Home / Browse projects / Pune, Maharashtra / Basil Shreeji Commercial
Basil Shreeji Commercial
RG-MH-22599 · RERA P52100031883 · Last updated on MahaRERA portal: 7 Sep 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 23 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Basil Shreeji Commercial is a Commercial project by Gsv Constructions in Pune, Maharashtra, registered with MahaRERA as P52100031883 on 22 Nov 2021. Possession is promised by 30 Nov 2026. The completion date has moved by 23 months from the original filing. 18 of the 32 units on this registration are recorded sold or booked, and 20 of 22 construction stages are filed complete.
At a glance
Project
- NameBasil Shreeji Commercial
- TypeCommercial
- Location
- Dattanagar Narhe Road
- Dattanagar
- AMBEGAON Bk
- Haveli
- Pune
- 411046
- Pincode411046
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100031883
- ReraGenie IDRG-MH-22599
Builder
- NameGsv Constructions
- Entity typePartnership
- Partnersgopal shivraj varma, Nilesh Dilip Ghule, Roshan Phoolsingh Varma, Vishal Dharmendra Soni
- Other registrations1 more →
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on22 Nov 2021
- Promised completion30 Nov 2026
- Revised completionRevised to 30 Nov 2026 (originally 31 Dec 2024)
- Buildings2 building records
- Documents filed140 files
Current status
Figures as on 7 Sep 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A wing | NA | 19 | 14 | 0 | 19 | 19 |
| B wing | NA | 19 | 14 | 0 | 13 | 13 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 7 Sep 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Podiums (if any), at 0%.
A wing91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
B wing91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 100% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 7 Sep 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 100% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 100% |
| Solid Waste Management And Disposal | Yes | 100% |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | Yes | 100% |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed45
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| A wing | 20 | 12 | 32 |
| B wing | 1 | 12 | 13 |
Land and ownership4
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Haresh Nanalal Tank | kondhwa khurd | Pune |
| Rajesh Nanalal Tank | kondhwa khurd | Pune |
| Harsh Rajesh Tank | kondhwa khurd | Pune |
| Yash Rajesh Tank | kondhwa khurd | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| A wing | NA | Rs 1.63 cr | Rs 1.63 cr |
| B wing | NA | Rs 1.63 cr | Rs 1.63 cr |
| - | NA | Rs 25.00 lakh | Rs 25.00 lakh |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Cubix Architech |
| Architect | R S Associates |
| Engineer | Rathis Group |
| Engineer | Amol Sawant |
| Chartered Accountant | KJS and associates |
| Partner | Role in project |
|---|---|
| Gsv Constructions | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterWE HAVE RECEIVED PART OC ON DATED 13/6/2024 & FULL OC RECEIVED 29/07/2024 Based on the above Occupancy Certificates, we have already handed over possession of the units to the respective allottees while reviewing the project details on the MahaRERA Portal, we observed that the number of sanctioned floors and parking details have inadvertently been mentioned incorrectly as compared to the sanctioned plan so we need correction there we required extension till 30 Nov 2026 we have uploaded undertaking also kindly grant our extension.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 16 Nov 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 4 Dec 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 4 Dec 2022 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 5 Dec 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 7 Feb 2025
Documents filed140
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 140 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Cubix Architects Certificate 2.PDF | 7 Sep 2026 |
| Withdrawal Update Form 1File: Cubix Architects Certificate 2.PDF | 7 Sep 2026 |
| Withdrawal Update Form 1File: Cubix Architects Certificate 2.PDF | 7 Sep 2026 |
| Withdrawal Update Form 1File: Cubix Architects Certificate 2.PDF | 7 Sep 2026 |
| Withdrawal Update Form 1 | 7 Sep 2026 |
| Withdrawal Update Form 2File: Rathi Group Engineer Certificate Form 2 Basil Shreeji Commercial.pdf | 7 Sep 2026 |
| Withdrawal Update Form 2File: Rathi Group Engineer Certificate Form 2 Basil Shreeji Commercial.pdf | 7 Sep 2026 |
| Withdrawal Update Form 2File: Rathi Group Engineer Certificate Form 2 Basil Shreeji Commercial.pdf | 7 Sep 2026 |
| Withdrawal Update Form 2File: Rathi Group Engineer Certificate Form 2 Basil Shreeji Commercial.pdf | 7 Sep 2026 |
| Withdrawal Update Form 2 | 7 Sep 2026 |
| Withdrawal Update Form 3File: Basil Shreeji Commercial CA Certificate Form 3_compressed.pdf | 7 Sep 2026 |
| Withdrawal Update Form 3File: Basil Shreeji Commercial CA Certificate Form 3_compressed.pdf | 7 Sep 2026 |
| Withdrawal Update Form 3File: Basil Shreeji Commercial CA Certificate Form 3_compressed.pdf | 7 Sep 2026 |
| Withdrawal Update Form 3File: Basil Shreeji Commercial CA Certificate Form 3_compressed.pdf | 7 Sep 2026 |
| Withdrawal Update Form 3 | 7 Sep 2026 |
| Form 2A (FY 2025-2026)File: Basil Shreeji Commercial FORM 2A.pdf | 5 Sep 2026 |
| Form 1File: Cubix Architects Certificate 2.PDF | 18 Aug 2026 |
| Form 2File: Rathi Group Engineer Certificate Form 2 Basil Shreeji Commercial.pdf | 18 Aug 2026 |
| Form 3File: Basil Shreeji Commercial CA Certificate Form 3_compressed.pdf | 18 Aug 2026 |
| Disclosure of Sold and Booked InventoryFile: BASIL SHREEJI SOLD UNSOLD INVENTORY.pdf | 18 Aug 2026 |
| Form 1File: Cubix Architects Certificate 2.PDF | 18 Aug 2026 |
| Form 2File: Rathi Group Engineer Certificate Form 2 Basil Shreeji Commercial.pdf | 18 Aug 2026 |
| Form 3File: Basil Shreeji Commercial CA Certificate Form 3_compressed.pdf | 18 Aug 2026 |
| Disclosure of Sold and Booked InventoryFile: BASIL SHREEJI SOLD UNSOLD INVENTORY.pdf | 18 Aug 2026 |
| Form 1File: Cubix Architects Certificate 2.PDF | 18 Aug 2026 |
| Form 2File: Rathi Group Engineer Certificate Form 2 Basil Shreeji Commercial.pdf | 18 Aug 2026 |
| Form 3File: Basil Shreeji Commercial CA Certificate Form 3_compressed.pdf | 18 Aug 2026 |
| Disclosure of Sold and Booked InventoryFile: BASIL SHREEJI SOLD UNSOLD INVENTORY.pdf | 18 Aug 2026 |
| Withdrawal Update Form 1File: Cubix Architects Certificate 2.PDF | 18 Aug 2026 |
| Withdrawal Update Form 2File: Rathi Group Engineer Certificate Form 2 Basil Shreeji Commercial.pdf | 18 Aug 2026 |
| Withdrawal Update Form 3File: Basil Shreeji Commercial CA Certificate Form 3_compressed.pdf | 18 Aug 2026 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Form - Basil Shreeji Commercial.pdf | 7 Feb 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer's Certificate - Basil Shreeji Commercial.pdf | 7 Feb 2025 |
| Status of Formation of Legal Entity (Society/Co Op etc.)File: Society Registration Certificate - Basil Shreeji Commercial.pdf | 7 Feb 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Basil Shreeji Part 3 Completion.pdf | 7 Feb 2025 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Basil Shreeji Full Completion.pdf | 7 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory - commercial.pdf | 7 Feb 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate_GSV Construction Commercial-Q-2.pdf | 18 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Basil Shreeji Commercial ca certificate_11zon.pdf | 18 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form 2A - Basil Shreeji Commercial.pdf | 10 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Basil Shreeji Commercial.pdf | 10 Dec 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part Completion OC - Commercial.pdf | 20 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full Completion OC - Commercial.pdf | 20 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Part Completion OC - Commercial.pdf | 20 Nov 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full Completion OC - Commercial.pdf | 20 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Basil Shreeji.pdf | 18 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 18 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer Certificate for Quality Assurance Basil Shreeji Commercial.pdf | 18 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Basil Shreeji commercial.pdf | 18 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Basil Shreeji Commercial ca certificate.pdf | 18 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Discolsure of Sold Inventory - Commercial.pdf | 18 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Basil Shreeji.pdf | 18 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Basil Shreeji commercial.pdf | 18 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Basil Shreeji Commercial ca certificate.pdf | 18 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 18 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: Discolsure of Sold Inventory - Commercial.pdf | 18 Nov 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer Certificate for Quality Assurance Basil Shreeji Commercial.pdf | 18 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Basil Shreeji Residential.pdf | 20 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate Basil Shreeji commercial.pdf | 20 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate - Basil Shreeji Commercial.pdf | 20 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Basil Shreeji Commercial.pdf | 20 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Architect Certificate Basil Shreeji commercial.pdf | 20 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Basil Shreeji Commercial.pdf | 20 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold Booked Inventory - Basil Shreeji Commercial.pdf | 20 Oct 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold Book Inventory - Basil Shreeji Commercial.pdf | 20 Oct 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer Certificate for Quality Assurance Basil Shreeji commercial.pdf | 20 Oct 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCHITECT LETTER COMMERCIAL.pdf | 5 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: COMMERCIAL .pdf | 5 Feb 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Commercial.pdf | 5 Feb 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure of sold, unsold inventory commercial.pdf | 5 Feb 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA certificate Basil shreeji Commercial_11zon (1).pdf | 5 Feb 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: CA Certificate Form 5 Basil shreeji Commercial_11zon.pdf | 5 Feb 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect letter - Commercial.pdf | 3 Dec 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 3 Dec 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Basil shreeji Commercial_11zon.pdf | 3 Dec 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Letter - Commercial.pdf | 6 Aug 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate June 2023 (Commercial).pdf | 6 Aug 2023 |
| Disclosure of sold/ booked inventoryFile: sold and unsold inventory commercial A and B wing.pdf | 6 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Commercial.pdf | 6 Aug 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate Commercial.pdf | 14 Jun 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 140 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Basil Shreeji Commercial on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Dattanagar13,700+ in Pune
Filed coordinates, straight-line distance. 433 registered projects within 2 km.
Sai Nagari Phase I
Saikedareshwar Developers LLP
SAI NAGARI Phase V
Saikedareshwar Developers LLP
Sai Nagari Phase II
Saikedareshwar Developers LLP
Sai Nagari Phase IV
Saikedareshwar Developers LLP
Sai Nagari Phase III
Saikedareshwar Developers LLP
Bella Casa - Phase 1
Kakkad Infra LLP
Builder: Gsv Constructions
GSV CONSTRUCTIONS has 2 registrations on MahaRERA, including Basil Shreeji Residential and Basil Shreeji Commercial. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Basil Shreeji Commercial is delayed beyond 30 Nov 2026?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Basil Shreeji Commercial?
The registered promoter entity is Gsv Constructions, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Basil Shreeji Commercial?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Basil Shreeji Commercial?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Basil Shreeji Commercial?
The professionals named in the filing: Architect: Cubix Architech; Architect: R S Associates; Engineer: Rathis Group; Engineer: Amol Sawant; Chartered Accountant: KJS and associates. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Basil Shreeji Commercial?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback