Home / Browse projects / Pune, Maharashtra / BA Swadesha- Phase 1

Completed Litigation declared Residential / Group Housing project

BA Swadesha- Phase 1

By Spectrum Realty

RG-MH-15832 · RERA P52100024275 · Last updated on MahaRERA portal: 4 Nov 2024

Source: official MahaRERA filing

Red flags

  • Litigation declared, 6 cases
  • 1 complaint at MahaRERA

Clear

  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.
Dec 2023Possession promisedregistration recorded completed
12 of 33Construction stages doneacross 3 buildings; furthest along: Podiums (if any), 90%
1Complaints at MahaRERAon this registration
Jump to the 91 documents Report an error

BA Swadesha- Phase 1 is a Residential / Group Housing project by Spectrum Realty in Pune, Maharashtra, registered with MahaRERA as P52100024275 on 30 Jan 2020. The registration is recorded completed; possession was promised by 30 Dec 2023. 1 complaint is on record with the regulator.

At a glance

Project

  • NameBA Swadesha- Phase 1
  • TypeResidential / Group Housing
  • Location
    • Moshi Borhadewadi
    • Pimpri Chinchawad (M Corp.)
    • Haveli
    • Pune
    • 412105
  • Pincode412105
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52100024275
  • ReraGenie IDRG-MH-15832

Builder

  • NameSpectrum Realty
  • Entity typePartnership
  • PartnerPankaj Lakhamshi Patel
  • Other registrations2 more →
  • Completed1 of 3
  • No longer live1 lapsed, de-registered or revoked
  • Declared earlier projects1 →

Key dates

this monthRegisteredJan 2020PromisedDec 2023Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on30 Jan 2020
  • Promised completion30 Dec 2023
  • Revised completionNone
  • Buildings3 building records
  • Documents filed91 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ENA150000
FNA150000
GNA150000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building3

As on 4 Nov 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

12 of 33 construction stages are filed complete across 3 buildings. The stage furthest along is Podiums (if any), at 90%.

E69%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)90%
Plinth100%
Stilt Floor80%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises75%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks10%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.90%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.15%
F72%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)80%
Plinth100%
Stilt Floor80%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises65%
Sanitary Fittings within the flats / premises10%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks68%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.78%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.13%
G73%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)80%
Plinth100%
Stilt Floor80%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises63%
Sanitary Fittings within the flats / premises15%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks73%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.76%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.15%

Progress on shared amenities15

As on 4 Nov 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes0%
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingYes0%
Street LightingYes0%
Community BuildingsYes0%
Treatment And Disposal Of Sewage And Sullage WaterYes0%
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntYes0%
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceYes0%
Open ParkingYes0%

Parking filed276

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots276
Closed/Covered153
Open Space123
BuildingClosed/CoveredOpen SpaceTotal
E504292
F494392
G543892

Land and ownership3

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area8,398 sq m
Land owned byThe promoter, with other names on the file
Named landowners3
LandownerVillageDistrict
Nanda Sakharam SastePimpri Chinchawad (M Corp.)Pune
Mahesh Sakharam SastePimpri Chinchawad (M Corp.)Pune
Sonali Sakharam SastePimpri Chinchawad (M Corp.)Pune

Approvals and building plan

Permissible FSI13506.72
Proposed, not sanctioned12,757 sq m
Buildings approved3
Buildings sanctioned3

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchSmall Industries Branch Pune

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectAr Shashank Phadke
EngineerSandesh Umardanad
Chartered AccountantRashmi Porwal
PartnerRole in project
Spectrum Realty-

Litigation declared6

CaseCourtStatus
S C S 1542/14/2014Smt P N KulkarniAdditional WS to be given by defendant
Spl C S 721/17/2017N S PuriIssues to be framed by court and evidence to be given by plentiff
7385/2023High Court of Judicature at BombayPending
S C S 1542/14/2014Smt P N KulkarniAdditional WS to be given by defendant
Spl C S 721/17/2017N S PuriIssues to be framed by court and evidence to be given by plentiff
7385/2023High Court of Judicature at BombayPending

Complaints filed with MahaRERA1

Case no.ComplainantRespondentFiled
CC005000000259224AVINASH VISHNU WAGHMAREPANKAJ LAKHAMSI PATEL29/07/2023

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 9 Jan 2020
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 2 Jun 2022
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 2 Jun 2022
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 9 Jan 2020Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateOn the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    uploaded 27 Sep 2023

