Registered No litigation declared Residential / Group Housing project

BEAUMONTE TOWER C SALE BNDG NO 10 -WING C

By SAHANA-SHETH

RG-MH-05314 · RERA P51900050715 · Last updated on MahaRERA portal: 1 Sep 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations and every project registered within 2 km.

See what the report covers Free either way: .
Dec 2027Possession promisedno revision filed
0 of 11Construction stages donefurthest along: Excavation, 80%
184 of 247Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 114 documents Report an error

BEAUMONTE TOWER C SALE BNDG NO 10 -WING C is a Residential / Group Housing project by SAHANA-SHETH in SION CIRCLE, 400022, registered with MahaRERA as P51900050715 on 28 Apr 2023. Possession is promised by 31 Dec 2027. 63 of the 247 units on this registration are recorded sold or booked, and 0 of 11 construction stages are filed complete.

At a glance

Project

  • NameBEAUMONTE TOWER C SALE BNDG NO 10 -WING C
  • TypeResidential / Group Housing
  • Location
    • 18 M WIDE ROAD
    • SION CIRCLE
    • 400022
  • Pincode400022
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51900050715
  • ReraGenie IDRG-MH-05314

Builder

  • NameSAHANA-SHETH
  • Entity typeOthers
  • Named personsSHETH BUILDWELL PRIVATE LIMITED, PILOT CONSTRUCTIONS PRIVATE LIMITED
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredApr 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on28 Apr 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed114 files

Current status

26%63 of 247 units booked
26.1%Work done, per cost certificate

Figures as on 1 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BEAUMONTE TOWER C SALE BLDG 10 -WING CNA434323116247

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 1 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

0 of 11 construction stages are filed complete. The stage furthest along is Excavation, at 80%.

BEAUMONTE TOWER C SALE BLDG 10 -WING C: 8% average across the applicable activities

ActivityProgress
Excavation80%
Basement (if any)5%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 1 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingNoNot applicable

Parking filed407

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots407
Closed/Covered407

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,055 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on7 May 2026

Approvals and building plan

Sanctioning authorityslum rehabilation authority
Permissible FSI29052.47
Proposed, not sanctioned28,887 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchJehangir Building M G Road FORT 400001
Estimated costRs 305.21 cr
Cost incurredRs 79.70 cr
Work done26.11%
BuildingWingEstimatedIncurred
BEAUMONTE TOWER C SALE BLDG 10 -WING CNARs 274.68 crRs 77.87 cr
-NARs 30.52 crRs 1.83 cr

Certifying professionals and partners4

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectARUN GURAV
EngineerHARDIK TANK
Chartered AccountantPawankumar Ramprasad Runtga
Chartered AccountantM.B AGARWAL & CO
PartnerRole in project
SAHANA-SHETH-

Litigation declared5

CaseCourtStatus
963/2012HIGH COURTPENDING
1023/2015CITY CIVIL COURTPENDING
2106/2012CITY CIVIL COURTPENDING
7183/2017HIGH COURTPENDING
27392/2015HIGH COURTPENDING

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 20 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 20 Apr 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Apr 2023
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Aug 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2027

