Home / Browse projects / Pune, Maharashtra / Balaji Siddhi
Balaji Siddhi
By SHRI BALAJI SIDDHI DEVELOPERS
RG-MH-22803 · RERA P52100033044 · Last updated on MahaRERA portal: 16 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Completion date moved by 19 months
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Balaji Siddhi is a Residential / Group Housing project by SHRI BALAJI SIDDHI DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100033044 on 3 Feb 2022. Possession is promised by 31 Oct 2027. The completion date has moved by 19 months from the original filing. 65 of the 152 units on this registration are recorded sold or booked, and 11 of 18 construction stages are filed complete.
At a glance
Project
- NameBalaji Siddhi
- TypeResidential / Group Housing
- Location
- Ambegoan Pune - Mumbai Highway
- Ambegaon Bk
- Haveli
- Pune
- 411046
- Pincode411046
- RERA no.P52100033044
- ReraGenie IDRG-MH-22803
Builder
- NameSHRI BALAJI SIDDHI DEVELOPERS
- Entity typePartnership
- PartnersVikas Laxmanrao Pawar, Vijaykumar Sahebrao Patil, Deepak Ashok Walhekar, Vinod Laxmanrao Pawar
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on3 Feb 2022
- Promised completion31 Oct 2027
- Revised completionRevised to 31 Oct 2027 (originally 31 Mar 2026)
- Buildings2 building records
- Documents filed96 files
Current status
Figures as on 16 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Wing A and B | Wing A | 16 | 13 | 76 | 0 | 76 |
| Wing A and B | Wing B | 16 | 13 | 76 | 0 | 76 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 16 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
11 of 18 construction stages are filed complete across 2 buildings. The stage furthest along is Sanitary Fittings within the flats / premises, at 90%.
Wing A and B · wing Wing A98%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 90% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 90% |
Wing A and B · wing Wing B79%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | Not applicable |
| Plinth | 100% |
| Stilt Floor | Not applicable |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 90% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 60% |
Progress on shared amenities15
As on 16 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 80% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed242
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Total |
|---|---|---|
| Wing A and B Wing A | 121 | 121 |
| Wing A and B Wing B | 121 | 121 |
Land and ownership3
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Shree Siddhivinayak Developers And Company | Dhanakwadi | Pune |
| Shree Siddhivinayak Developer And Company | Pune (M Corp.) | Pune |
| Shri Balaji Siddhi Developers | Dhanakwadi | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| Wing A and B | Wing B | Rs 24.46 cr | Rs 19.08 cr |
| Wing A and B | Wing A | Rs 22.16 cr | Rs 22.16 cr |
| - | NA | Rs 1.90 cr | - |
Certifying professionals and partners7
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Rajendra H Thite |
| Engineer | Satis Dnyanoba Bodare |
| Engineer | Mahesh Mashalkar |
| Engineer | Karpe Ashish |
| Chartered Accountant | Pawar Kulkarni & Associates |
| Chartered Accountant | SUNIL NIMBALKAR & ASSOCIATES |
| Chartered Accountant | Kumparam Jugataram Suthar & Associates |
| Partner | Role in project |
|---|---|
| SHRI BALAJI SIDDHI DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterThere are total 2 wings (Wing A & Wing B) in the one building in the said project out of which we have already completed Wing A and taken Part Occupancy Certificate on 07/10/2025 for the said Wing A from Competent Authority. We have completed 80% construction work of the Wing B. Due to financial difficulties and unavoidable circumstances, we have not completed the entire project on the proposed date 31/03/2026, so we are applying for extension under Section 7(3) for 1 year 7 months proposed extension date 31/10/2027.
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 31 Jan 2022 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 4 Jun 2026 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 4 Jun 2026 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 24 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Oct 2027
Documents filed96
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 96 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: ARCHITECH CERTIFICATE.pdf | 16 Jul 2026 |
| Withdrawal Update Form 2File: Engineer Caertificate.pdf | 16 Jul 2026 |
| Withdrawal Update Form 3File: CA CERTIFICATE.pdf | 16 Jul 2026 |
| Form 5 (FY 2024-2025)File: Final RERA Audit FY 2024-25_Balaji Siddhi.pdf | 1 Jul 2026 |
| Declaration and undertaking (Annexure A)File: ANNEXURE A_as per Order No 50.pdf | 5 Jun 2026 |
| Layout approvalFile: HPSCANNER1771.pdf | 4 Jun 2026 |
| Building plan approvalFile: HPSCANNER1771.pdf | 4 Jun 2026 |
| Building plan approvalFile: HPSCANNER1772.pdf | 4 Jun 2026 |
| Building plan approvalFile: HPSCANNER1773.pdf | 4 Jun 2026 |
| Building plan approvalFile: HPSCANNER1774.pdf | 4 Jun 2026 |
| Building plan approvalFile: HPSCANNER1775.pdf | 4 Jun 2026 |
| Building plan approvalFile: HPSCANNER1776.pdf | 4 Jun 2026 |
| Building plan approvalFile: HPSCANNER1777.pdf | 4 Jun 2026 |
| Form 2A (FY 2025-2026)File: BALAJI SIDDHI FORM 2A.pdf | 18 May 2026 |
| Withdrawal Update Form 1File: Form 1_ARCHITECT CERTIFICATE.pdf | 12 May 2026 |
| Withdrawal Update Form 2File: Form 2_ENGINEER CERTIFICATE.pdf | 12 May 2026 |
| Withdrawal Update Form 3File: Form 3_CA Certificate.pdf | 12 May 2026 |
| Withdrawal Update Form 1File: ARCHITECT CERTIFICATE_11zon.pdf | 4 Feb 2026 |
| Withdrawal Update Form 1File: Architech Certificate_Form 1_11zon.pdf | 4 Feb 2026 |
| Withdrawal Update Form 1File: Architech Certificate_Form 1_11zon.pdf | 4 Feb 2026 |
| Withdrawal Update Form 2File: ENGINEER CERTIFICATE RERA_11zon.pdf | 4 Feb 2026 |
| Withdrawal Update Form 2File: Engineers Certificate_Form 2_11zon.pdf | 4 Feb 2026 |
| Withdrawal Update Form 2File: Engineers Certificate_Form 2_11zon.pdf | 4 Feb 2026 |
| Withdrawal Update Form 3File: SHRI BALAJI SIDDHI RERA_11zon.pdf | 4 Feb 2026 |
| Withdrawal Update Form 3File: CA Certificate_Form 3_11zon.pdf | 4 Feb 2026 |
| Withdrawal Update Form 3File: CA Certificate_Form 3_11zon.pdf | 4 Feb 2026 |
| Form 2A (FY 2024-2025)File: Quality Assurance Certificate_Form 2A.pdf | 4 Feb 2026 |
| Layout approvalFile: PLAN LAYOUT_1.pdf | 24 Apr 2025 |
| Building plan approvalFile: PLAN LAYOUT_1.pdf | 24 Apr 2025 |
| Building plan approvalFile: BUILDING PLAN_1.pdf | 24 Apr 2025 |
| Building plan approvalFile: BUILDING PLAN_2.pdf | 24 Apr 2025 |
| Copy of Layout Approval (in case of layout)File: PLAN LAYOUT_1.pdf | 24 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ARCHITECT CERTIFICATE.pdf | 24 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_ENGINEERS CERTIFICATE.pdf | 24 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: PLAN LAYOUT_1.pdf | 24 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN_1.pdf | 24 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN_2.pdf | 24 Apr 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A_QUALITY ASSURANCE.pdf | 24 Apr 2025 |
| Layout approvalFile: PLAN LAYOUT_1.pdf | 3 Apr 2025 |
| Layout approvalFile: PLAN LAYOUT_2.pdf | 3 Apr 2025 |
| Building plan approvalFile: BUILDING PLAN_Doc_1.pdf | 3 Apr 2025 |
| Building plan approvalFile: BUILDING PLAN_Doc_2.pdf | 3 Apr 2025 |
| Copy of Layout Approval (in case of layout)File: PLAN LAYOUT_1.pdf | 3 Apr 2025 |
| Copy of Layout Approval (in case of layout)File: PLAN LAYOUT_2.pdf | 3 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN_Doc_1.pdf | 3 Apr 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN_Doc_2.pdf | 3 Apr 2025 |
| Layout approvalFile: Plan Layout.pdf | 24 Jan 2025 |
| Building plan approvalFile: Building Layout.pdf | 24 Jan 2025 |
| Copy of Layout Approval (in case of layout)File: Plan Layout.pdf | 24 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1_ARCHITECT CERTIFICATE.pdf | 24 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3_CA CERTIFICATE.pdf | 24 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 2_ENGINEERS CERTIFICATE.pdf | 24 Jan 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 24 Jan 2025 |
| Building Plan Approval / NA Order for plotted developmentFile: Building Layout.pdf | 24 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosure of Sold and Booked Inventory_Circular 29.pdf | 24 Jan 2025 |
| Declaration about Commencement CertificateFile: Declaration About Commencement Certificate_FORM_D_Circular 32_2021.pdf | 24 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM_5_ANNUAL REPORT_FY 2022-23.pdf | 24 Jan 2025 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM 2A_QUALITY ASSURANCE.pdf | 24 Jan 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM_5_ANNUAL REPORT_FY 2023-24.pdf | 24 Jan 2025 |
| Declaration about Commencement CertificateFile: FORM_D_Circular 32_2021.pdf | 9 Feb 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: CERTIFICATE_FORM 2A.pdf | 9 Feb 2023 |
| Disclosure of sold/ booked inventoryFile: Circular 29_Sold_Booked Inventory.pdf | 9 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5 Balaji Siddhi.pdf | 9 Feb 2023 |
| OtherFile: FORM_C_Circular 28_2021_Consent of Allottes.pdf | 9 Feb 2023 |
| Layout approvalFile: PLAN_LAYOUT_Compressed.pdf | 16 Jan 2023 |
| Building plan approvalFile: BUILDING PLAN_1.pdf | 16 Jan 2023 |
| Building plan approvalFile: BUILDING PLAN_2.pdf | 16 Jan 2023 |
| Copy of Layout Approval (in case of layout)File: PLAN_LAYOUT_Compressed.pdf | 16 Jan 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN_1.pdf | 16 Jan 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: BUILDING PLAN_2.pdf | 16 Jan 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: CERTIIFCATE_COMMENCEMENT.pdf | 16 Jan 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: CERTIFICATE_ARCHITECH_Compressed.pdf | 16 Jan 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: CERTIFICATE_ENGINEERS_Compreseed.pdf | 16 Jan 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: CERTIFICATE_SITE SUPERVISOR.pdf | 16 Jan 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: SHRI BALAJI SIDDHI_FORM3_Compressed.pdf | 16 Jan 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: form 5 Balaji Siddhi.pdf | 16 Jan 2023 |
| OtherFile: FORM_C_Circular 28_2021_Compressed.pdf | 16 Jan 2023 |
| OtherFile: FORM_D_Circular 32_2021.pdf | 16 Jan 2023 |
| Copy of the legal title reportFile: TITLE REPORT ON LETTER HEAD OF PROMOTER_page-0001.pdf | 31 Jan 2022 |
| Copy of the legal title reportFile: Legal_Title_Report_Circular 28_page-0001.pdf | 27 Jan 2022 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 2 conditions on this project's record read and explained, with the clear checks alongside
- All 96 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Balaji Siddhi on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Ambegaon Bk13,700+ in Pune
Sai Nagari Phase I
Saikedareshwar Developers LLP
SAI NAGARI Phase V
Saikedareshwar Developers LLP
Sai Nagari Phase II
Saikedareshwar Developers LLP
Sai Nagari Phase IV
Saikedareshwar Developers LLP
Sai Nagari Phase III
Saikedareshwar Developers LLP
Bella Casa - Phase 1
Kakkad Infra LLP
Builder: SHRI BALAJI SIDDHI DEVELOPERS
SHRI BALAJI SIDDHI DEVELOPERS has 1 registration on MahaRERA, including Balaji Siddhi. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Balaji Siddhi is delayed beyond 31 Oct 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Balaji Siddhi?
The registered promoter entity is SHRI BALAJI SIDDHI DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Balaji Siddhi?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Balaji Siddhi?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Balaji Siddhi?
The professionals named in the filing: Architect: Rajendra H Thite; Engineer: Satis Dnyanoba Bodare; Engineer: Mahesh Mashalkar; Engineer: Karpe Ashish; Chartered Accountant: Pawar Kulkarni & Associates; Chartered Accountant: SUNIL NIMBALKAR & ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Balaji Siddhi?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback