ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / Basil Shreeji Residential

Registered No litigation declared Residential / Group Housing project

Basil Shreeji Residential

By GSV CONSTRUCTIONS

RG-MH-22364 · RERA P52100030918 · Last updated on MahaRERA portal: 3 Sep 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 23 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Nov 2026Possession promisedmoved 23 months from the original
19 of 22Construction stages doneacross 2 buildings; furthest along: Staircases, 99%
0 of 107Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 140 documents Report an error

Basil Shreeji Residential is a Residential / Group Housing project by GSV CONSTRUCTIONS in Pune, Maharashtra, registered with MahaRERA as P52100030918 on 29 Sep 2021. Possession is promised by 30 Nov 2026. The completion date has moved by 23 months from the original filing. 107 of the 107 units on this registration are recorded sold or booked, and 19 of 22 construction stages are filed complete.

At a glance

Project

  • NameBasil Shreeji Residential
  • TypeResidential / Group Housing
  • Location
    • dattanagar narhe road
    • Dattanagar
    • AMBEGAON Bk
    • Haveli
    • Pune
    • 411046
  • Pincode411046
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100030918
  • ReraGenie IDRG-MH-22364

Builder

  • NameGSV CONSTRUCTIONS
  • Entity typePartnership
  • GSTIN27AAVFG7133K1ZS
  • PartnersGopal Shivraj Varma, Vishal Dharmendra Soni, Roshan phoolsing Varma, Nilesh Dilip Ghule
  • Other registrations1 more →

Key dates

this monthRegisteredSep 2021First promiseDec 2024Revised toNov 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on29 Sep 2021
  • Promised completion30 Nov 2026
  • Revised completionRevised to 30 Nov 2026 (originally 31 Dec 2024)
  • Buildings2 building records
  • Documents filed140 files

Current status

100%107 of 107 units booked
100.0%Work done, per cost certificate

Figures as on 3 Sep 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Basil Shreeji Wing ANA201253053
Basil Shreeji Wing BNA201254054

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 3 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

19 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Staircases, at 99%.

Basil Shreeji Wing A91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
Basil Shreeji Wing B91%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks99%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 3 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed120

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots120
Closed/Covered120
BuildingClosed/CoveredTotal
Basil Shreeji Wing A6060
Basil Shreeji Wing B6060

Land and ownership4

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area3,000 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on18 Aug 2026
LandownerVillageDistrict
Haresh Nanalal Tankkondhwa khurdPune
Rajesh Nanalal TankManjariPune
Harsh Rajesh TankManjariPune
Yash Rajesh TankManjariPune

Approvals and building plan

Sanctioning authorityPune Municipal Corporation
Permissible FSI10039.0
Proposed, not sanctioned10,039 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAmbegaon Pune 411046
Estimated costRs 40.11 cr
Cost incurredRs 40.11 cr
Work done100.0%
BuildingWingEstimatedIncurred
Basil Shreeji Wing ANARs 19.07 crRs 19.07 cr
Basil Shreeji Wing BNARs 19.07 crRs 19.07 cr
-NARs 1.97 crRs 1.97 cr

Certifying professionals and partners6

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectCubix Architech
ArchitectR S ASSOCIATES
EngineerRathis Group
EngineerAmol Sawant
Chartered AccountantK J S AND Associates
Chartered AccountantSolanke And Associates
PartnerRole in project
GSV CONSTRUCTIONS-

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52100025271Dec 2024 → Jan 2025

Reason as filed by the promoterOC OF THE PROPOSED SITE IS RECEIVED ALREADY. APPLYING FOR POST FACTO EXTNESION ONLY.

EA18082622194Dec 2024 → Nov 2026

Reason as filed by the promoterWe respectfully submit that the project "BASIL SHREEJI RESIDENTIAL" (MahaRERA Registration No. P52100030918) has been completed, with the Full Completion Certificate issued on 29/01/2025 and possession already handed over to the respective allottees. During review, certain sanctioned floor and parking details were found to be inadvertently incorrect on the MahaRERA Portal, for which rectification is required. We therefore request your good office to kindly extend the project validity up to 30th November 2026 solely to complete the necessary portal rectification and project closure formalities.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 24 Sep 2021
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 4 Dec 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 4 Dec 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 19 Nov 2021Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 7 Feb 2025