Documents filed91

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 91 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5 - Spectrum Realty Phase 1 - 2023-24.pdf4 Nov 2024
Status of Formation of Legal Entity (Society/Co Op etc.)File: BA Swadesha Phase 1 Society Registration Certificate.pdf22 Oct 2024
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - B A Swadesha-Phase I - Q1-2023-2024.pdf19 Oct 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - B A Swadesha-Phase I - Q1-2023-2024.pdf19 Oct 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - B A Swadesha-Phase I - Q1-2023-2024_compressed.pdf19 Oct 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: Form 5 - Spectrum Realty - B A Swadesha - Phase I - FY-2022-23.pdf5 Oct 2023
Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: GetUserDocumentFileContent (1).pdf27 Sep 2023
Architect’s Certificate on Completion of Project (Form 4)File: Spectrum - Form 4.pdf27 Sep 2023
Declaration about Commencement CertificateFile: Spectrum - Completion Certificate.pdf12 Sep 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 - B A Swadesha-Phase I - Q4-2022-2023.pdf8 Jun 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 - B A Swadesha-Phase I - Q4-2022-2023_compressed.pdf8 Jun 2023
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: 1 Engineers Certificate on Quality Assurance - Phase I - (Form 2A FY 2021-22).pdf25 May 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 - B A Swadesha-Phase I - Q4-2022-2023.pdf29 Apr 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 1 Form 1 - B A Swadesha - Q1-2020-2021-07082020.pdf31 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 2 Form 1 - B A Swadesha - Q2-2020-2021-12112020.pdf31 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 3 Form 1 - B A Swadesha - Q3-2020-2021-18012021.pdf31 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 4 Form 1 - B A Swadesha - Q4-2020-202107042021.pdf31 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 5 Form 1 - B A Swadesha - Q1-2021-2022-12072021.pdf31 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 6 Form 1 - B A Swadesha - Q2-2021-2022-12102021.pdf31 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 7 Form 1 - B A Swadesha - Q3-2021-2022-05012022.pdf31 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 8 Form 1 - B A Swadesha - Q4-2021-2022-15042022.pdf31 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 9 Form 1 - B A Swadesha - Q1-2022-2023-16072022.pdf31 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 10 Form 1 - B A Swadesha - Q2-2022-2023-17102022.pdf31 Mar 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: 11 Form 1 - B A Swadesha - Q3-2022-2023-04012023.pdf31 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 2 Form 2 - B A Swadesha - Q1-2020-2021.pdf31 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 3 Form 2 - B A Swadesha - Q2-2020-2021.pdf31 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 4 Form 2 - B A Swadesha - Q3-2020-2021.pdf31 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 5 Form 2 - B A Swadesha - Q4-2020-2021.pdf31 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 6 Form 2 - B A Swadesha - Q1-2021-2022.pdf31 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 7 Form 2 - B A Swadesha - Q2-2021-2022.pdf31 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 8 Form 2 - B A Swadesha - Q3-2021-2022.pdf31 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 9 Form 2 - B A Swadesha - Q4-2021-2022.pdf31 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 10 Form 2 - B A Swadesha - Q1-2022-2023.pdf31 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 11 Form 2 - B A Swadesha - Q2-2022-2023.pdf31 Mar 2023
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: 12 Form 2 - B A Swadesha - Q3-2022-2023.pdf31 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 2 Form 3 - B A Swadesha -Q1-2020-2021-27052021.pdf31 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 3 Form 3 - B A Swadesha -Q2-2020-2021-27052021.pdf31 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 4 Form 3 - B A Swadesha -Q3-2020-2021-27052021.pdf31 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 5 Form 3 - B A Swadesha -Q4-2020-2021-08092021.pdf31 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 6 Form 3 - B A Swadesha - Q1-2021-2022-08092021.pdf31 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 7 Form 3 - B A Swadesha - Q2-2021-2022-27112021.pdf31 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 8 Form 3 - B A Swadesha - Q3-2021-2022-.pdf31 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 9 Form 3 - B A Swadesha - Q4-2021-2022-25052022.pdf31 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 10 Form 3 - B A Swadesha - Q1-2022-2023 -19112022.pdf31 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 11 Form 3 - B A Swadesha - Q2-2022-2023-19112022.pdf31 Mar 2023
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: 12 Form 3 - B A Swadesha - Q3-2022-2023-01022023.pdf31 Mar 2023
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: Spectrum Realty - B A Swadesha - FY-2021-22.pdf20 Jan 2023
Layout approvalFile: Layout plan.pdf2 Jun 2022
Building plan approvalFile: G Building1.pdf2 Jun 2022
Building plan approvalFile: G Building 2.pdf2 Jun 2022
Building plan approvalFile: G Building3.pdf2 Jun 2022
Building plan approvalFile: G Building4.pdf2 Jun 2022
Copy of Layout Approval (in case of layout)File: Layout plan.pdf2 Jun 2022
Building Plan Approval / NA Order for plotted developmentFile: G Building1.pdf2 Jun 2022
Building Plan Approval / NA Order for plotted developmentFile: G Building 2.pdf2 Jun 2022
Building Plan Approval / NA Order for plotted developmentFile: G Building3.pdf2 Jun 2022
Building Plan Approval / NA Order for plotted developmentFile: G Building4.pdf2 Jun 2022
Details of encumbrancesFile: B A Swadesha Encumbrance Letter.pdf28 May 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: Form 5 - Spectrum Realty.pdf12 Mar 2022
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Quality Assurance Certificate- Swadesha 1.pdf1 Nov 2021
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: Form 5 Spectrum Realty.pdf13 Jul 2021
Proforma of Allotment letterFile: Bhandari Borhadewadi Gat 231 Flat Agr - RERA 2020.pdf21 Jan 2020
Layout approvalFile: Master Plan_compressed.pdf9 Jan 2020
Building plan approvalFile: E-Floor Plans_compressed.pdf9 Jan 2020
Building plan approvalFile: E-Floor Plans 02_compressed.pdf9 Jan 2020
Building plan approvalFile: E-8th Floor_compressed.pdf9 Jan 2020
Building plan approvalFile: F-Floor Plans 01_compressed.pdf9 Jan 2020
Building plan approvalFile: F-Floor Plans 02_compressed.pdf9 Jan 2020
Building plan approvalFile: F-8th Floor_compressed.pdf9 Jan 2020
Building plan approvalFile: G-Floor Plans 01_compressed.pdf9 Jan 2020
Building plan approvalFile: G-Floor Plans 02_compressed.pdf9 Jan 2020
Building plan approvalFile: G-Floor Plans 03_compressed.pdf9 Jan 2020
Building plan approvalFile: Cluhouse 01_compressed.pdf9 Jan 2020
PAN CardFile: Spectrum Realty.pdf9 Jan 2020
Copy of the legal title reportFile: 231 Search Title Report - 2020_compressed (1)_compressed (1).pdf9 Jan 2020
Details of encumbrancesFile: Declaration.pdf9 Jan 2020
Copy of Layout Approval (in case of layout)File: Master Plan_compressed.pdf9 Jan 2020
Building Plan Approval / NA Order for plotted developmentFile: E-Floor Plans_compressed.pdf9 Jan 2020
Building Plan Approval / NA Order for plotted developmentFile: E-Floor Plans 02_compressed.pdf9 Jan 2020
Building Plan Approval / NA Order for plotted developmentFile: E-8th Floor_compressed.pdf9 Jan 2020

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered late
ProjectLocationFlatsStatusPromisedDelivered
SwarajMoshi Borhadewadi622CompletedJun 2016Late, Oct 2016

How this compares with Pune

26%of Pune projects moved their completion datethis one has not
26%of Pune registrations have lapsed or been cancelledthis one is completed

Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.

Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep BA Swadesha- Phase 1 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near Moshi Borhadewadi13,700+ in Pune

2 kmBA Swadesha- Phase 1Completed 71Lapsed / revoked 41Other 72Dot size: filed unitsN

Filed coordinates, straight-line distance. 184 registered projects within 2 km.

Builder: Spectrum Realty

Spectrum Realty has 3 registrations on MahaRERA, including BA Swadesha- Phase 1 and BA Swadesha- Phase 2. Its filings disclose 1 earlier MahaRERA project: declares 0 of 1 past projects completed on time. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Pune district page.

Frequently asked questions

What are my rights if BA Swadesha- Phase 1 is delayed beyond 30 Dec 2023?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of BA Swadesha- Phase 1?

The registered promoter entity is Spectrum Realty, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in BA Swadesha- Phase 1?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How do I read the complaint cases filed against BA Swadesha- Phase 1?

Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.

How current is the construction progress shown for BA Swadesha- Phase 1?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at BA Swadesha- Phase 1?

The professionals named in the filing: Architect: Ar Shashank Phadke; Engineer: Sandesh Umardanad; Chartered Accountant: Rashmi Porwal. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in BA Swadesha- Phase 1?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About BA Swadesha- Phase 1. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save BA Swadesha- Phase 1 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.