ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Urban, Karnataka / Azur Phase 2

Registration approved Litigation declared Residential/Group Housing project

Azur Phase 2

By Lodha Developers Limited

RG-KA-64309 · RERA PRM/KA/RERA/1251/310/PR/200925/008110 · Last updated on RERA Karnataka portal: 14 Oct 2026

Source: official RERA Karnataka filing

Red flags

  • Litigation declared

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2030Possession promisedno revision filed
3 of 18Construction stages donefurthest along: RCC or MS Framed structure, 25%
29 of 214Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 159 documents Report an error

Azur Phase 2 is a Residential/Group Housing project by Lodha Developers Limited in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/200925/008110 on 20 Sep 2025. Possession is promised by 31 Dec 2030. 185 of the 214 units on this registration are recorded sold or booked, and 3 of 18 construction stages are filed complete.

At a glance

Project

  • NameAzur Phase 2
  • TypeResidential/Group Housing
  • Location
    • Bengaluru South
    • Bengaluru Urban
    • 560068
  • Pincode560068
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/310/PR/200925/008110
  • ReraGenie IDRG-KA-64309

Builder

  • NameLodha Developers Limited
  • Entity typeCompany
  • CINU45200MH1995PLC093041
  • GSTIN29AAACL1490J1ZC
  • Authorized SignatorySamrat Das
  • CeoRajendra Joshi
  • DirectorsAbhishek Mangalprabhat Lodha, Rajendra Narpatmal Lodha, Mukund Manohar Chitale, Rajeev Bakshi, Harita Gupta, Rajinder Pal Singh, Ashwani Kumar, LEE ANTHONY POLISANO, Shaishav Pankaj Dharia, Sushil Modi
  • Project HeadArun Rao
  • Other registrations6 more →
  • Declared earlier projects6 →

Key dates

this monthRegisteredSep 2025PromisedDec 2030

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on20 Sep 2025
  • Promised completion31 Dec 2030
  • Revised completionNone
  • Buildings2 building records
  • Documents filed159 files

Current status

86%185 of 214 units booked
61.2%Of the estimated cost spent so far

Figures as on 14 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER- A---1220122
TOWER- E---92092

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 14 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

3 of 18 construction stages are filed complete. The stage furthest along is RCC or MS Framed structure, at 25%.

Building: 18% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Upto Plinth Level100%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)0%
Retaining wall (All types)0%
RCC or MS Framed structure25%
Masonry Construction8%
Plastering inside , outside & Ceiling0%
Joinery: Doors, Windows, Ventilators etc0%
Basic work of Water supply, Sanitary and Electrification0%
Dadoing, Skirting, Flooring, Tiles work (All types)0%
Railing and Grill fixing0%
Electrification, Water supply and Sanitary Finishing0%
Painting0%
Fire prevention and fire fighting fitting and fixture with network0%
Weather Proof work(tile,concrete)0%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work0%
Internal and External work including landscapes as per sanctioned drawings0%

Progress on shared amenities40

As on 14 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes0%
Sewage and Drainage SystemYes0%
Water conservation/rain water harvesting/recharge of ground waterYes0%
Energy managementYes0%
Fire protection and fire safety requirementsYes0%
Solid waste management and disposalYes0%
Emergency Evacuation servicesYes0%
Internal Roads & FootpathsYes0%
Electricity supply transformer and substationYes0%
Storm water drainsYes0%
Use of renewable energyYes0%
Sewage Treatment Plant (STP)Yes0%
Parks & Tree plantingYes0%
Street LightingYes0%
ElectricityYes0%
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes0%
Club HouseYes0%
Community HallYes0%
Outdoor Sports facilityYes0%
Indoor Sports facilityYes0%
Swimming PoolYes0%
GymYes0%
ParksYes0%
Power BackupYes0%
Piped GasNoNot applicable
Water and SanitationYes0%
Air ConditioningNoNot applicable
StaircasesYes13%
LiftsYes13%
Corridor/LobbiesYes13%
Fire escapesYes13%
Common entrance and exit for the building/common portico/foyer/verandahYes0%
BasementYes50%
TerraceYes0%
Outer WallYes13%
Open parking areasNoNot applicable
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyYes0%
Common storage spacesNoNot applicable

Land and ownership2

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area4,943 sq m
Named landowners2
LandownerVillageDistrict
M/s. Suadela Constructions Pvt. Ltd--
M/s. Suadela Constructions Pvt. Ltd--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 362.14 cr
Cost incurredRs 221.67 cr
Spent of the estimate61.21%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 253.15 crRs 136.31 cr
On-site expenditure-Salaries of workersRs 108.99 crRs 85.35 cr

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectKiran Kempaiah
EngineerB E Pruthviraja
Chartered AccountantCHIRAG SARVAIYA & CO

Litigation declaredYes

The promoter declares litigation on this registration. The case records are in the filed documents.

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed159

As listed on the registration, under the names the promoter filed them with; the newest 80 of 159 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/200925/008110 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form -4 -A and E Sept 26 For RERA.pdf14 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form 5 Architect's Certificate Azur Tower AE_Q2 26-27.pdf14 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form - 6 Engineer Azur A & E Sep 26.pdf14 Oct 2026
Q2 2026-27 Water supply and sewage board14 Oct 2026
Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres)14 Oct 2026
Q2 2026-27 KSPCB- MOEF (Above 50 Acres)14 Oct 2026
Q2 2026-27 KPTCL- BESCOM14 Oct 2026
Q2 2026-27 Fire and Safety14 Oct 2026
Q2 2026-27 Airport Authority of India14 Oct 2026
Q2 2026-27 BSNL/Telecommunication Department14 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form -4 -A and E June 26 For RERA.pdf14 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: 02-Form - 5 Architect's Certificate Azur Tower A&E_Q1(FY26-27).pdf14 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form - 6 Engineer Azur A & E Q1_25-26.pdf14 Jul 2026
Q1 2026-27 Water supply and sewage board14 Jul 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)14 Jul 2026
Q1 2026-27 KSPCB- MOEF (Above 50 Acres)14 Jul 2026
Q1 2026-27 KPTCL- BESCOM14 Jul 2026
Q1 2026-27 Fire and Safety14 Jul 2026
Q1 2026-27 Airport Authority of India14 Jul 2026
Q1 2026-27 BSNL/Telecommunication Department14 Jul 2026
Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form -4 Chartered Accountant A and E Mar 26.pdf14 Apr 2026
Q4 2025-26 Form-5 Certificate issued by ArchitectFile: 04- Architect AZUR TOWER AE.pdf14 Apr 2026
Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form - 6 Engineer Azur A & E Q4_25-26.pdf14 Apr 2026
Q4 2025-26 Water supply and sewage board14 Apr 2026
Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres)14 Apr 2026
Q4 2025-26 KSPCB- MOEF (Above 50 Acres)14 Apr 2026
Q4 2025-26 KPTCL- BESCOM14 Apr 2026
Q4 2025-26 Fire and Safety14 Apr 2026
Q4 2025-26 Airport Authority of India14 Apr 2026
Q4 2025-26 BSNL/Telecommunication Department14 Apr 2026
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form -4 Chartered Accountant A and E Dec 25.pdf15 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5 Architect Certificate A & E.pdf15 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form - 6 Engineer Azur A & E Q3_25-26.pdf15 Jan 2026
Q3 2025-26 Water supply and sewage board15 Jan 2026
Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres)15 Jan 2026
Q3 2025-26 KSPCB- MOEF (Above 50 Acres)15 Jan 2026
Q3 2025-26 KPTCL- BESCOM15 Jan 2026
Q3 2025-26 Fire and Safety15 Jan 2026
Q3 2025-26 Airport Authority of India15 Jan 2026
Q3 2025-26 BSNL/Telecommunication Department15 Jan 2026
Estimation of Project Cost certified by EngineerFile: Project Cost Estimation certified by Engineer.pdf20 Sep 2025
Proforma Agreement of Sale- Azur- 19092025File: Proforma Agreement of Sale- Azur- 19092025.pdf20 Sep 2025
200925_Lodha Azur_Application Form Tower A and EFile: 200925_Lodha Azur_Application Form Tower A and E.pdf20 Sep 2025
Site Plan Approved-Tower 8A to 8E and Club House-Azur-1File: Site Plan Approved-Tower 8A to 8E and Club House-Azur-1.pdf17 Sep 2025
Basement-2Approved Building Plan-Tower 8A to 8E and Club House-Azur-2File: Basement-2Approved Building Plan-Tower 8A to 8E and Club House-Azur-2.pdf17 Sep 2025
Basement-1 Approved Building Plan-Tower 8A to 8D and Club House-Azur-3File: Basement-1 Approved Building Plan-Tower 8A to 8D and Club House-Azur-3.pdf17 Sep 2025
Ground floor Plan-Tower 8A to 8D and Club House-Azur-4File: Ground floor Plan-Tower 8A to 8D and Club House-Azur-4.pdf17 Sep 2025
Approved Building Plan-Tower 8A to 8E and Club House-Azur-5File: Approved Building Plan-Tower 8A to 8E and Club House-Azur-5.pdf17 Sep 2025
Approved Building Plan-Tower 8A to 8E and Club House-Azur-6File: Approved Building Plan-Tower 8A to 8E and Club House-Azur-6.pdf17 Sep 2025
Approved Building Plan-Tower 8A to 8E and Club House-Azur-7File: Approved Building Plan-Tower 8A to 8E and Club House-Azur-7.pdf17 Sep 2025
Approved Building Plan-Tower 8A to 8E and Club House-Azur-8File: Approved Building Plan-Tower 8A to 8E and Club House-Azur-8.pdf17 Sep 2025
Approved Building Plan-Tower 8A to 8E and Club House-Azur-9File: Approved Building Plan-Tower 8A to 8E and Club House-Azur-9.pdf17 Sep 2025
Approved Building Plan-Tower 8A to 8E and Club House-Azur-10File: Approved Building Plan-Tower 8A to 8E and Club House-Azur-10.pdf17 Sep 2025
Approved Building Plan-Tower 8A to 8E and Club House-Azur-11File: Approved Building Plan-Tower 8A to 8E and Club House-Azur-11.pdf17 Sep 2025
Approved Building Plan-Tower 8A to 8E and Club House-Azur-12File: Approved Building Plan-Tower 8A to 8E and Club House-Azur-12.pdf17 Sep 2025
Approved Building Plan-Tower 8A to 8E and Club House-Azur-13File: Approved Building Plan-Tower 8A to 8E and Club House-Azur-13.pdf17 Sep 2025
Approved Building Plan-Tower 8A to 8E and Club House-Azur-14File: Approved Building Plan-Tower 8A to 8E and Club House-Azur-14.pdf17 Sep 2025
Approved Building Plan-Tower 8A to 8E and Club House-Azur-15File: Approved Building Plan-Tower 8A to 8E and Club House-Azur-15.pdf17 Sep 2025
Approved Building Plan-Tower 8A to 8E and Club House-Azur-16File: Approved Building Plan-Tower 8A to 8E and Club House-Azur-16.pdf17 Sep 2025
Approved Building Plan-Tower 8A to 8E and Club House-Azur-17File: Approved Building Plan-Tower 8A to 8E and Club House-Azur-17.pdf17 Sep 2025
Approved Building Plan-Tower 8A to 8E and Club House-Azur-18File: Approved Building Plan-Tower 8A to 8E and Club House-Azur-18.pdf17 Sep 2025
Approved Building Plan-Tower 8A to 8E and Club House-Azur-19File: Approved Building Plan-Tower 8A to 8E and Club House-Azur-19.pdf17 Sep 2025
Approved Building Plan-Tower 8A to 8E and Club House-Azur-20File: Approved Building Plan-Tower 8A to 8E and Club House-Azur-20.pdf17 Sep 2025
Approved Building Plan-Tower 8A to 8E and Club House-Azur-21File: Approved Building Plan-Tower 8A to 8E and Club House-Azur-21.pdf17 Sep 2025
HAL NOCFile: HAL NOC dt 29-11-2023.pdf17 Sep 2025
Annexure 95 - BESCOM NOC with fee receiptFile: Annexure 95 - BESCOM NOC with fee receipt.pdf17 Sep 2025
Land Cost Calculation SheetFile: Land Cost Calculation Sheet signed.pdf17 Sep 2025
Area Statement showing phase-wise bifurcationFile: Phase-wise Area Statement.pdf17 Sep 2025
Declaration letter for source of fundsFile: Source of Funding - Declaration Letter.pdf17 Sep 2025
Annexure 87 - Proforma Agreement for SaleFile: Annexure 87 - Proforma Agreement of Sale.pdf17 Sep 2025
Annexure 88 - Application FormFile: Annexure 88 - Application Form.pdf17 Sep 2025
Present Order Sheet of OS/601/2008File: OS-601-2008 Present Order Sheet.pdf17 Sep 2025
Annexure 90 - Section 3(1) Notarized AffidavitFile: Annexure 90 - Section 3(1) Notarized Affidavit.pdf17 Sep 2025
STP Design DrawingFile: STP Design Drawing.pdf17 Sep 2025
Reply to RERA EnquiryFile: Reply to Queries - Azur Phase 2 signed.pdf17 Sep 2025
RTC, survey 328/2-
Mutation, survey 328/2-
Encumbrance Certificate, survey 328/2-
Conversion/Alienation Order, survey 328/2-
Sale/Title/Gift Deed, survey 328/2-

Promoter's earlier projects3

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

3 under way, not due yet
ProjectLocationStatusPromisedDelivered
HavenSy Nos. 60/1, 60/2 & 61/2 , Choodasandra Village, Sarjapura Hobli , AnekalOngoingJun 2030Not due yet
Azur Tower DSy. No. 332/2 of Begur Village, Begur Hobli, Bengaluru SouthOngoingApr 2030Not due yet
AzurSy. No.s 328/2(P), 332/2 of Begur Village, Begur Hobli, Bengaluru SouthOngoingOct 2029Not due yet

How this compares with Bengaluru Urban

86%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Azur Phase 2 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmAzur Phase 2Other 28Dot size: filed unitsN

Filed coordinates, straight-line distance. 28 registered projects within 2 km.

Builder: Lodha Developers Limited

Lodha Developers Limited has 7 registrations on RERA Karnataka, including Elanza and Haven Phase 2. Its filings declare 6 earlier projects, none of them declared completed. Litigation is declared on 3 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Azur Phase 2 is delayed beyond 31 Dec 2030?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Azur Phase 2?

The registered promoter entity is Lodha Developers Limited, a company as per the filing. Its CIN U45200MH1995PLC093041 and GSTIN 29AAACL1490J1ZC can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Azur Phase 2?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Azur Phase 2?

The professionals named in the filing: Architect: Kiran Kempaiah; Engineer: B E Pruthviraja; Chartered Accountant: CHIRAG SARVAIYA & CO. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Azur Phase 2?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Azur Phase 2. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Azur Phase 2 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.