BASIL CHANDRAKANT

By SHREE SADGURU DEVELOPERS

RG-MH-40924 · RERA P52100047305 · Last updated on MahaRERA portal: 20 Apr 2026

Source: official MahaRERA filing

Red flags

  • Possession 3 months past the filed date
  • Rs 15.00 crore secured on the land, in favour of ADITYA BIRLA CAPITAL LIMITED

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Jul 2026Possession promised3 months past this date
12 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 10%
83 of 203Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 151 documents Report an error

BASIL CHANDRAKANT is a Others project by SHREE SADGURU DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100047305 on 17 Oct 2022. Possession was promised by 31 Jul 2026 and is now 3 months past that date. 120 of the 203 units on this registration are recorded sold or booked, and 12 of 22 construction stages are filed complete.

At a glance

Project

  • NameBASIL CHANDRAKANT
  • TypeOthers
  • Location
    • Dattanagar Jambulwadi road
    • Ambegaon Budruk
    • AMBEGAON Bk
    • Haveli
    • Pune
    • 411046
  • Pincode411046
  • RERA no.P52100047305
  • ReraGenie IDRG-MH-40924

Builder

  • NameSHREE SADGURU DEVELOPERS
  • Entity typePartnership
  • GSTIN27ADJFS2396D2ZT
  • PartnerVIKAS KHANDU HAJARE
  • PartnerGOPAL SHIVRAJ VARMA
  • Other registrations8 more →
  • Completed4 of 9
  • No longer live2 lapsed, de-registered or revoked
  • Past their filed date1

Key dates

3 months past promisethis monthRegisteredOct 2022PromisedJul 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on17 Oct 2022
  • Promised completion31 Jul 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed151 files

Current status

59%120 of 203 units booked
100.0%Work done, per cost certificate

Figures as on 20 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
A WingsNA1288846134
B wingsNA128452469

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 20 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 10%.

A Wings82%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%
B wings28%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure10%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 20 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes80%
Street LightingYes100%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes100%
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingYes100%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership7

MahaRERA does not publish landowner contact details. A declared charge means a lender has a claim over the project land. Ask the promoter for a no-objection certificate from the lender named above before you pay any amount.

Land area4,550 sq m
Land owned byThe promoter, with other names on the file
Named landowners7
Encumbrance on the landDeclared present
Charge in favour ofADITYA BIRLA CAPITAL LIMITED
Secured amountRs 15.00 crore
CERSAI search filedYes
Declared on20 Nov 2025
LandownerVillageDistrict
Akshay dattatrya JadhavAMBEGAON BkPune
SARIKA DATTATRAY JADHAVAMBEGAON BkPune
SAMBAJI DATTATRAY JADHAVAMBEGAON BkPune
HRUSHIKESH DATTATRAY JADHAVAMBEGAON BkPune
AMIT SATISH JADHAVAMBEGAON BkPune
SHOBHA SATISH JADHAVAMBEGAON BkPune
GAYATRI MAHESH BARATEPune (M Corp.)Pune

Approvals and building plan

Sanctioning authorityPUNE MUNICIPAL CORPORATION
Permissible FSI11262.48
Proposed, not sanctioned8,227 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchAmbegaon Pune
Estimated costRs 40.01 cr
Cost incurredRs 40.01 cr
Work done100.0%
BuildingWingEstimatedIncurred
A WingsNARs 34.81 crRs 34.81 cr
B wingsNARs 2.60 crRs 2.60 cr
-NARs 2.60 crRs 2.60 cr

Certifying professionals and partners10

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectR S Associates
ArchitectAr. SACHIN KUSHALRAO BHASME
EngineerSV & Associates
EngineerRATHI'S GROUP
EngineerSHAILENDRA KISAN THORAT
EngineerAMOL SANTU SAWANT
Chartered AccountantK J S AND ASSOCIATES
Chartered AccountantWARULE & ASSOCIATES
Chartered AccountantAJITSINGH KHUMSINGH PARIHAR
Chartered AccountantTANAJI KISAN CHORGE
PartnerRole in project
SHREE SADGURU DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 25 Apr 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Mar 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Mar 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed151

