  • Completion date moved by 8 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Aug 2024Possession promisedregistration recorded completed
2 of 22Construction stages doneacross 2 buildings; furthest along: Basement (if any), 75%
0Complaints at MahaRERAon this registration
Jump to the 64 documents Report an error

Bhakti Park is a Residential / Group Housing project by Pravin Haibatrao Shinde in Pune, Maharashtra, registered with MahaRERA as P52100024924 on 12 Mar 2020. The registration is recorded completed; possession was promised by 23 Aug 2024. The completion date has moved by 8 months from the original filing.

At a glance

Project

  • NameBhakti Park
  • TypeResidential / Group Housing
  • Location
    • Ambegaon BK
    • Ambegaon
    • Haveli
    • Pune
    • 411046
  • Pincode411046
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100024924
  • ReraGenie IDRG-MH-16041

Builder

  • NamePravin Haibatrao Shinde
  • Entity typeIndividual
  • Declared earlier projects1 →

Key dates

this monthRegisteredMar 2020First promiseDec 2023Revised toAug 2024Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on12 Mar 2020
  • Promised completion23 Aug 2024
  • Revised completionRevised to 23 Aug 2024 (originally 30 Dec 2023)
  • Buildings2 building records
  • Documents filed64 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing CNA50000
Wing DNA30000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 19 Jun 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Basement (if any), at 75%.

Wing C28%
ActivityProgress
Excavation100%
Basement (if any)75%
Podiums (if any)0%
Plinth75%
Stilt Floor0%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
Wing D28%
ActivityProgress
Excavation100%
Basement (if any)75%
Podiums (if any)0%
Plinth75%
Stilt Floor0%
Slabs of Super Structure50%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises10%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 19 Jun 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed20

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots20
Closed/Covered12
Open Space8
BuildingClosed/CoveredOpen SpaceTotal
Wing C9716
Wing D314

Land and ownership5

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,800 sq m
Land owned byThe promoter, with other names on the file
Named landowners5
LandownerVillageDistrict
Pravin Haibatrao ShindeAmbegaonPune
Shrikant Vasudeo DeshmukhTalekarwadi Pune
Vilas TapkirAmbegaonPune
Mangesh ShilimkarAmbegaonPune
Dagdu Ganpat ShindePune (CB)Pune

Approvals and building plan

Permissible FSI2353.07
Proposed, not sanctioned2,040 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop No 3,4,6,9,10 Business Court, Opposite Brand Factory, Mukund Nagar, Pune-411037

Certifying professionals and partners

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

PartnerRole in project
Pravin Haibatrao Shinde-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100025192Dec 2023 → Aug 2024

Reason as filed by the promoterI, Mr. Pravin Haibatrao Shinde, hereby declare the following with respect to the project Bhakti Park bearing registration number. P52100024924 registered under MahaRERA. The delay in the completion of the real estate project has been primarily caused by a delay in OC. The project is 100% completed, we received the Occupation Certificate (OC) on 23 August 2024 and we have initiated the process for the possession as well, hence we won't be required to upload consents. To provide assurance and facilitate a smooth completion process, we are closely monitoring the remaining activities, ensuring tim

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Feb 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Mar 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Mar 2020
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Feb 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 27 Mar 2025

