharat Leelaa is delayed beyond 31 Dec 2030?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Bharat Leelaa?
The registered promoter entity is Bharat Leelaa Developers, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Bharat Leelaa?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Bharat Leelaa?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Bharat Leelaa?
The professionals named in the filing: Architect: A Design Studio Mangesh Gotal; Architect: Mangesh Gotal; Engineer: M. P. Warudkar; Engineer: Makarand Warudkar; Chartered Accountant: CA Paresh Sabadra; Chartered Accountant: RSPH & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Bharat Leelaa?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback