ReraGenieLog inGet a buyer report

Home / Browse projects / Pune, Maharashtra / BA Swadesha- Phase 2

Registration lapsed Litigation declared Residential / Group Housing project

BA Swadesha- Phase 2

By Spectrum Realty

RG-MH-70198 · RERA P52100047275 · Last updated on MahaRERA portal: 25 Mar 2025

Source: official MahaRERA filing

Red flags

  • Registration lapsed
  • Possession 10 months past the filed date
  • Litigation declared, 4 cases
  • 1 complaint at MahaRERA

Clear

  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

4 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2025Possession promised10 months past this date
5 of 11Construction stages donefurthest along: Internal walls, 50%
1Complaints at MahaRERAon this registration
Jump to the 54 documents Report an error

BA Swadesha- Phase 2 is a Residential / Group Housing project by Spectrum Realty in Pune, Maharashtra, registered with MahaRERA as P52100047275 on 17 Oct 2022. Possession was promised by 25 Dec 2025 and is now 10 months past that date. 1 complaint is on record with the regulator.

At a glance

Project

  • NameBA Swadesha- Phase 2
  • TypeResidential / Group Housing
  • Location
    • Moshi Borhadewadi
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100047275
  • ReraGenie IDRG-MH-70198

Builder

  • NameSpectrum Realty
  • Entity typePartnership
  • PartnerPankaj Lakhamshi Patel
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

10 months past promisethis monthRegisteredOct 2022PromisedDec 2025

Key facts

Registration and timeline

  • StatusRegistration lapsed
  • Registered on17 Oct 2022
  • Promised completion25 Dec 2025
  • Revised completionNone
  • Buildings1 building record
  • Documents filed54 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
CNA1715000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 25 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

5 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 50%.

C: 55% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)0%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises30%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.10%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 25 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes30%
Storm Water DrainsYes30%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes35%
Treatment And Disposal Of Sewage And Sullage WaterYes90%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes50%
Aggregate area of recreational Open SpaceYes40%
Open ParkingYes0%

Parking filed148

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots148
Closed/Covered131
Open Space17

Land and ownership2

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area3,225 sq m
Land owned byThe promoter, with other names on the file
Named landowners2
LandownerVillageDistrict
Tukaram SasteMoshiPune
MaheshMoshiPune

Approvals and building plan

Sanctioning authorityPCMC
Permissible FSI11449.17
Proposed, not sanctioned11,449 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSmall Industries Branch Pune

Certifying professionals and partners1

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
Chartered AccountantA S Jinturkar & Co.
PartnerRole in project
Spectrum Realty-

Litigation declared4

CaseCourtStatus
1542/2014K M JAYSINGANIAmended Plaint
721/2017Y L MESHRAMExh five Argument
1542/2014Smt. S. V. PhulbandheOngoing
7385/2023IN THE HIGH COURT OF JUDICATURE AT BOMBAYOngoing

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC12600065Abhijit GiteSpectrum Realty05/01/2026

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 8 Aug 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 29 Sep 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 29 Sep 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 6 Jun 2023Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed54

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Disclosure of sold/ booked inventoryFile: Information of Sold Inventory Swadesha.pdf25 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - B A Swadesha-Phase II-Q3-2024-2025.pdf8 Feb 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - B A Swadesha-Phase II-Q3-2024-2025.pdf8 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - B A Swadesha-Phase II-Q3-2024-2025.pdf5 Feb 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - B A Swadesha-Phase II-Q1-2024-2025.pdf5 Dec 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - B A Swadesha-Phase II-Q2-2024-2025.pdf5 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - B A Swadesha-Phase II-Q1-2024-2025.pdf5 Dec 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - B A Swadesha-Phase II-Q2-2024-2025_compressed.pdf5 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - B A Swadesha-Phase II-Q1-2024-2025.pdf5 Dec 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - B A Swadesha-Phase II-Q2-2024-2025.pdf5 Dec 2024
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Spectrum Realty - Phase 2 - 2023-24.pdf4 Nov 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: 22 23.pdf3 Jul 2024
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 23 24.pdf3 Jul 2024
Disclosure of sold/ booked inventoryFile: Spectrum Realty.pdf14 Jun 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - B A Swadesha-Phase II-Q3-2023-2024.pdf22 Feb 2024
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - B A Swadesha-Phase II-Q3-2023-2024.pdf22 Feb 2024
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - B A Swadesha-Phase II-Q3-2023-2024.pdf22 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - B A Swadesha-Phase II-Q3-2023-2024.pdf5 Feb 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - B A Swadesha-Phase II-Q2-2023-2024.pdf4 Nov 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - B A Swadesha-Phase II-Q2-2023-2024.pdf4 Nov 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - B A Swadesha-Phase II-Q2-2023-2024.pdf4 Nov 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - B A Swadesha-Phase II-Q1-2023-2024.pdf19 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - B A Swadesha-Phase II-Q1-2023-2024.pdf19 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - B A Swadesha-Phase II-Q1-2023-2024_compressed.pdf19 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Spectrum Realty - B A Swadesha - Phase 2 - FY-2022-23.pdf5 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - B A Swadesha-Phase II-Q4-2022-2023.pdf5 Jul 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - B A Swadesha-Phase II-Q4-2022-2023_compressed.pdf5 Jul 2023
Commencement Certificates / NA Order for plotted developmentFile: Plinth certificate_C Bldg Swadesha (2).pdf6 Jun 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - B A Swadesha-Phase II-Q4-2022-2023.pdf29 Apr 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Format A - Spectrum Realty.pdf6 Oct 2022
Layout approvalFile: IOD- BA Swadesha 2021.pdf29 Sep 2022
Copy of Layout Approval (in case of layout)File: IOD- BA Swadesha 2021.pdf29 Sep 2022
CERSAI detailsFile: Spectrum Realty - Asset Based.pdf29 Sep 2022
Proforma of Allotment letterFile: BA Swadesha Phase 2- Flat Agreement.pdf29 Sep 2022
Deviation Report with respect to model copy of AgreementFile: Deviation Report -compressed.pdf29 Sep 2022
Proforma of Allotment letterFile: BA Swadesha Phase 2-Flat Agreement.pdf26 Aug 2022
Proforma of Allotment letterFile: BA Swadesha Phase 2-Allotment letter.pdf26 Aug 2022
Deviation Report with respect to Allotment letterFile: BA Swadesha Phase 2 Deviation to Allotment letter.pdf26 Aug 2022
Deviation Report with respect to model copy of AgreementFile: BA Swadesha Phase 2 Deviation to Flat Agreement.pdf26 Aug 2022
Declaration about Commencement CertificateFile: Declaration about CC.pdf17 Aug 2022
Copy of the legal title reportFile: Legel title Report.pdf8 Aug 2022
CERSAI detailsFile: CERSAI Report.pdf1 Aug 2022
Layout approvalFile: layout plan.pdf28 Jul 2022
Building plan approvalFile: building plan.pdf28 Jul 2022
PAN CardFile: Spectrum Realty- Pan card.pdf28 Jul 2022
Details of encumbrances concerned to FinanceFile: Encumbrance Letter 231.pdf28 Jul 2022
Details of encumbrances concerned to LegalFile: Encumbrance Letter 231.pdf28 Jul 2022
Copy of Layout Approval (in case of layout)File: layout plan.pdf28 Jul 2022
Building Plan Approval / NA Order for plotted developmentFile: building plan.pdf28 Jul 2022
Commencement Certificates / NA Order for plotted developmentFile: Spectrum Realty - CC.pdf28 Jul 2022
Declaration in FORM BFile: B Form 231.pdf28 Jul 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 01- BA Swadesha phase -02.pdf28 Jul 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: SWADESHA PHASE-2- FORM-2-05-07-2022.pdf28 Jul 2022
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - Swadesha Phase 2.pdf28 Jul 2022

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
SwarajMoshi Borhadewadi622CompletedJun 2016Late, Oct 2016

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is among them

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep BA Swadesha- Phase 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Moshi Borhadewadi13,700+ in Pune

2 kmBA Swadesha- Phase 2Completed 70Lapsed / revoked 40Other 72Dot size: filed unitsN

Filed coordinates, straight-line distance. 182 registered projects within 2 km.

Builder: Spectrum Realty

Spectrum Realty has 3 registrations on MahaRERA, including BA Swadesha- Phase 1 and BA Swadesha- Phase 2. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What does it mean that BA Swadesha- Phase 2 shows as registration lapsed on MahaRERA?

A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.

What are my rights if BA Swadesha- Phase 2 is delayed beyond 25 Dec 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BA Swadesha- Phase 2?

The registered promoter entity is Spectrum Realty, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BA Swadesha- Phase 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against BA Swadesha- Phase 2?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for BA Swadesha- Phase 2?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BA Swadesha- Phase 2?

The professionals named in the filing: Chartered Accountant: A S Jinturkar & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BA Swadesha- Phase 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BA Swadesha- Phase 2. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BA Swadesha- Phase 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.