ReraGenieLog inGet a buyer report

Home / Browse projects / Thane, Maharashtra / Belvedere H

Completed No litigation declared Residential / Group Housing project

Belvedere H

By LODHA DEVELOPERS LIMITED

RG-MH-06247 · RERA P51700052333 · Last updated on MahaRERA portal: 15 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 178 other registrations.

See what the report covers Free either way: or have every new Thane registration emailed to you, free during the pilot beta.
May 2027Possession promisedregistration recorded completed
3 of 11Construction stages donefurthest along: Staircases, 95%
15 of 141Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 76 documents Report an error

Belvedere H is a Residential / Group Housing project by LODHA DEVELOPERS LIMITED in Thane, Maharashtra, registered with MahaRERA as P51700052333 on 14 Aug 2023. The registration is recorded completed; possession was promised by 31 May 2027. 126 of the 141 units on this registration are recorded sold or booked, and 3 of 11 construction stages are filed complete.

At a glance

Project

  • NameBelvedere H
  • TypeResidential / Group Housing
  • Location
    • Hedutane
    • Kalyan
    • Thane
    • 421203
  • Pincode421203
  • RERA no.P51700052333
  • ReraGenie IDRG-MH-06247

Builder

  • NameLODHA DEVELOPERS LIMITED
  • Entity typeCompany
  • CINL45200MH1995PLC093041
  • GSTIN27AAACL1490J1ZG
  • MdAbhishek Mangalprabhat Lodha
  • Other registrations178 more →
  • Completed16 of 179
  • No longer live3 lapsed, de-registered or revoked
  • Past their filed date3
  • Declared earlier projects22 →

Key dates

this monthRegisteredAug 2023PromisedMay 2027Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on14 Aug 2023
  • Promised completion31 May 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed76 files

Current status

89%126 of 141 units booked
100.0%Work done, per cost certificate

Figures as on 15 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Wing H Sector O Cluster 15 Point 01NA24241410141

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 15 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 11 construction stages are filed complete. The stage furthest along is Staircases, at 95%.

Wing H Sector O Cluster 15 Point 01: 52% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises25%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks95%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.65%

Progress on shared amenities15

As on 15 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes20%
Water SupplyYes15%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes10%
Storm Water DrainsYes10%
Landscaping & Tree PlantingYes10%
Street LightingYes10%
Community BuildingsYes10%
Treatment And Disposal Of Sewage And Sullage WaterYes10%
Solid Waste Management And DisposalYes10%
Water conservation /Rain water harvestingYes10%
Energy managemcntYes10%
Fire protection and fire safety requirementsYes10%
Electrical meter room, sub-station, receiving stationYes10%
Aggregate area of recreational Open SpaceYes10%
Open ParkingYes10%

Parking filed201

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots201
Closed/Covered201

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area2,369 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on15 Sep 2025

Approvals and building plan

Sanctioning authorityThane Municipal Corporation
Permissible FSI13034.24
Proposed, not sanctioned13,034 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchNehru Centre
Estimated costRs 51.20 cr
Cost incurredRs 51.19 cr
Work done99.99%
BuildingWingEstimatedIncurred
Wing H Sector O Cluster 15 Point 01NARs 33.28 crRs 33.28 cr
-NARs 17.92 crRs 17.92 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectVilas Desai & Associate
ArchitectPradeep Kamble
EngineerK C Shah Consultants
EngineerDadaso Gavali
Chartered AccountantChirag Sarvaiya & Co
Chartered AccountantM S K A & Associates
PartnerRole in project
LODHA DEVELOPERS LIMITED-

Litigation declared1

CaseCourtStatus
28/2021Civil Court Junior Division KalyanFor argument on amendment application

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 3 Jul 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 1 Apr 2026
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Apr 2026
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 3 Jul 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed76

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Occupational CertificateFile: Full OC Belvedere H.pdf15 May 2026
Withdrawal Update Form 1File: Form1 - Belvedere H - P51700052333.pdf20 Apr 2026
Withdrawal Update Form 2File: Belvedere H Mar 2026 - Form 02 Signed.pdf20 Apr 2026
Withdrawal Update Form 3File: Belvedere H Form 03 Signed Dec 25.pdf20 Apr 2026
Layout approvalFile: 2026 03 25 - Palava 2 - Sector -D I2 O (O C Plan) (Sheet No -28) - Compress.pdf1 Apr 2026
Building plan approvalFile: 2026 03 25 - Palava 2 - Sector -D I2 O (O C Plan) (Sheet No -29) - Compress.pdf1 Apr 2026
Building plan approvalFile: 2026 03 25 - Palava 2 - Sector -D I2 O (O C Plan) (Sheet No -30) - Compress.pdf1 Apr 2026
Building plan approvalFile: 2026 03 25 - Palava 2 - Sector -D I2 O (O C Plan) (Sheet No -31) - Compress.pdf1 Apr 2026
Withdrawal Update Form 1File: Form-1 Belvedere H- Dec-25.pdf27 Jan 2026
Withdrawal Update Form 2File: Belvedere H Form 02 Signed Dec 25.pdf27 Jan 2026
Withdrawal Update Form 3File: Belvedere H Form 03 Signed Dec 25.pdf27 Jan 2026
Layout approvalFile: Belvedere - Cluster 1501 Wing H - converted.pdf25 Nov 2025
Layout approvalFile: Belvedere - Cluster 1501 Wing H - converted.pdf23 Nov 2025
Withdrawal Update Form 1File: Belvedere H.pdf31 Oct 2025
Withdrawal Update Form 2File: Form 2 - Belvedere H Sep 2025.pdf31 Oct 2025
Withdrawal Update Form 3File: Form 03 - Belvedere H - Sep 25 signed.pdf31 Oct 2025
Form 5 (FY 2024-2025)File: Belvedere H.pdf14 Oct 2025
Form 2A (FY 2024-2025)File: Belvedere H - P51700052333 - Form 2A.pdf25 Jul 2025
Form 1File: Belvedere H - Form1 - June 25 - P51700052333-ok.pdf18 Jul 2025
Form 2File: Form 2 - Belvedere H - June-25.pdf18 Jul 2025
Form 3File: Form 3_ Belvedere H - June-25.pdf18 Jul 2025
Disclosure of Sold and Booked InventoryFile: Belvedere H - Sold Unsold - june-25.pdf18 Jul 2025
Self-declaration of Quarterly ProgressFile: Updated CC.pdf18 Jul 2025
OthersFile: Layout -Belvedere - Cluster 15 01 Wing H.pdf18 Jul 2025
Form 1File: Form 1-Belvedere H- March 25.pdf17 Jun 2025
Form 2File: Signed Form 2 Belvedere H March 2025.pdf17 Jun 2025
Form 3File: Signed Form 3 Belvedere H March 2025.pdf17 Jun 2025
Disclosure of Sold and Booked InventoryFile: Signed Sold Unsold Belvedere H March 2025.pdf17 Jun 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Belvedere H.pdf2 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 Belvedere H Dec 2024.pdf25 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Signed Form 2 Belvedere H Dec 2024.pdf25 Feb 2025
Disclosure of sold/ booked inventoryFile: Sold Unsold Belvedere H Dec 2024.pdf30 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Belvedere H.pdf24 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Signed Form 3 Belvedere H Sep 2024.pdf3 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Signed Form 2 Belvedere H Sep 2024.pdf3 Jan 2025
Disclosure of sold/ booked inventoryFile: Signed Sold Unsold Belvedere H Sep 2024.pdf30 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Belvedere H.pdf4 Nov 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: P51700052333 - Belvedere H.pdf19 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Belvedere H - P51700052333 - June24.pdf10 Aug 2024
Disclosure of sold/ booked inventoryFile: Belvedere H - P51700052333 - June24.pdf8 Aug 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold - Belvedere H - P51700052333 - March 24.pdf28 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 - Belvedere H - Dec23.pdf16 May 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3 - Belvedere H - July23 - Done.pdf15 May 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - Belvedere H - P51700052333 - March 24.pdf7 May 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form2 - Belvedere H - P51700052333 - Dec23.pdf8 Apr 2024
Disclosure of sold/ booked inventoryFile: Sold Unsold - Belvedere H - P51700052333 - Dec23.pdf27 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form1 - Belvedere H - P51700052333 - Dec23.pdf26 Feb 2024
Disclosure of sold/ booked inventoryFile: Belvedere H - P51700052333 - Sep23.pdf21 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Belvedere H - Form1 - Sep23.pdf21 Nov 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Bank Declaration.pdf6 Jul 2023
Building plan approvalFile: Sheet-M37.pdf3 Jul 2023
Building plan approvalFile: Sheet-M38.pdf3 Jul 2023
Building plan approvalFile: Sheet-M39.pdf3 Jul 2023
Layout approvalFile: Layout.pdf3 Jul 2023
Copy of the legal title reportFile: Title Report.pdf3 Jul 2023
Details of encumbrances concerned to FinanceFile: Finance Enc.pdf3 Jul 2023
Details of encumbrances concerned to FinanceFile: legal Litigation.pdf3 Jul 2023
Details of encumbrances concerned to LegalFile: Finance Enc.pdf3 Jul 2023
Details of encumbrances concerned to LegalFile: legal Litigation.pdf3 Jul 2023
Copy of Layout Approval (in case of layout)File: Layout.pdf3 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: Sheet-M37.pdf3 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: Sheet-M38.pdf3 Jul 2023
Building Plan Approval / NA Order for plotted developmentFile: Sheet-M39.pdf3 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: Amended CC.pdf3 Jul 2023
Declaration about Commencement CertificateFile: CC Declara.pdf3 Jul 2023
Declaration in FORM BFile: Form B.pdf3 Jul 2023
CERSAI detailsFile: CERSAI.pdf3 Jul 2023
CERSAI detailsFile: Cersai Declaration.pdf3 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf3 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 1 Disclosure of Interest in Other Real Estate Organizations (3).pdf3 Jul 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 2 Disclosure of Interest in Other Real Estate Organizations (2).pdf3 Jul 2023
Proforma of Allotment letterFile: 1 Proforma of Allotment letter (5).pdf3 Jul 2023
Proforma of Agreement for saleFile: 1 Proforma of Agreement for sale (7).pdf3 Jul 2023
Deviation Report with respect to Allotment letterFile: 1 Deviation Report with respect to Allotment letter (4)_compressed.pdf3 Jul 2023
Deviation Report with respect to model copy of AgreementFile: ilovepdf_merged (3)_compressed.pdf3 Jul 2023
PAN CardFile: Macrotech Developers Ltd PAN CARD.pdf30 Jun 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsRegisteredStatusPromisedDelivered
LODHA PARKP51900001339.2,210Jul 2017CompletedDec 2023Registered original: Dec 2021Feb 2022