Documents filed140

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 140 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1.PDF3 Sep 2026
Withdrawal Update Form 1File: Form 1.PDF3 Sep 2026
Withdrawal Update Form 1File: Form 1.PDF3 Sep 2026
Withdrawal Update Form 1File: Form 1.PDF3 Sep 2026
Withdrawal Update Form 1File: Form 1.PDF3 Sep 2026
Withdrawal Update Form 1File: Form 1.PDF3 Sep 2026
Withdrawal Update Form 2File: Form 2.pdf3 Sep 2026
Withdrawal Update Form 2File: Form 2.pdf3 Sep 2026
Withdrawal Update Form 2File: Form 2.pdf3 Sep 2026
Withdrawal Update Form 2File: Form 2.pdf3 Sep 2026
Withdrawal Update Form 2File: Form 2.pdf3 Sep 2026
Withdrawal Update Form 2File: Form 2.pdf3 Sep 2026
Withdrawal Update Form 3File: CA certificate Basil shreeji Residential_11zon.pdf3 Sep 2026
Withdrawal Update Form 3File: CA certificate Basil shreeji Residential_11zon.pdf3 Sep 2026
Withdrawal Update Form 3File: CA certificate Basil shreeji Residential_11zon.pdf3 Sep 2026
Withdrawal Update Form 3File: CA certificate Basil shreeji Residential_11zon.pdf3 Sep 2026
Withdrawal Update Form 3File: CA certificate Basil shreeji Residential_11zon.pdf3 Sep 2026
Withdrawal Update Form 3File: form 33.pdf3 Sep 2026
Form 2A (FY 2025-2026)File: Basil Shreeji Residential (BWing).pdf2 Sep 2026
Form 1File: Form 1.PDF18 Aug 2026
Form 2File: Form 2.pdf18 Aug 2026
Form 3File: CA certificate Basil-compressed_compressed.pdf18 Aug 2026
Disclosure of Sold and Booked InventoryFile: sold unsold inventory (3).pdf18 Aug 2026
Withdrawal Update Form 1File: Form 1.PDF18 Aug 2026
Withdrawal Update Form 2File: Form 2.pdf18 Aug 2026
Withdrawal Update Form 3File: CA certificate Basil shreeji Residential_11zon.pdf18 Aug 2026
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form.pdf7 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - Basil Shreeji Resindential.pdf7 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate.pdf7 Feb 2025
Status of Formation of Legal Entity (Society/Co Op etc.)File: Basil Shreeji Part 2 Completion.pdf7 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full Completion OC.pdf7 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Basil Shreeji Part 1 Completion.pdf7 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Basil Shreeji Part 3 Completion.pdf7 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Basil Shreeji Full Completion.pdf7 Feb 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Basil Shreeji Part 2 Completion.pdf7 Feb 2025
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory.pdf7 Feb 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Basil Shreeji Residential.pdf23 Nov 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Basil Shreeji Residential 1.pdf23 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Basil Shreeji.pdf18 Nov 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf18 Nov 2024
Disclosure of sold/ booked inventoryFile: Discolsure of Sold Inventory - Residential.pdf18 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer Certificate for Quality Assurance Basil Shreeji Residential.pdf18 Nov 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Basil Shreeji Residential.pdf20 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Basil Shreeji Residential.pdf20 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - Basil Shreeji Residential.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENGINEER'S CERTIFICATE Basil Shreeji Residential.pdf20 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Basil Shreeji Residential.pdf20 Oct 2024
Disclosure of sold/ booked inventoryFile: Discolsure of sold, Book Inventory - Basil Shreeji Residential.pdf20 Oct 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold, Book Inventory - Basil Shreeji Residential.pdf20 Oct 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer Certificate for Quality Assurance Basil Shreeji Residential.pdf20 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate Basil shreeji Residential_11zon.pdf5 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: CA certificate Form 5 Basil shreeji Residential_11zon.pdf5 Feb 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA certificate Form 5 Basil shreeji Residential_11zon.pdf5 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Letter Residential.pdf4 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Residential.pdf4 Feb 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold inventory Residential.pdf4 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf3 Dec 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2019-20)File: Engineer Certificate.pdf3 Dec 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Basil shreeji Residential.pdf3 Dec 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect letter - Residential.pdf24 Nov 2023
Status of Formation of Legal Entity (Society/Co Op etc.)File: BASIL SHREEJI RESIDENCIAL.pdf14 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Letter - Residential.pdf6 Aug 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate June 2023 (Residential).pdf6 Aug 2023
Disclosure of sold/ booked inventoryFile: Sold and Unsold Inventory Residential.pdf6 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Residential.pdf6 Aug 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Residential.pdf6 Aug 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Letter - Residential.pdf19 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Engineer Certificate RESIDENTIAL.pdf19 May 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Sold or Unsold List - A Wing.pdf19 May 2023
Disclosure of sold/ booked inventoryFile: Sold or Unsold List - A Wing.pdf19 May 2023
Disclosure of sold/ booked inventoryFile: Sold or Unsold List - B Wing.pdf19 May 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BASIL SHREEJI RESIDENTIAL CA CERTIFICATE.pdf19 May 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: BASIL SHREEJI COMMERCIAL_20230330_0001.pdf31 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Shreeji CA certificate Residential _compressed.pdf13 Feb 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Basil Shreeji Residential - Architech Letter.pdf10 Feb 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Basil Shreeji Residential - Engg Certificate.pdf10 Feb 2023
Disclosure of sold/ booked inventoryFile: Sold Inventary Details (Oct to Dec) Residential.pdf10 Feb 2023
Layout approvalFile: Layout Plan Final.pdf4 Dec 2022
Building plan approvalFile: Ground and Stilt Plan Final.pdf4 Dec 2022
Building plan approvalFile: Floor Plan.pdf4 Dec 2022

How this compares with Pune

100%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one moved by 23 months
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep Basil Shreeji Residential on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Dattanagar13,700+ in Pune

2 kmBasil Shreeji ResidentiaCompleted 163Lapsed / revoked 119Other 151Dot size: filed unitsN

Filed coordinates, straight-line distance. 433 registered projects within 2 km.

Builder: GSV CONSTRUCTIONS

GSV CONSTRUCTIONS has 2 registrations on MahaRERA, including Basil Shreeji Residential and Basil Shreeji Commercial. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if Basil Shreeji Residential is delayed beyond 30 Nov 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of Basil Shreeji Residential?

The registered promoter entity is GSV CONSTRUCTIONS, a partnership as per the filing. Its GSTIN 27AAVFG7133K1ZS can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in Basil Shreeji Residential?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for Basil Shreeji Residential?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at Basil Shreeji Residential?

The professionals named in the filing: Architect: Cubix Architech; Architect: R S ASSOCIATES; Engineer: Rathis Group; Engineer: Amol Sawant; Chartered Accountant: K J S AND Associates; Chartered Accountant: Solanke And Associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Basil Shreeji Residential?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Basil Shreeji Residential. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Basil Shreeji Residential to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.