Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 8 other registrations and every project registered within 2 km.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
May 2027Possession promisedno revision filed
6 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 12%
127 of 186Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 88 documents Report an error

BALAJI HEIGHTS REDEVELOPMENT OF RAJENDRA NAGAR OM SAIRAM CHS LTD is a Others project by BALAJI BUILDERS AND DEVELOPERS in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800055537 on 2 Apr 2024. Possession is promised by 31 May 2027. 59 of the 186 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete.

At a glance

Project

  • NameBALAJI HEIGHTS REDEVELOPMENT OF RAJENDRA NAGAR OM SAIRAM CHS LTD
  • TypeOthers
  • Location
    • DATTAPADA ROAD
    • RAJENDRA NAGAR (OLD)
    • BORIVALI EAST
    • Borivali
    • Mumbai Suburban
    • 400066
  • Pincode400066
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P51800055537
  • ReraGenie IDRG-MH-17625

Builder

  • NameBALAJI BUILDERS AND DEVELOPERS
  • Entity typePartnership
  • PartnersGirish Ramnath Koltharkar, Bhaskar Seenu Naidu, Chetan Bhaskar Naidu, Harjas Singh Jaspreet Singh Chadha, Ambika V Gounder
  • Other registrations8 more →
  • Completed3 of 9
  • No longer live2 lapsed, de-registered or revoked

Key dates

this monthRegisteredApr 2024PromisedMay 2027

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on2 Apr 2024
  • Promised completion31 May 2027
  • Revised completionNone
  • Buildings2 building records
  • Documents filed88 files

Current status

32%59 of 186 units booked

Figures as on 4 Apr 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BALAJI HEIGHTS - A WINGNA232285893
BALAJI HEIGHTS - B WINGNA232284993

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 4 Apr 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 12%.

BALAJI HEIGHTS - A WING29%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure12%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks12%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
BALAJI HEIGHTS - B WING29%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor0%
Slabs of Super Structure11%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks11%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 4 Apr 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed139

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots139
Closed/Covered139

Land and ownership2

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,626 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on7 Aug 2025
LandownerVillageDistrict
BALAJI BUILDERS AND DEVELOPERSDahisarMumbai Suburban
Rajendra Nagar Om Sairam CHSLMagathaneMumbai Suburban

Approvals and building plan

Sanctioning authorityMCGM
Permissible FSI10764.49
Proposed, not sanctioned10,764 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKAUSHTUBH PARK, NEXT TO BHAGAVATI HOSPITAL, MANDPESHWAR ROAD, BORIVALI WEST, MUMBAI - 400103

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSHILP ASSOCIATES
EngineerCHIRAG H MAKANI
Chartered AccountantAKSHIT PAREKH & CO
PartnerRole in project
BALAJI BUILDERS AND DEVELOPERS-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 21 Feb 2024
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 31 Jan 2024
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 1 Feb 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 31 Jan 2024Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 May 2027

