Home / Browse projects / Raigarh, Maharashtra / BANDAL VED BHUMI-PHASE 2

Completed No litigation declared Plotted project

BANDAL VED BHUMI-PHASE 2

By Nilesh Kisanrao Bandal

RG-MH-26105 · RERA P52000003424 · Last updated on MahaRERA portal: 30 Apr 2026

Source: official MahaRERA filing

Red flags

  • Completion date moved by 32 months
  • 2 extensions taken

Clear

  • No litigation declared
  • No complaints on record
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Raigarh registration emailed to you, free during the pilot beta.
Apr 2025Possession promisedregistration recorded completed
43 of 57Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 132 documents Report an error

BANDAL VED BHUMI-PHASE 2 is a Plotted project by Nilesh Kisanrao Bandal in Raigarh, Maharashtra, registered with MahaRERA as P52000003424 on 5 Aug 2017. The registration is recorded completed; possession was promised by 28 Apr 2025. The completion date has moved by 32 months from the original filing. 14 of the 57 units on this registration are recorded sold or booked.

At a glance

Project

  • NameBANDAL VED BHUMI-PHASE 2
  • TypePlotted
  • Location
    • Shrivardhan-Mhasala Road
    • Bhoste
    • Shrivardhan
    • Raigarh
    • 402110
  • Pincode402110
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52000003424
  • ReraGenie IDRG-MH-26105

Builder

  • NameNilesh Kisanrao Bandal
  • Entity typeIndividual
  • GSTIN27AEQPB0988L1ZY
  • Other registrations1 more →
  • Completed1 of 2
  • Declared earlier projects2 →

Key dates

this monthRegisteredAug 2017First promiseAug 2022Revised toApr 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on5 Aug 2017
  • Promised completion28 Apr 2025
  • Revised completionRevised to 28 Apr 2025 (originally 28 Aug 2022)
  • BuildingsNot stated in filing
  • Documents filed132 files

Current status

25%14 of 57 units booked

Figures as on 30 Apr 2026, this project's latest MahaRERA filing.

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 30 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

NA Plot Without Structure:

ActivityProgress
ExcavationNot applicable
Basement (if any)Not applicable
Podiums (if any)Not applicable
PlinthNot applicable
Stilt FloorNot applicable
Slabs of Super StructureNot applicable
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/PremisesNot applicable
Sanitary Fittings within the flats / premisesNot applicable
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water TanksNot applicable
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.Not applicable
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.Not applicable

Progress on shared amenities15

As on 30 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)NoNot applicable
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsYes100%
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Land and ownership

MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area37,878 sq m
Land owned byThe promoter
Named landownersNone

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branch11/12 Nava Swaraj Society Ltd Ideal Colony Paud Road Kothrud Pune 411038

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr. Nitin Mahadeorao Waghmare

Extensions applied for2

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52000017103Aug 2022 → Jun 2024

Reason as filed by the promoterAs our project is exempted from RERA we require the RERA extension for Agreement registration only.

EXT52000022938Aug 2022 → Apr 2025

Reason as filed by the promoterThe project work is 100% completed. We have received full Occupancy Certificate dated 28/04/25. We require extension till the date of Occupancy Certificate.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 11 Sep 2017
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 9 Jan 2020
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 28 Jul 2017
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Jan 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 30 Apr 2026

Documents filed132

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 132 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Completion CertificateFile: Vedbhumi_Architects_Completion Certificate__Ack.pdf30 Apr 2026
Completion CertificateFile: CC VERIFICATION - BANDAL.pdf17 Nov 2025
Completion CertificateFile: LAYOUT 1.pdf17 Nov 2025
Completion CertificateFile: PLAN 2.pdf17 Nov 2025
Completion CertificateFile: CLUB HOUSE PLAN.pdf17 Nov 2025
Completion CertificateFile: Occupency Certificate.pdf8 Aug 2025
Declaration in FORM BFile: Form _B_Bandal Vedbhumi Phase 2.pdf29 May 2025
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Gat No 58_Bhoste_bhogavata pramanpatra OC.pdf22 May 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1_Bandal Vedbhumi_Phase 2.pdf11 Apr 2025
Certificates of CA (Form 3)File: Form 3_Bandal Vedbhumi_Phase II.pdf11 Apr 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form _2_Bandal Vedbhumi Phase II.pdf11 Apr 2025
Disclosure of sold/ booked inventoryFile: Discloure of sold booked inventory Bandal Vedbhumi Phase II.pdf9 Apr 2025
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf13 Jan 2025
Certificates of CA (Form 3)File: Form 3 (2)_11zon.pdf13 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form - 2.pdf13 Jan 2025
Disclosure of sold/ booked inventoryFile: Discolsure of Sold_Booked Inventory.pdf13 Jan 2025
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf10 Oct 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf10 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 (2).pdf9 Oct 2024
Certificates of CA (Form 3)File: Form 3 (1)_11zon.pdf9 Oct 2024
Disclosure of sold/ booked inventoryFile: Discolsure of Sold_booked Inventory_Vedbhumi _Phase II.pdf9 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 (2).pdf9 Oct 2024
Certificates of CA (Form 3)File: Form 3 (1)_11zon.pdf9 Oct 2024
Disclosure of sold/ booked inventoryFile: Discolsure of Sold_booked Inventory_Vedbhumi _Phase II.pdf9 Oct 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 (3).pdf2 Jul 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2 (2).pdf2 Jul 2024
Disclosure of sold/ booked inventoryFile: Discolsure of sold booked inventory.pdf2 Jul 2024
Certificates of CA (Form 3)File: Form 3 (1)_compressed.pdf2 Jul 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form5 (2023-2024).pdf2 Jul 2024
Certificates of CA (Form 3)File: Form 3_31_3_2018_11zon.pdf11 Jun 2024
Certificates of CA (Form 3)File: Form 3_31-3-19_11zon.pdf11 Jun 2024
Certificates of CA (Form 3)File: Form 3_31_3_2020_11zon.pdf11 Jun 2024
Certificates of CA (Form 3)File: Form 3_dated 31-3-21_11zon.pdf11 Jun 2024
Certificates of CA (Form 3)File: Form 3_dated 31-3-22_11zon.pdf11 Jun 2024
Certificates of CA (Form 3)File: Form 3_31-12-2022_11zon.pdf11 Jun 2024
Certificates of CA (Form 3)File: Form 3_dated 31-3-23_11zon.pdf11 Jun 2024
Certificates of CA (Form 3)File: Form 3_30_6_23_11zon.pdf11 Jun 2024
Certificates of CA (Form 3)File: Form 3_30-9-2023_11zon.pdf11 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5_22_23.pdf11 Jun 2024
Declaration in FORM BFile: Form B bandal ved bhumi.pdf10 Jun 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form5 (2023-2024).pdf10 Jun 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Clarification_Declartion for not submitting Form 2A_vedbhumi.pdf7 Jun 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold booking inventory_Vedbhumi_Phase_II(Mar2023).pdf7 Jun 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1.pdf4 Apr 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf4 Apr 2024
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventorY.pdf4 Apr 2024
Certificates of CA (Form 3)File: Form 3.pdf4 Apr 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1.pdf3 Jan 2024
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: FORM-2.pdf3 Jan 2024
Disclosure of sold/ booked inventoryFile: Bandal Vedbhumi_PhaseII disclosure of sold booked inventory.pdf3 Jan 2024
Certificates of CA (Form 3)File: FORM-3_compressed.pdf3 Jan 2024
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Architects certificate_Vedbhumi_Phase _II_compressed.pdf7 Oct 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form_2 Vedbhumi_Phase_2_compressed.pdf7 Oct 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold booked inventory_Vedbhumi _Phase II.pdf7 Oct 2023
Certificates of CA (Form 3)File: FORM-3_compressed.pdf7 Oct 2023
Declaration in FORM BFile: Affidavit_Declartion _Bandal Vedbhumi_PhaseII_compressed.pdf19 Jul 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1-Architect Certificate_Phase 2_23-06-2023.pdf6 Jul 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2-Engg certificate June23_compressed.pdf6 Jul 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Clarification_Declartion for not submitting Form 2A_vedbhumi.pdf6 Jul 2023
Disclosure of sold/ booked inventoryFile: Disclosure of sold booking inventory_Vedbhumi_Phase_II.pdf6 Jul 2023
Certificates of CA (Form 3)File: FORM-3 -CA Certificate June23_compressed.pdf6 Jul 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM-5 (FY 22-23).pdf6 Jul 2023
Certificates of CA (Form 3)File: RERA FORM-3 (JUNE-22).pdf14 Jun 2023
Certificates of CA (Form 3)File: RERA FORM-3 (SEPT-22).pdf14 Jun 2023
Certificates of CA (Form 3)File: FORM-3 (FY 22-23)-6.pdf14 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1-Architect Certificate_Phase 2_31-03-2018-1.pdf13 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1-Architect Certificate_Phase 2_31-03-2019-2.pdf13 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1-Architect Certificate_Phase 2_31-03-2020-3.pdf13 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1-Architect Certificate_Phase 2_31-03-2021-4.pdf13 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1-Architect Certificate_Phase 2 31-12-2021-5.pdf13 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1-Architect Certificate_Phase 2 31-03-2022-6.pdf13 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1-Architect Certificate_Phase 2_30-06-2022-7.pdf13 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1-Architect Certificate_Phase 2_30-09-2022-8.pdf13 Jun 2023
Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: FORM-1-Architect Certificate_Phase 2_31-03-2023-9.pdf13 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate_Vedbhumi_Mar2018-1.pdf13 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate_Vedbhumi_Mar2019-2.pdf13 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate_Vedbhumi_Mar2020-3.pdf13 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate_Vedbhumi_Mar2021-4.pdf13 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate_Vedbhumi_21Dec21-5.pdf13 Jun 2023
Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Engg Certificate_Vedbhumi_Mar2022-6.pdf13 Jun 2023

How this compares with Raigarh

25%of this project is bookeddistrict median 29%
20%of Raigarh projects moved their completion datethis one moved by 32 months
26%of Raigarh registrations have lapsed or been cancelledthis one is completed

Computed across the 5,900+ Raigarh projects on ReraGenie, from their own filings.

Free monthly report: Navi Mumbai and Raigad on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep BANDAL VED BHUMI-PHASE 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Bhoste5,900+ in Raigarh

Builder: Nilesh Kisanrao Bandal

Nilesh Kisanrao Bandal has 2 registrations on MahaRERA, including BANDAL VED BHUMI-PHASE 2 and VEDSINDHU. Its filings disclose 2 earlier MahaRERA projects: declares 2 of 2 past projects completed on time. Read the full track record. See more projects on the Raigarh district page.

Frequently asked questions

What are my rights if BANDAL VED BHUMI-PHASE 2 is delayed beyond 28 Apr 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BANDAL VED BHUMI-PHASE 2?

The registered promoter entity is Nilesh Kisanrao Bandal, an individual as per the filing. Its GSTIN 27AEQPB0988L1ZY can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BANDAL VED BHUMI-PHASE 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BANDAL VED BHUMI-PHASE 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BANDAL VED BHUMI-PHASE 2?

The professionals named in the filing: Architect: Ar. Nitin Mahadeorao Waghmare. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BANDAL VED BHUMI-PHASE 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BANDAL VED BHUMI-PHASE 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BANDAL VED BHUMI-PHASE 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.