Completed No litigation declared Residential / Group Housing project

BHAGYA GARDEN CITY PHASE I

By BHAGYA CONSTRUCTION

RG-MH-61813 · RERA P51500045263 · Last updated on MahaRERA portal: 3 Jan 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 15 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Aurangabad registration emailed to you, free during the pilot beta.
Mar 2026Possession promisedregistration recorded completed
40 of 44Construction stages doneacross 4 buildings; furthest along: Podiums (if any), 0%
6 of 128Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 77 documents Report an error

BHAGYA GARDEN CITY PHASE I is a Residential / Group Housing project by BHAGYA CONSTRUCTION in Aurangabad, Maharashtra, registered with MahaRERA as P51500045263 on 10 May 2022. The registration is recorded completed; possession was promised by 31 Mar 2026. The completion date has moved by 15 months from the original filing. 122 of the 128 units on this registration are recorded sold or booked, and 40 of 44 construction stages are filed complete.

At a glance

Project

  • NameBHAGYA GARDEN CITY PHASE I
  • TypeResidential / Group Housing
  • Location
    • PAITHAN AURANGABAD ROAD
    • VRUNDAWAN GARDEN
    • Paithan (M Cl)
    • Paithan
    • Aurangabad
    • 431107
  • Pincode431107
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51500045263
  • ReraGenie IDRG-MH-61813

Builder

  • NameBHAGYA CONSTRUCTION
  • Entity typeOthers
  • GSTIN27AHHPB5091L2Z4
  • ProperitorSHIVNATH KESHAVRAO BHAGYAWANT bhagyawant
  • Other registrations1 more →
  • Completed1 of 2

Key dates

this monthRegisteredMay 2022First promiseDec 2024Revised toMar 2026Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on10 May 2022
  • Promised completion31 Mar 2026
  • Revised completionRevised to 31 Mar 2026 (originally 31 Dec 2024)
  • Buildings4 building records
  • Documents filed77 files

Current status

95%122 of 128 units booked
100.0%Work done, per cost certificate

Figures as on 3 Jan 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BUILDING NO 09NA4432032
BUILDING NO 10NA4432032
BUILDING NO 11NA4432032
BUILDING NO 12NA4432032

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building4

As on 3 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

40 of 44 construction stages are filed complete across 4 buildings. The stage furthest along is Podiums (if any), at 0%.

BUILDING NO 0991%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING NO 1091%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING NO 1191%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
BUILDING NO 1291%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 3 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes50%
Water SupplyYes40%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes40%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingYes20%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes40%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes20%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,107 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on3 Jan 2026
LandownerVillageDistrict
MANOJ SHANKAR SANAPPaithan (M Cl)Aurangabad
GANESH SHANKAR SANAPPaithan (M Cl)Aurangabad

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI8253.24
Proposed, not sanctioned5,146 sq m
Buildings approved4
Buildings sanctioned4

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPAITHAN AURANGABAD
Estimated costRs 7.02 cr
Cost incurredRs 7.02 cr
Work done100.0%
BuildingWingEstimatedIncurred
BUILDING NO 09NARs 6.69 crRs 6.69 cr
-NARs 33.45 lakhRs 33.45 lakh

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKASTURI ARCHITECTURAL CONSULTANTS
ArchitectADITI BHAGYAWANT
EngineerM KHALIK M GAFFAR SHAIKH
Chartered AccountantV R Patni and Associates
PartnerRole in project
BHAGYA CONSTRUCTION-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT51500026035Dec 2024 → Mar 2026

Reason as filed by the promoterOur land is situated near Jayakwadi DAM and there was heavy rainfall in Nasik area and in paithan area because of which the Paithan Dam (Jayakwadi) Was overflow. Due which the required material is delayed. Force Measure issue. Still we are on the path to complete the work ASAP and also applying the completion. Now we required 12 months extension for completing the site development which is pending due to heavy rainfall.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Apr 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 25 Apr 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 25 Apr 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 25 Jun 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed77