Documents filed88

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 88 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Architect Certificate (1).pdf4 Apr 2026
Withdrawal Update Form 2File: Engineer Certificate.pdf4 Apr 2026
Withdrawal Update Form 3File: Form 3 - Final_compressed.pdf4 Apr 2026
Form 5 (FY 2024-2025)File: Form 5.pdf1 Jan 2026
Form 3File: Form 3 - Final_compressed.pdf19 Nov 2025
Form 1File: Architect Certificate (1).pdf19 Nov 2025
Form 2File: Engineer Certificate.pdf19 Nov 2025
Disclosure of Sold and Booked InventoryFile: Table C.pdf19 Nov 2025
Form 1File: Architect Certificate for Quarter 2 From ShilpAssociates.pdf19 Nov 2025
Form 2File: Engineer Certificate for Q2.pdf19 Nov 2025
Form 3File: Form 3 - Final Q2 - Signed.pdf19 Nov 2025
Disclosure of Sold and Booked InventoryFile: Table C.pdf19 Nov 2025
Form 1File: Architect certificate for Quarter 3 for RERA.pdf19 Nov 2025
Form 2File: Engineer Certificate for Quarter 3.pdf19 Nov 2025
Form 3File: Form 3 - Final Q3 - Signed.pdf19 Nov 2025
Disclosure of Sold and Booked InventoryFile: Table C.pdf19 Nov 2025
Form 1File: Architect Certificate for Quarter 4.pdf19 Nov 2025
Form 2File: Engineer Certificate for Q4.pdf19 Nov 2025
Form 3File: Form 3_Q4_Final_compressed.pdf19 Nov 2025
Disclosure of Sold and Booked InventoryFile: Table C.pdf19 Nov 2025
Form 1File: Architect Certificate for 1st Quarter.pdf19 Nov 2025
Form 2File: Engineer Certificate Till JUNE end-2025.pdf19 Nov 2025
Form 3File: Signed RERA Form 3_compressed.pdf19 Nov 2025
Disclosure of Sold and Booked InventoryFile: Table C.pdf19 Nov 2025
Form 1File: Architect Certificate for Q2 2025 - Signed.pdf19 Nov 2025
Form 2File: Engineer Certificate for Q2 2025 - Signed.pdf19 Nov 2025
Form 3File: CA Certificate for Q2 2025 - Signed_compressed.pdf19 Nov 2025
Disclosure of Sold and Booked InventoryFile: Table C_compressed.pdf19 Nov 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate for Quarter 4.pdf5 May 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3_Q4_Final_compressed.pdf5 May 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate for Q4.pdf5 May 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate for Quarter 2 From ShilpAssociates.pdf22 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect certificate for Quarter 3 for RERA.pdf22 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Final Q2 - Signed.pdf22 Jan 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Final Q3 - Signed.pdf22 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer Certificate for Q2.pdf22 Jan 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Engineer Certificate for Quarter 3.pdf22 Jan 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architect Certificate (1).pdf9 Aug 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf9 Aug 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Final_compressed.pdf9 Aug 2024
Copy of the legal title reportFile: RERA TItle Report 20022024.pdf21 Feb 2024
Declaration about Commencement CertificateFile: Format D.pdf21 Feb 2024
Other - LegalFile: 1-7_compressed.pdf21 Feb 2024
Other - LegalFile: 8-14_compressed.pdf21 Feb 2024
Other - LegalFile: 15-19_compressed.pdf21 Feb 2024
Other - LegalFile: 20-26_compressed.pdf21 Feb 2024
Other - LegalFile: 27-33_compressed.pdf21 Feb 2024
Other - LegalFile: 34-40_compressed.pdf21 Feb 2024
Other - LegalFile: 41-46_compressed.pdf21 Feb 2024
Other - LegalFile: 47-51_compressed.pdf21 Feb 2024
Other - LegalFile: 52-55_compressed.pdf21 Feb 2024
Other - LegalFile: 1-7_compressed.pdf21 Feb 2024
Other - LegalFile: 8-14_compressed.pdf21 Feb 2024
Other - LegalFile: 15-19_compressed.pdf21 Feb 2024
Other - LegalFile: 20-27_compressed.pdf21 Feb 2024
Other - LegalFile: 28-33_compressed.pdf21 Feb 2024
Other - LegalFile: 34-38_compressed.pdf21 Feb 2024
Other - LegalFile: 39-43_compressed.pdf21 Feb 2024
Other - TechnicalFile: CC -Om Saiuram (1).pdf21 Feb 2024
Other - TechnicalFile: Annexure A.pdf21 Feb 2024
Declaration in FORM BFile: Form B Affidavit Cum Declaration by Promotor_compressed.pdf20 Feb 2024
Building plan approvalFile: Plan 6-10 .pdf1 Feb 2024
Building Plan Approval / NA Order for plotted developmentFile: Plan 6-10 .pdf1 Feb 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Girsh R Koltharkar.pdf1 Feb 2024
Building plan approvalFile: GetUserDocumentFileContent.pdf31 Jan 2024
Layout approvalFile: Only IOD_compressed.pdf31 Jan 2024
Details of encumbrances concerned to FinanceFile: 5)No encumbrance Certificate Finance .pdf31 Jan 2024
Details of encumbrances concerned to FinanceFile: 5)No encumbrance Certificate Legal.pdf31 Jan 2024
Details of encumbrances concerned to LegalFile: 5)No encumbrance Certificate Finance .pdf31 Jan 2024
Details of encumbrances concerned to LegalFile: 5)No encumbrance Certificate Legal.pdf31 Jan 2024
Copy of Layout Approval (in case of layout)File: Only IOD_compressed.pdf31 Jan 2024
Building Plan Approval / NA Order for plotted developmentFile: GetUserDocumentFileContent.pdf31 Jan 2024
Commencement Certificates / NA Order for plotted developmentFile: 8)Commencement Certificate.pdf31 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Archiect Certificate.pdf31 Jan 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: RERA Carpet Area Certificate.pdf31 Jan 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate V2.pdf31 Jan 2024
CERSAI detailsFile: Format for CERSAI.pdf31 Jan 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 for Upload.pdf31 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 1)Harjas Chadha Annexure A.pdf31 Jan 2024
Disclosure of Interest in Other Real Estate OrganizationsFile: 1)Chetan Naidu Annexure A.pdf31 Jan 2024

How this compares with Mumbai Suburban

32%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep BALAJI HEIGHTS REDEVELOPMENT OF RAJENDRA NAG on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near RAJENDRA NAGAR (OLD), BORIVALI EAST6,700+ in Mumbai Suburban

2 kmBALAJI HEIGHTS REDEVELOPCompleted 131Lapsed / revoked 73Other 178Dot size: filed unitsN

Filed coordinates, straight-line distance. 382 registered projects within 2 km.

Builder: BALAJI BUILDERS AND DEVELOPERS

BALAJI BUILDERS AND DEVELOPERS has 9 registrations on MahaRERA, including SURYA TOWER 1 and SAI CHINTAMANI. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if BALAJI HEIGHTS REDEVELOPMENT OF RAJENDRA NAGAR OM SAIRAM CHS LTD is delayed beyond 31 May 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BALAJI HEIGHTS REDEVELOPMENT OF RAJENDRA NAGAR OM SAIRAM CHS LTD?

The registered promoter entity is BALAJI BUILDERS AND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BALAJI HEIGHTS REDEVELOPMENT OF RAJENDRA NAGAR OM SAIRAM CHS LTD?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for BALAJI HEIGHTS REDEVELOPMENT OF RAJENDRA NAGAR OM SAIRAM CHS LTD?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BALAJI HEIGHTS REDEVELOPMENT OF RAJENDRA NAGAR OM SAIRAM CHS LTD?

The professionals named in the filing: Architect: SHILP ASSOCIATES; Engineer: CHIRAG H MAKANI; Chartered Accountant: AKSHIT PAREKH & CO. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BALAJI HEIGHTS REDEVELOPMENT OF RAJENDRA NAGAR OM SAIRAM CHS LTD?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BALAJI HEIGHTS REDEVELOPMENT OF RAJENDRA NAGAR OM SAIRAM CHS LTD. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BALAJI HEIGHTS REDEVELOPMENT OF RAJENDRA NAG to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.