Home / Browse projects / Dakshina Kannada, Karnataka / BAITHUL HAMD

Registration approved No litigation declared Residential/Group Housing project

BAITHUL HAMD

By HANNATH BEEVI

RG-KA-04911 · RERA PRM/KA/RERA/1257/334/PR/231123/006429

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Oct 2020Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 98 documents Report an error

BAITHUL HAMD is a Residential/Group Housing project by HANNATH BEEVI in Dakshina Kannada, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1257/334/PR/231123/006429 on 23 Nov 2023. Possession is promised by 13 Oct 2020.

At a glance

Project

  • NameBAITHUL HAMD
  • TypeResidential/Group Housing
  • Location
    • Mangalore
    • Dakshina Kannada
    • 575022
  • Pincode575022
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1257/334/PR/231123/006429
  • ReraGenie IDRG-KA-04911

Builder

  • NameHANNATH BEEVI
  • Entity typeProprietorship
  • Authorized SignatoryHANNATH BEEVI

Key dates

Registered
23 Nov 2023
Promised
13 Oct 2020

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on23 Nov 2023
  • Promised completion13 Oct 2020
  • Revised completionNone
  • Buildings1 building record
  • Documents filed98 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
BAITUL HAMD---12012

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Upto Plinth Level-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
Retaining wall (All types)Not applicable
RCC or MS Framed structure-
Masonry Construction-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Painting-
Fire prevention and fire fighting fitting and fixture with networkNot applicable
Weather Proof work(tile,concrete)Not applicable
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work-
Internal and External work including landscapes as per sanctioned drawingsNot applicable

Progress on shared amenities40

Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Sewage and Drainage SystemNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterNoNot applicable
Energy managementNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Solid waste management and disposalYes-
Emergency Evacuation servicesNoNot applicable
Internal Roads & FootpathsNoNot applicable
Electricity supply transformer and substationNoNot applicable
Storm water drainsNoNot applicable
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)NoNot applicable
Parks & Tree plantingNoNot applicable
Street LightingNoNot applicable
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityNoNot applicable
Indoor Sports facilityNoNot applicable
Swimming PoolNoNot applicable
GymNoNot applicable
ParksNoNot applicable
Power BackupNoNot applicable
Piped GasYes-
Water and SanitationYes-
Air ConditioningNoNot applicable
StaircasesYes-
LiftsYes-
Corridor/LobbiesYes-
Fire escapesNoNot applicable
Common entrance and exit for the building/common portico/foyer/verandahNoNot applicable
BasementYes-
TerraceNoNot applicable
Outer WallNoNot applicable
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable
Common storage spacesNoNot applicable

Land and ownership2

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area809 sq m
Named landowners2
LandownerVillageDistrict
ABDUL MUTHALIB B R & OTHERS--
ABDUL MUTHALIB B R & OTHERS--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 2.55 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 2.50 cr-
On-site expenditure-Consultants FeesRs 5.00 lakh-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectFAIZAL AHMED
EngineerFAIZAL AHMED
Chartered AccountantM. VENKATAKRISHNA

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed98

As listed on the registration, under the names the promoter filed them with; the newest 80 of 98 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1257/334/PR/231123/006429 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
RTC, survey 321/3-
Mutation, survey 321/3-
Encumbrance Certificate, survey 321/3-
Conversion/Alienation Order, survey 321/3-
Sale/Title/Gift Deed, survey 321/3-
JDA, survey 321/3-
Khatha, survey 321/3-
RTC, survey 323/6-
Mutation, survey 323/6-
Encumbrance Certificate, survey 323/6-
Conversion/Alienation Order, survey 323/6-
Sale/Title/Gift Deed, survey 323/6-
JDA, survey 323/6-
Khatha, survey 323/6-
Registration CertificateFile: Trade Licence.pdf-
Certificate issued by CA Form 1File: form 1 ca report final_compressed.pdf-
Certificate issued by Architect Form 2File: Architect Certificate.pdf-
Certificate issued by Engineer Form 3File: Engineer Certificate.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: LITTIGATION AFFIDAVIT.pdf-
Certificate from Chartered AccountFile: form 1 ca report final_compressed.pdf-
Balance Sheet 2022 - 2023File: balance sheet 2023.pdf-
Balance Sheet 2021 - 2022File: balancesheet 2022.pdf-
Balance Sheet 2020 - 2021File: balancesheet 21.pdf-
Audited Profit and Loss Statement 2022 - 2023File: P&L 2023.pdf-
Audited Profit and Loss Statement 2021 - 2022File: P&L 2022.pdf-
Audited Profit and Loss Statement 2020 - 2021File: P&L 21.pdf-
Income Tax Return Acknowledgement 2022 - 2023File: ITR 23-24.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: ITR 22-23.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: ITR 2021-22.pdf-
Building licence old and new-
Sanction Plan-
Single Layout-
Sanction Plan-
Sanction Plan-
Sanction Plan-
specification-
Single Layout-
Single Layout-
Stability Certificate-
Search Report_compressed-
JDA-
Conversion Order-
Conversion Order-
title deed 2 Partition Deed-
proforma AOS-
proforma allotment letter-
broucher-
RERA FORM B-
NOTARIZED AFFIDAVIT-
JOINT AFFIDAVIT-
Mescom NOC-
Water NOC-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
Unnamed document-
guidance value Kotekar Village-
village map]-
Occupancy Certificate-
Affidavith for sold unsold units-
Architect Certificate for completion-
Engineer Certificate for completion-
LOWER LEVEL (1)-
GROUND FLOOR-
FIRST FLOOR (2)-

How this compares with Dakshina Kannada

30%of Dakshina Kannada projects moved their completion datethis one has not
0%of Dakshina Kannada registrations are shown as withdrawn or revokedthis one is not

Computed across the 620+ Dakshina Kannada projects on ReraGenie, from their own filings.

Keep BAITHUL HAMD on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Dakshina Kannada620+ in Dakshina Kannada

2 kmBAITHUL HAMDOther 6Dot size: filed unitsN

Filed coordinates, straight-line distance. 6 registered projects within 2 km.

Builder: HANNATH BEEVI

HANNATH BEEVI has 1 registration on RERA Karnataka, including BAITHUL HAMD. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Dakshina Kannada district page.

Frequently asked questions

What are my rights if BAITHUL HAMD is delayed beyond 13 Oct 2020?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of BAITHUL HAMD?

The registered promoter entity is HANNATH BEEVI, a proprietorship as per the filing. Neither this filing nor this promoter's other RERA Karnataka registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in BAITHUL HAMD?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at BAITHUL HAMD?

The professionals named in the filing: Architect: FAIZAL AHMED; Engineer: FAIZAL AHMED; Chartered Accountant: M. VENKATAKRISHNA. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BAITHUL HAMD?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BAITHUL HAMD. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BAITHUL HAMD to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.