How this compares with Thane

89%of this project is bookeddistrict median 26%
24%of Thane projects moved their completion datethis one has not
23%of Thane registrations have lapsed or been cancelledthis one is completed

Computed across the 7,600+ Thane projects on ReraGenie, from their own filings.

Free monthly report: Thane on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Belvedere H on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Hedutane7,600+ in Thane

Builder: LODHA DEVELOPERS LIMITED

LODHA DEVELOPERS LIMITED has 179 registrations on MahaRERA, including Lodha Adrina and Mhatre Compound. Its filings disclose 22 earlier MahaRERA projects: declares 9 of 10 past projects completed on time. Litigation is declared on 39 of its registrations. Read the full track record. See more projects on the Thane district page.

Frequently asked questions

What are my rights if Belvedere H is delayed beyond 31 May 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Belvedere H?

The registered promoter entity is LODHA DEVELOPERS LIMITED, a company as per the filing. Its CIN L45200MH1995PLC093041 and GSTIN 27AAACL1490J1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Belvedere H?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Belvedere H?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Belvedere H?

The professionals named in the filing: Architect: Vilas Desai & Associate; Architect: Pradeep Kamble; Engineer: K C Shah Consultants; Engineer: Dadaso Gavali; Chartered Accountant: Chirag Sarvaiya & Co; Chartered Accountant: M S K A & Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Belvedere H?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Belvedere H. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Belvedere H to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.