Documents filed114

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 114 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1.pdf1 Sep 2026
Withdrawal Update Form 2File: EC-Letter 31032026.pdf1 Sep 2026
Withdrawal Update Form 3File: form 3.pdf1 Sep 2026
Withdrawal Update Form 1File: Buildwell AOP Q4 FY25 26 pdf Signed.pdf26 Aug 2026
Withdrawal Update Form 1File: Buildwell AOP Q4 FY25 26 pdf Signed.pdf26 Aug 2026
Withdrawal Update Form 1File: FORM 1 (1).pdf26 Aug 2026
Withdrawal Update Form 2File: Form02_ Engineering Certificate _Sep 2023.pdf26 Aug 2026
Withdrawal Update Form 2File: EC-Letter 31032026.pdf26 Aug 2026
Withdrawal Update Form 2File: EC-Letter dt 30062026.pdf26 Aug 2026
Withdrawal Update Form 3File: Buildwell AOP Q4 FY25 26 pdf Signed.pdf26 Aug 2026
Withdrawal Update Form 3File: Buildwell AOP Q4 FY25 26 pdf Signed.pdf26 Aug 2026
Withdrawal Update Form 3File: Buildwell AOP Q1 FY26 27 pdfSIgned.pdf26 Aug 2026
Form 1File: FROM-01 JUNE 2025.pdf1 Apr 2026
Form 2File: FROM-02 JUNE 2025.pdf1 Apr 2026
Form 3File: FROM-03 JUNE 2025.pdf1 Apr 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSLOD JUNE 2025.pdf1 Apr 2026
Form 3File: FROM 03 SEPT 2025.pdf1 Apr 2026
Form 2File: FROM-02 SEP 2025.pdf1 Apr 2026
Form 1File: FROM-01 SEP 2025.pdf1 Apr 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSLOD SEP 2025.pdf1 Apr 2026
Disclosure of Sold and Booked InventoryFile: SOLD UNSLOD DEC 2025.pdf1 Apr 2026
Form 1File: FROM-01 DEC 2025.pdf1 Apr 2026
Form 2File: FORM 02 DEC 2025 (1).pdf1 Apr 2026
Form 3File: FROM 03 DEC 2025.pdf1 Apr 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sion Wing C Area Certificate_30 Sept 2023.pdf30 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form02_ Engineering Certificate _Sep 2023.pdf30 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 17 Beaumonte Tower-C - As on Sep-23.pdf30 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM1 _BEAUMONTE _TOWER C JUNE 2023.pdf18 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 _BEAUMONTE _TOWER C JUNE 2023.pdf18 Sep 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM3 _BEAUMONTE _TOWER C JUNE 2023.pdf18 Sep 2023
Commencement Certificates / NA Order for plotted developmentFile: Re-endorsed 17-Apr-2023.pdf31 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Sion Wing C Area Certificate_30July 2023.pdf19 Aug 2023
Proforma of Agreement for saleFile: Agreement for sale tower C.pdf19 May 2023
Proforma of Allotment letterFile: Allotment Letter tower C.pdf19 May 2023
Deviation Report with respect to Allotment letterFile: Deviation Report - Allottment Letter.pdf19 May 2023
Deviation Report with respect to model copy of AgreementFile: Deviation Report - AFS.pdf19 May 2023
CERSAI detailsFile: CERSAI_Search_Report_200266645051_For_Asset_Based_Search_20_04_2023_18_14_29_459.pdf21 Apr 2023
CERSAI detailsFile: CERSAI_Search_Report_200266644800_For_Asset_Based_Search.pdf21 Apr 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Beaumonte Form-3 Tower-C 19 04 2023.pdf21 Apr 2023
Other - FinanceFile: Declaration letter for CERSAI.pdf21 Apr 2023
Layout approvalFile: IOA Letter.pdf20 Apr 2023
Layout approvalFile: IOA Letter.pdf20 Apr 2023
Building plan approvalFile: Sheet 03 2nd Basement Floor Plan.pdf20 Apr 2023
Layout approvalFile: LAYOUT SHEET.pdf20 Apr 2023
Building plan approvalFile: Sheet 03 2nd Basement Floor Plan.pdf20 Apr 2023
Building plan approvalFile: Sheet 04 1st Basement Floor Plan.pdf20 Apr 2023
Building plan approvalFile: Sheet 05 Lower Ground Floor Plan.pdf20 Apr 2023
Building plan approvalFile: Sheet 06 Upper Ground Floor Plan.pdf20 Apr 2023
Building plan approvalFile: Sheet 07 1st Podium Floor Plan.pdf20 Apr 2023
Building plan approvalFile: Sheet 08 2nd Podium Floor Plan.pdf20 Apr 2023
Building plan approvalFile: Sheet 09 3rd Podium Floor Plan.pdf20 Apr 2023
Building plan approvalFile: sheet 11 - 5th Podium Floor Plan.pdf20 Apr 2023
Building plan approvalFile: sheet 12 - 6th Podium Floor Plan.pdf20 Apr 2023
Building plan approvalFile: sheet 12 - 6th Podium Floor Plan.pdf20 Apr 2023
Building plan approvalFile: sheet 13 - 7th resi floor interconnected to E-deck floor.pdf20 Apr 2023
Building plan approvalFile: sheet 14 - club house floor plan.pdf20 Apr 2023
Building plan approvalFile: sheet 15 - upper ground floor.pdf20 Apr 2023
Building plan approvalFile: sheet 16 - floor plan.pdf20 Apr 2023
Building plan approvalFile: sheet 17 - floor plan.pdf20 Apr 2023
Building plan approvalFile: sheet 18 - floor plan.pdf20 Apr 2023
Building plan approvalFile: sheet 19 - floor plan.pdf20 Apr 2023
Building plan approvalFile: sheet 20 - floor plan.pdf20 Apr 2023
Building plan approvalFile: sheet 21- floor plan.pdf20 Apr 2023
Building plan approvalFile: sheet 22 - floor plan.pdf20 Apr 2023
Building plan approvalFile: sheet 23 - floor plan.pdf20 Apr 2023
Building plan approvalFile: sheet 24 - floor plan.pdf20 Apr 2023
Building plan approvalFile: sheet 25 - bldg section.pdf20 Apr 2023
Copy of the legal title reportFile: Title Report Rera Format Updated 28 04 2023.pdf20 Apr 2023
Copy of Layout Approval (in case of layout)File: IOA Letter.pdf20 Apr 2023
Copy of Layout Approval (in case of layout)File: IOA Letter.pdf20 Apr 2023
Copy of Layout Approval (in case of layout)File: LAYOUT SHEET.pdf20 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Sheet 03 2nd Basement Floor Plan.pdf20 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Sheet 03 2nd Basement Floor Plan.pdf20 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Sheet 04 1st Basement Floor Plan.pdf20 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Sheet 05 Lower Ground Floor Plan.pdf20 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Sheet 06 Upper Ground Floor Plan.pdf20 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Sheet 07 1st Podium Floor Plan.pdf20 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Sheet 08 2nd Podium Floor Plan.pdf20 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: Sheet 09 3rd Podium Floor Plan.pdf20 Apr 2023
Building Plan Approval / NA Order for plotted developmentFile: sheet 11 - 5th Podium Floor Plan.pdf20 Apr 2023

