Registered No litigation declared Residential / Group Housing project

BHANDUP AMOL CHS LTD

By SUDHANSHU INFRASTRUCTURES PVT LTD

RG-MH-88459 · RERA P51800050455 · Last updated on MahaRERA portal: 21 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 5 other registrations.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
3 of 11Construction stages donefurthest along: Slabs of Super Structure, 52%
0Complaints at MahaRERAon this registration
Jump to the 105 documents Report an error

BHANDUP AMOL CHS LTD is a Residential / Group Housing project by SUDHANSHU INFRASTRUCTURES PVT LTD in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800050455 on 17 Apr 2023. Possession is promised by 31 Dec 2026.

At a glance

Project

  • NameBHANDUP AMOL CHS LTD
  • TypeResidential / Group Housing
  • Location
    • Harishchandra Dada Koparkar Marg
    • BHANDUP EAST
    • Bhandup
    • Kurla
    • Mumbai Suburban
    • 400042
  • Pincode400042
  • RERA no.P51800050455
  • ReraGenie IDRG-MH-88459

Builder

  • NameSUDHANSHU INFRASTRUCTURES PVT LTD
  • Entity typeCompany
  • CINU45400MH2008PTC177661
  • GSTIN27AALCS5135L1ZW
  • GSTIN is from this promoter's other MahaRERA registrations. This project's own filing does not repeat it.
  • Managing DirectorABHAYJEET SAKALNARAYAN DUBEY
  • DirectorPINKY ABHAYJEET DUBEY
  • Other registrations5 more →
  • Completed2 of 6
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredApr 2023PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Apr 2023
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings1 building record
  • Documents filed105 files

Current status

16.0%Work done, per cost certificate

Figures as on 21 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BHANDUP AMOL CHS LTDNA00000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 21 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Slabs of Super Structure, at 52%.

BHANDUP AMOL CHS LTD: 37% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure52%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises7%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks45%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 21 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes50%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,625 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on1 Oct 2024
LandownerVillageDistrict
BHANDUP AMOL CHSLGreater Mumbai (M Corp.) (Part) (802794)Mumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchBHANDUP W
Estimated costRs 30.83 cr
Cost incurredRs 4.92 cr
Work done15.97%
BuildingWingEstimatedIncurred
BHANDUP AMOL CHS LTDNARs 30.03 crRs 4.92 cr
-NARs 80.00 lakh-

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectR P ASUNDARIA
EngineerAMIT DUBEY
EngineerANUPAM KORHALE
EngineerSWAPNEEL CONSULTANT
Chartered AccountantS. D. Chheda & Co.
Chartered AccountantKAPURE AND KAPURE
PartnerRole in project
SUDHANSHU INFRASTRUCTURES PRIVATE LIMITED-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 6 Mar 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 5 Nov 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 5 Nov 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 5 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed105