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Form 1File: Architects Certificate.pdf3 Jan 2026
Form 2File: Form 2 Sep 2025.pdf3 Jan 2026
Form 3File: Form 3 Declaration.pdf3 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf3 Jan 2026
Form 1File: Architect Certificate dec 2025.pdf3 Jan 2026
Form 2File: Form 2 Dec 2025.pdf3 Jan 2026
Form 3File: Form 3 Declaration Dec 2025.pdf3 Jan 2026
Disclosure of Sold and Booked InventoryFile: Sold Unsold Inventory.pdf3 Jan 2026
Withdrawal Update Form 1File: Architects Certificate.pdf3 Jan 2026
Withdrawal Update Form 2File: Form 2 June 2025.pdf3 Jan 2026
Withdrawal Update Form 3File: form 3 with declaration.pdf3 Jan 2026
Declaration in FORM BFile: Form B.pdf21 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf21 Jun 2025
Disclosure of sold/ booked inventoryFile: Bhagya Garden City Phase-1 Sold March 25.pdf21 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 March 2025_compressed.pdf10 Jun 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 Declaration.pdf10 Jun 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 March 2025_compressed.pdf10 Jun 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold March 2025.pdf10 Jun 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Bhagya Phase I Dec 2024.pdf24 Feb 2025
Declaration about Commencement CertificateFile: Format D.pdf24 Feb 2025
Declaration in FORM BFile: Form-B Bhagya Construction.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Bhagya Construction Phase-2 Form-3 CA_11zon.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Bhagya Construction Phase-1 Form-3 CA_11zon.pdf20 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 9 Form-3 Sep 24.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 10 Form-3 Dec 24.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 8 Form-3 Mar 24.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 7 Form-3 Dec 23.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6 Form-3 Sep 23.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5 Form-3 Jun 23.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 Form-3 Mar 23.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form-3 Dec 22.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 Form-3 Sep 22.pdf19 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 1 Form-3 Jun 22.pdf19 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Bhagya Construction Form-5 22-23.pdf19 Feb 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Bhagya Construction Form-5 Phase-1.pdf19 Feb 2025
Declaration in FORM BFile: Bhagya Construction form-B (1).pdf3 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Phase-I Form-1 15-04-24.pdf3 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Phase- I Form-1 14-07-24.pdf3 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Phase- I Form-1 20-10-24.pdf3 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Phase- I Form-1 01-01-25.pdf3 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Phase- I Form-2 14-04-24.pdf3 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Phase- I Form-2 15-07-24.pdf3 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Phase-I Form-2 20-10-24.pdf3 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Phase-I Form-2 01-01-25.pdf3 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A 22-23bhagya .pdf3 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A Bhagya 23-24.pdf3 Jan 2025
Commencement Certificates / NA Order for plotted developmentFile: FURTHER C CERTIFICATE 24042024.pdf25 Jun 2024
Disclosure of sold/ booked inventoryFile: Sold unsold.pdf16 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Phase-1 06-Jul-2022.pdf9 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Phase-1 14-Oct-2022.pdf9 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Phase-1 09-Jan-2023.pdf9 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Phase-1 12-Apr-2023.pdf9 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Phase-1 11-Jul-2023.pdf9 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Phase-1 16-Oct-2023.pdf9 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form-2 Phase-1 12-Jan-2024.pdf9 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PHASE I JUNE 2022.pdf8 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PHASE I SEP 2022.pdf8 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PHASE I DEC 2022.pdf8 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PHASE I MARCH 2023.pdf8 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PHASE I JUNE 2023.pdf8 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PHASE I SEP 2023.pdf8 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: PHASE I DEC 2023.pdf8 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BHAGYA.pdf27 Apr 2022
Layout approvalFile: 1.pdf25 Apr 2022
Building plan approvalFile: BUILDING1.pdf25 Apr 2022
PAN CardFile: PAN.pdf25 Apr 2022
Copy of the legal title reportFile: SEARCH REPORT_compressed.pdf25 Apr 2022
Details of encumbrancesFile: NO ENC.pdf25 Apr 2022
Copy of Layout Approval (in case of layout)File: 1.pdf25 Apr 2022
Building Plan Approval / NA Order for plotted developmentFile: BUILDING1.pdf25 Apr 2022
Commencement Certificates / NA Order for plotted developmentFile: Paithan CC.pdf25 Apr 2022
Commencement Certificates / NA Order for plotted developmentFile: IOA.pdf25 Apr 2022
Declaration about Commencement CertificateFile: FORMAT D.pdf25 Apr 2022
Declaration in FORM BFile: FORM B BHAGYA.pdf25 Apr 2022
CERSAI detailsFile: CERSAI_Search_Report_200235801280_For_Asset_Based_Search_25_04_2022_15_49_23_552.pdf25 Apr 2022
Proforma of Allotment letterFile: Proforma of Allotment Letter.pdf25 Apr 2022
Proforma of Allotment letterFile: Proforma of the allotment letter and agreement for sale.pdf25 Apr 2022

How this compares with Aurangabad

95%of this project is bookeddistrict median 6%
14%of Aurangabad projects moved their completion datethis one moved by 15 months
32%of Aurangabad registrations have lapsed or been cancelledthis one is completed

Computed across the 1,400+ Aurangabad projects on ReraGenie, from their own filings.

Keep BHAGYA GARDEN CITY PHASE I on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near VRUNDAWAN GARDEN1,400+ in Aurangabad

2 kmBHAGYA GARDEN CITY PHASELapsed / revoked 2Other 3Dot size: filed unitsN

Filed coordinates, straight-line distance. 5 registered projects within 2 km.

Builder: BHAGYA CONSTRUCTION

BHAGYA CONSTRUCTION has 2 registrations on MahaRERA, including BHAGYA GARDEN CITY PHASE I and BHAGYA GARDEN CITY PHASE II. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Aurangabad district page.

Frequently asked questions

What are my rights if BHAGYA GARDEN CITY PHASE I is delayed beyond 31 Mar 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BHAGYA GARDEN CITY PHASE I?

The registered promoter entity is BHAGYA CONSTRUCTION, an others as per the filing. Its GSTIN 27AHHPB5091L2Z4 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BHAGYA GARDEN CITY PHASE I?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BHAGYA GARDEN CITY PHASE I?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BHAGYA GARDEN CITY PHASE I?

The professionals named in the filing: Architect: KASTURI ARCHITECTURAL CONSULTANTS; Architect: ADITI BHAGYAWANT; Engineer: M KHALIK M GAFFAR SHAIKH; Chartered Accountant: V R Patni and Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BHAGYA GARDEN CITY PHASE I?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BHAGYA GARDEN CITY PHASE I. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BHAGYA GARDEN CITY PHASE I to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.