Keep BEAUMONTE TOWER C SALE BNDG NO 10 -WING C on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near SION CIRCLE

2 kmBEAUMONTE TOWER C SALE BCompleted 22Lapsed / revoked 9Other 33Dot size: filed unitsN

Filed coordinates, straight-line distance. 64 registered projects within 2 km.

Builder: SAHANA-SHETH

SAHANA-SHETH has 3 registrations on MahaRERA, including BEAUMONTE TOWER A and BEAUMONTE TOWER B PHASE 1 SALE BUILDING NO 10. Its filings disclose no earlier MahaRERA projects. Read the full track record.

Frequently asked questions

What are my rights if BEAUMONTE TOWER C SALE BNDG NO 10 -WING C is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BEAUMONTE TOWER C SALE BNDG NO 10 -WING C?

The registered promoter entity is SAHANA-SHETH, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BEAUMONTE TOWER C SALE BNDG NO 10 -WING C?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BEAUMONTE TOWER C SALE BNDG NO 10 -WING C?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BEAUMONTE TOWER C SALE BNDG NO 10 -WING C?

The professionals named in the filing: Architect: ARUN GURAV; Engineer: HARDIK TANK; Chartered Accountant: Pawankumar Ramprasad Runtga; Chartered Accountant: M.B AGARWAL & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BEAUMONTE TOWER C SALE BNDG NO 10 -WING C?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BEAUMONTE TOWER C SALE BNDG NO 10 -WING C. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BEAUMONTE TOWER C SALE BNDG NO 10 -WING C to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.