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 105 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1 - Bhandup Amol - March 26.pdf21 May 2026
Withdrawal Update Form 2File: Form 2 - Bhandup Amol - March 26.pdf21 May 2026
Withdrawal Update Form 3File: Form 3 - Bhandup Amol - March 26.pdf21 May 2026
Form 1File: Form 1 - Bhandup Amol - Sept 25.pdf24 Apr 2026
Form 2File: Form 2 - Bhandup Amol - Sept 25.pdf24 Apr 2026
Form 3File: Form 3 - Bhandup Amol - Sept 25_compressed.pdf24 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure - Bhandup Amol - Sept 25.pdf24 Apr 2026
Form 1File: Form 1 - Bhandup Amol - Dec 25.pdf24 Apr 2026
Form 2File: Form 2 - Bhandup Amol - Dec 25.pdf24 Apr 2026
Form 3File: Form 3 - Bhandup Amol - Dec 25_compressed.pdf24 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure - Bhandup Amol - Dec 25.pdf24 Apr 2026
Form 1File: Form-1 June-25.pdf21 Apr 2026
Form 2File: Form-2 June-25.pdf21 Apr 2026
Form 3File: FORM 3 JUNE-25_compressed.pdf21 Apr 2026
Disclosure of Sold and Booked InventoryFile: Disclosure June-25.pdf21 Apr 2026
Withdrawal Update Form 1File: Form 1.pdf13 Aug 2025
Withdrawal Update Form 2File: Form-2 June-25.pdf13 Aug 2025
Withdrawal Update Form 3File: FORM 3 JUNE-25_compressed.pdf13 Aug 2025
Form 1File: Form-1 Sep-24.pdf11 Aug 2025
Form 2File: Form-2 Sep-24.pdf11 Aug 2025
Form 3File: Form -3 Sep-24-Bhandup Amol.pdf11 Aug 2025
Disclosure of Sold and Booked InventoryFile: Discolsure of Sold Sep-24.pdf11 Aug 2025
Form 1File: form-1 March-25.pdf11 Aug 2025
Form 2File: Form-2 March-25.pdf11 Aug 2025
Form 3File: FORM-3 MARCH-25.pdf11 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure-March-25.pdf11 Aug 2025
Form 1File: FROM-1 DEC-24 AMOL.pdf11 Aug 2025
Form 2File: Form-2 Dec-24.pdf11 Aug 2025
Form 3File: FORM-3 DEC-24_compressed.pdf11 Aug 2025
Disclosure of Sold and Booked InventoryFile: Disclosure Dec-24.pdf11 Aug 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form-1 Sep-24.pdf7 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form -3 Sep-24-Bhandup Amol.pdf7 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Sep-24.pdf7 Jan 2025
Disclosure of sold/ booked inventoryFile: Discolsure of Sold Sep-24.pdf7 Jan 2025
Layout approvalFile: 1_compressed.pdf5 Nov 2024
Layout approvalFile: 2_compressed.pdf5 Nov 2024
Layout approvalFile: 3_compressed.pdf5 Nov 2024
Layout approvalFile: 4_compressed.pdf5 Nov 2024
Layout approvalFile: 5_compressed.pdf5 Nov 2024
Layout approvalFile: 6_compressed.pdf5 Nov 2024
Layout approvalFile: 7_compressed.pdf5 Nov 2024
Building plan approvalFile: 1_compressed.pdf5 Nov 2024
Building plan approvalFile: 2_compressed.pdf5 Nov 2024
Building plan approvalFile: 3_compressed.pdf5 Nov 2024
Building plan approvalFile: 4_compressed.pdf5 Nov 2024
Building plan approvalFile: 5_compressed.pdf5 Nov 2024
Building plan approvalFile: 6_compressed.pdf5 Nov 2024
Building plan approvalFile: 7_compressed.pdf5 Nov 2024
Copy of Layout Approval (in case of layout)File: 2_compressed.pdf5 Nov 2024
Copy of Layout Approval (in case of layout)File: 3_compressed.pdf5 Nov 2024
Copy of Layout Approval (in case of layout)File: 4_compressed.pdf5 Nov 2024
Copy of Layout Approval (in case of layout)File: 5_compressed.pdf5 Nov 2024
Copy of Layout Approval (in case of layout)File: 6_compressed.pdf5 Nov 2024
Copy of Layout Approval (in case of layout)File: 7_compressed.pdf5 Nov 2024
Copy of Layout Approval (in case of layout)File: 1_compressed.pdf5 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 1_compressed.pdf5 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 2_compressed.pdf5 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 3_compressed.pdf5 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 4_compressed.pdf5 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 5_compressed.pdf5 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 6_compressed.pdf5 Nov 2024
Building Plan Approval / NA Order for plotted developmentFile: 7_compressed.pdf5 Nov 2024
Disclosure of sold/ booked inventoryFile: Disclosure Sold inventory- June-24 Bhandup amol.pdf17 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf17 Aug 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf29 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Bhandup Amol March-24.pdf29 Jun 2024
Disclosure of sold/ booked inventoryFile: Discolsure of sold booked inventory.pdf29 Jun 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA certificate as on March 24.pdf29 Jun 2024
Commencement Certificates / NA Order for plotted developmentFile: Bhandup Amol - CC.pdf5 Mar 2024
Declaration about Commencement CertificateFile: Declaration.pdf5 Mar 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM-1.pdf25 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf25 Jan 2024
Disclosure of sold/ booked inventoryFile: Discolsure.pdf25 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM-3.pdf25 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1-JUN-2023.pdf12 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1- SEPT-23.pdf12 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 june 23.pdf12 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 Sep23.pdf12 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclousure - Jun 2023.pdf12 Jan 2024
Disclosure of sold/ booked inventoryFile: Disclousure - Sep 2023.pdf12 Jan 2024

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
ANURAG CHS LTDPLOT NO 64 DAMALE COLONY DATAR COLONY ROAD OPP MUMBAI BANK KANJUR MARG E MUMBAI 40004231CompletedJul 2017Mar 2017

How this compares with Mumbai Suburban

33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep BHANDUP AMOL CHS LTD on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near BHANDUP EAST6,700+ in Mumbai Suburban

Builder: SUDHANSHU INFRASTRUCTURES PVT LTD

SUDHANSHU INFRASTRUCTURES PVT LTD has 6 registrations on MahaRERA, including SUDHANSHU IMPERIA and VISHNU BHASKAR CHS LTD. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if BHANDUP AMOL CHS LTD is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BHANDUP AMOL CHS LTD?

The registered promoter entity is SUDHANSHU INFRASTRUCTURES PVT LTD, a company as per the filing. Its CIN U45400MH2008PTC177661 and GSTIN 27AALCS5135L1ZW can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BHANDUP AMOL CHS LTD?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BHANDUP AMOL CHS LTD?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BHANDUP AMOL CHS LTD?

The professionals named in the filing: Architect: R P ASUNDARIA; Engineer: AMIT DUBEY; Engineer: ANUPAM KORHALE; Engineer: SWAPNEEL CONSULTANT; Chartered Accountant: S. D. Chheda & Co.; Chartered Accountant: KAPURE AND KAPURE. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BHANDUP AMOL CHS LTD?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BHANDUP AMOL CHS LTD. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BHANDUP AMOL CHS LTD to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.