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 151 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: form 1.pdf20 Apr 2026
Withdrawal Update Form 2File: Chandrakant Engineers Certificate Scanned.pdf20 Apr 2026
Withdrawal Update Form 3File: Form No 3_compressed.pdf20 Apr 2026
Withdrawal Update Form 1File: basil chandrakantform 1 BC.pdf22 Jan 2026
Withdrawal Update Form 2File: Basil Chnadrakant FORM 2.pdf22 Jan 2026
Withdrawal Update Form 3File: Basil Chandrakant form 3_compressed.pdf22 Jan 2026
Form 1File: Architect Certificate.pdf7 Nov 2025
Form 2File: 10th Engineer Certificate of Basil Chandrakant.pdf7 Nov 2025
Form 3File: form 3.pdf7 Nov 2025
Disclosure of Sold and Booked InventoryFile: basil chandrakant booked inventory details.pdf7 Nov 2025
Form 1File: Architect Certificate.pdf7 Nov 2025
Form 2File: form 2.pdf7 Nov 2025
Form 3File: BASIL CHANDRAKANT FORM 3.pdf7 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold unsold.pdf7 Nov 2025
Form 1File: BC ARCHITECH CERTIFICATE SEP 2024.pdf7 Nov 2025
Form 2File: form 2.pdf7 Nov 2025
Form 3File: form 3.pdf7 Nov 2025
Disclosure of Sold and Booked InventoryFile: BC Booked Inventory SEP 2024.pdf7 Nov 2025
Form 1File: form 1.pdf7 Nov 2025
Form 2File: form 2.pdf7 Nov 2025
Form 3File: form 3.pdf7 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold inventory.pdf7 Nov 2025
Form 1File: Architect Letter for Rera_compressed.pdf7 Nov 2025
Form 2File: 6th Engineer Certificate of Basil Chandrakant.pdf7 Nov 2025
Form 3File: CA Certificates March 2024.pdf7 Nov 2025
Disclosure of Sold and Booked InventoryFile: Discloser Of Sold Booked Inventory.pdf7 Nov 2025
Form 1File: Architects Certificate.pdf7 Nov 2025
Form 2File: form 2 DEC 2023.pdf7 Nov 2025
Form 3File: form 3 dec 2023.pdf7 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold unsold Dec 2023_compressed.pdf7 Nov 2025
Form 1File: arch certificate.pdf7 Nov 2025
Form 2File: Engineers Certificate.pdf7 Nov 2025
Form 3File: CA Certificates.pdf7 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold unsold SEP 2023.pdf7 Nov 2025
Form 1File: architech certi july23.pdf7 Nov 2025
Form 2File: 4th Engineer Certificate of Basil Chandrakant.pdf7 Nov 2025
Form 3File: RERA certificates June 2023.pdf7 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold unsold JUNE 2023.pdf7 Nov 2025
Form 1File: Architech Certificates.pdf7 Nov 2025
Form 2File: FORM 2 ENGINEER CER SIGN.pdf7 Nov 2025
Form 3File: CA certificates March 2023.pdf7 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold unsold MARCH 2023.pdf7 Nov 2025
Form 1File: Architech Certificates.pdf7 Nov 2025
Form 2File: 2nd Engineer Certi.PDF7 Nov 2025
Form 3File: form 3.pdf7 Nov 2025
Disclosure of Sold and Booked InventoryFile: sold unsold Dec 2022.pdf7 Nov 2025
Form 1File: Architect Letter form 1 chandrakant.pdf17 Oct 2025
Form 2File: Engineer Certificate form 2 chandrakant.pdf17 Oct 2025
Form 3File: Basil Chandrakant CA Certificate Q2_compressed.pdf17 Oct 2025
Disclosure of Sold and Booked InventoryFile: Disclosure of Sold Booked Inventory Basil Chandrakant_compressed.pdf17 Oct 2025
Form 1File: FORM 1.pdf15 Aug 2025
Form 2File: FORM 2.pdf15 Aug 2025
Form 3File: FORM 3.pdf15 Aug 2025
Disclosure of Sold and Booked InventoryFile: SOLD UNSOLD INVENTORY.pdf15 Aug 2025
Disclosure of sold/ booked inventoryFile: basil chandrakant booked inventory details_compressed.pdf9 Apr 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2.pdf8 Apr 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1.pdf7 Apr 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: BASIL CHANDRAKANT.pdf16 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate form 1 basil chandrakant.pdf13 Jan 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate Form 2 chandrakant.pdf13 Jan 2025
Disclosure of sold/ booked inventoryFile: chandrakant sold unsold inventory.pdf13 Jan 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: SHREE SADGURU DEVELOPERS BASIL CHANDRAKANT.pdf26 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 Architect Certificate.pdf19 Oct 2024
Disclosure of sold/ booked inventoryFile: Sold unsold.pdf19 Oct 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificates Basil Chandrakant.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: RERA FORM 2 APR-JUNE-24.pdf17 Oct 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engineer certificate Basil Chandrakant.pdf17 Oct 2024
Disclosure of sold/ booked inventoryFile: Discloser Of Sold - Booked Inventory 31-03-2023.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: Discloser Of Sold- Booked Inventory 30-06-2023_11zon.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: Discloser Of Sold Booked Inventory 30-09-2023_11zon.pdf13 Aug 2024
Disclosure of sold/ booked inventoryFile: Discloser Of Sold Booked Inventory 31-03-2024 11zon.pdf24 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Basil Chandrakant_11zon.pdf15 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architech certificate dt june 2024.pdf12 Jul 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate dec-22_11zon.pdf12 Jul 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate dtd 10-04-2023.pdf8 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Eng certificate form 2 dt 15-3-24.pdf8 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A 2023-2024.pdf8 Jul 2024
Disclosure of sold/ booked inventoryFile: sold inventory bc dtd 30-06-2024.pdf8 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2 APR-JUNE-24.pdf5 Jul 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 Eng Certi dtd 11-4-23.pdf5 Jul 2024

How this compares with Pune

59%of this project is bookeddistrict median 31%
26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is on the register

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep BASIL CHANDRAKANT on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Ambegaon Budruk13,700+ in Pune

Builder: SHREE SADGURU DEVELOPERS

SHREE SADGURU DEVELOPERS has 9 registrations on MahaRERA, including EKNATH RESIDENCY and HIRALAXMI APARTMENT. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if BASIL CHANDRAKANT is delayed beyond 31 Jul 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BASIL CHANDRAKANT?

The registered promoter entity is SHREE SADGURU DEVELOPERS, a partnership as per the filing. Its GSTIN 27ADJFS2396D2ZT can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BASIL CHANDRAKANT?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BASIL CHANDRAKANT?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BASIL CHANDRAKANT?

The professionals named in the filing: Architect: R S Associates; Architect: Ar. SACHIN KUSHALRAO BHASME; Engineer: SV & Associates; Engineer: RATHI'S GROUP; Engineer: SHAILENDRA KISAN THORAT; Engineer: AMOL SANTU SAWANT. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BASIL CHANDRAKANT?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BASIL CHANDRAKANT. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BASIL CHANDRAKANT to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.