Documents filed64

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
PAN CardFile: Document 34.pdf19 Jun 2025
Other - TechnicalFile: organized (24).pdf19 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Architect’s Certificate of Percentage of Completion of Work (Form 1) (1).pdf19 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Architect’s Certificate of Percentage of Completion of Work (Form 1) (3).pdf19 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Architect’s Certificate of Percentage of Completion of Work (Form 1) (3).pdf19 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 Architect’s Certificate of Percentage of Completion of Work (Form 1) (4).pdf19 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form no 1 (1).pdf19 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Document 93.pdf19 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Document 94.pdf19 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Document 95.pdf19 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Document 96.pdf19 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Engineer’s Certificate on Cost Incurred on Project (Form 2) (5).pdf19 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Document 97.pdf19 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Engineer’s Certificate on Cost Incurred on Project (Form 2) (3).pdf19 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Document 88.pdf14 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Document 89.pdf14 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Document 90.pdf14 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Document 91.pdf14 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Document 92.pdf14 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: ewr.pdf14 May 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: ngnhgh.pdf27 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form no 1.pdf27 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form no 1 (1).pdf27 Jan 2025
Architect’s Certificate on Completion of Project (Form 4)File: Form 4 - Bhakti Park.pdf27 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf27 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 oc date.pdf27 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 - Bhakti Park For FY 2019-20.pdf27 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 - Bhakti Park for FY 2020-21.pdf27 Jan 2025
Disclosure of sold/ booked inventoryFile: C 29.pdf27 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Form 5 - Bhakti Park for FY 2021-22.pdf27 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Bhakti Park for FY 2022-23.pdf27 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Bhakti Park for FY 2023-24.pdf27 Jan 2025
Declaration in FORM BFile: FORM B.pdf13 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Form no 2A 20019-20.pdf13 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form no 2A 2020-21.pdf13 Jan 2025
Declaration about Commencement CertificateFile: Format D.pdf13 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form no 2A 2021-22.pdf13 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form no 2A 2022-23.pdf13 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form no 2A 2022-23_2.pdf13 Jan 2025
Declaration in FORM BFile: Form B.pdf19 Dec 2024
Declaration about Commencement CertificateFile: Format D.pdf19 Dec 2024
CERSAI detailsFile: Cersai Declaration.pdf19 Dec 2024
Declaration about all RERA Designated Bank Accounts (Format A)File: Format A.pdf19 Dec 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A.pdf19 Dec 2024
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Occupancy Certificate_ Bhakti Park.pdf25 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate April.pdf27 Jul 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate July.pdf27 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: bhakti park April 23.pdf27 Jul 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: bhakti park June 23.pdf27 Jul 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory on Letterhead - Copy.pdf27 Jul 2023
Disclosure of sold/ booked inventoryFile: Sold Unsold Inventory on Letterhead.pdf27 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Signed (1)_compressed.pdf27 Jul 2023
Building plan approvalFile: C Wing Architect 5th plan.pdf4 Mar 2020
Building Plan Approval / NA Order for plotted developmentFile: C Wing Architect 5th plan.pdf4 Mar 2020
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: RERA Form 3 BhaktiPark.pdf4 Mar 2020
Layout approvalFile: Building Layout Plan.pdf2 Mar 2020
Building plan approvalFile: D Wing Building Layout.pdf2 Mar 2020
Copy of Layout Approval (in case of layout)File: Building Layout Plan.pdf2 Mar 2020
Building Plan Approval / NA Order for plotted developmentFile: D Wing Building Layout.pdf2 Mar 2020
Proforma of Allotment letterFile: Kararnama- Agreement to sale.pdf2 Mar 2020
Copy of the legal title reportFile: Legal Search Report.pdf25 Feb 2020
Details of encumbrancesFile: Encumrances.pdf25 Feb 2020
Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf25 Feb 2020
Declaration in FORM BFile: Form B Pravin Shinde.pdf25 Feb 2020

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationStatusPromisedDelivered
Bhakti Park- Wing A and BAmbegaon BK Near SaiSiddhi Chowk Taluka- Haveli Dist- PuneCompletedDec 2016Nov 2016

How this compares with Pune

26%of Pune projects moved their completion datethis one moved by 8 months
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Bhakti Park on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ambegaon13,700+ in Pune

2 kmBhakti ParkCompleted 72Lapsed / revoked 28Other 66Dot size: filed unitsN

Filed coordinates, straight-line distance. 166 registered projects within 2 km.

Builder: Pravin Haibatrao Shinde

Pravin Haibatrao Shinde has 1 registration on MahaRERA, including Bhakti Park. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Bhakti Park is delayed beyond 23 Aug 2024?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Bhakti Park?

The registered promoter entity is Pravin Haibatrao Shinde, an individual as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Bhakti Park?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Bhakti Park?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

What should I check before booking in Bhakti Park?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Bhakti Park. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Bhakti Park to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.