AZAD LAXMI NAGAR SRA CHS
By GOODBUILD (INDIA) PRIVATE LIMITED
RG-MH-10635 · RERA P51800004539 · Last updated on MahaRERA portal: 2 Jan 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- Registration lapsed
- Possession 10 months past the filed date
- 1 complaint at MahaRERA
- Completion date moved by 24 months
- 2 extensions taken
Clear
- No litigation declared
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- All 1 earlier projects delivered on promise
5 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
AZAD LAXMI NAGAR SRA CHS is a Residential / Group Housing project by GOODBUILD (INDIA) PRIVATE LIMITED in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800004539 on 9 Aug 2017. Possession was promised by 29 Dec 2025 and is now 10 months past that date. The completion date has moved by 24 months from the original filing. 93 of the 106 units on this registration are recorded sold or booked, and 20 of 22 construction stages are filed complete. 1 complaint is on record with the regulator.
At a glance
Project
- NameAZAD LAXMI NAGAR SRA CHS
- TypeResidential / Group Housing
- Location
- LINK ROAD
- GOREGAON
- Borivali
- Mumbai Suburban
- 400104
- Pincode400104
- MapView location on Google Maps (as filed on RERA)
- RERA no.P51800004539
- ReraGenie IDRG-MH-10635
Key dates
Key facts
Registration and timeline
- StatusRegistration lapsed
- Registered on9 Aug 2017
- Promised completion29 Dec 2025
- Revised completionRevised to 29 Dec 2025 (originally 30 Dec 2023)
- Buildings2 building records
- Documents filed202 files
Current status
Figures as on 2 Jan 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| A WING | NA | 24 | 21 | 63 | 23 | 86 |
| B-WING | NA | 24 | 21 | 20 | 0 | 20 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 2 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
20 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Stilt Floor, at 0%.
A WING91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
B-WING91%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 100% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 100% |
| Sanitary Fittings within the flats / premises | 100% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 100% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 100% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 100% |
Progress on shared amenities15
As on 2 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 100% |
| Water Supply | Yes | 100% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 100% |
| Storm Water Drains | Yes | 100% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 100% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | No | Not applicable |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 100% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | Yes | 100% |
| Electrical meter room, sub-station, receiving station | Yes | 100% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | No | Not applicable |
Land and ownership
Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| B-WING | NA | Rs 32.95 cr | Rs 32.45 cr |
| A WING | NA | Rs 27.92 cr | Rs 27.50 cr |
Certifying professionals and partners5
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | YUSUF KHAN YUSUF KHAN |
| Engineer | RD MAGDUM DHONDI MAGDUM |
| Engineer | NIYAZ A HANWARE |
| Chartered Accountant | V N SHETTY AND CO |
| Chartered Accountant | SUDESH AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| GOODBUILD (INDIA) PRIVATE LIMITED | - |
Extensions applied for2
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterIt may take sometime for obtaining Occupation Certificate
Reason as filed by the promoterReason for extention of project deadline (Construction of our project has reached approximately 99.64 % Completion , as indicated in form 3 filed before your office ,certain essential formalities are still pending .specifically we are yet to regularize the eligibility (Patra) for 39 tenants ,obtain the revised LOI, IOD and finally secure the occupation certificate, COVID is the reason for all the delays in obtaining the permission.
Complaints filed with MahaRERA1
| Case no. | Complainant | Respondent | Filed |
|---|---|---|---|
| CC006000000079440 | Yugesh P. Vyas | M/s Goodbuild (India) Pvt Ltd | 24/05/2019 |
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 28 Jul 2017 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 5 Dec 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 6 Dec 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 11 Jan 2025Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed202
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 202 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: architect certificate September 2025.pdf | 2 Jan 2026 |
| Withdrawal Update Form 2File: Eng Certificate Sept 2025 Final Q2.pdf | 2 Jan 2026 |
| Withdrawal Update Form 3File: Form 3 Goodbuild Q2.pdf | 2 Jan 2026 |
| Withdrawal Update Form 1File: architect certificate September 2025.pdf | 28 Dec 2025 |
| Withdrawal Update Form 2File: Eng Certificate Sept 2025 Final Q2.pdf | 28 Dec 2025 |
| Withdrawal Update Form 3File: Form 3 Goodbuild Q2.pdf | 28 Dec 2025 |
| Form 1File: Form 1 FY2425 Q4.pdf | 9 Dec 2025 |
| Form 2File: Form 2Q4.pdf | 9 Dec 2025 |
| Form 3File: Form 3 Q4 FY2425.pdf | 9 Dec 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold and Unsold FY2425 Q4.pdf | 9 Dec 2025 |
| Form 5 (FY 2024-2025)File: Form 5 FY2425.pdf | 12 Nov 2025 |
| Declaration in FORM BFile: Form B.pdf | 19 Mar 2025 |
| Declaration in FORM BFile: Form B.pdf | 19 Mar 2025 |
| Other - TechnicalFile: Pert Chart.pdf | 19 Mar 2025 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: Form 5.pdf | 19 Mar 2025 |
| Certificates of CA (Form 3)File: Form -3 Dec 2023.pdf | 21 Feb 2025 |
| Certificates of CA (Form 3)File: Form -3 Dec 2024.pdf | 21 Feb 2025 |
| Certificates of CA (Form 3)File: Form -3 Sep 2024.pdf | 21 Feb 2025 |
| Certificates of CA (Form 3)File: Form -3 Jun 2024.pdf | 21 Feb 2025 |
| Certificates of CA (Form 3)File: Form -3 Mar 2024.pdf | 21 Feb 2025 |
| Certificates of CA (Form 3)File: Form 3 Sep 2023.pdf | 21 Feb 2025 |
| Certificates of CA (Form 3)File: Form-3 June 2023.pdf | 21 Feb 2025 |
| Certificates of CA (Form 3)File: Form-3 Mar 2023.pdf | 21 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arct cert Jan-2023 to March-2023.pdf | 20 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arct cert April-2023 to June-2023.pdf | 20 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arct cert Julr-2023 to Sept-2023.pdf | 20 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arct cert Oct-2023 to Dec-2023.pdf | 20 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arct cert Jan-2024 to March-2024.pdf | 20 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arct cert April-2024 to June-2024.pdf | 20 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arct cert July-2024 to Sept-2024.pdf | 20 Feb 2025 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Arct cert Oct-2024 to Dec-2024.pdf | 20 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RCC Cert Oct-2024 to Dec-2024.pdf | 20 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RCC Cert July - 24 to Sep - 24.pdf | 20 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RCC Cert Apri-2024 to June-2024.pdf | 20 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RCC Cert Jan-2024 to March-2024.pdf | 20 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RCC Cert July-2023 to Sept-2023.pdf | 20 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RCC Consult April-2023 to June-2023.pdf | 20 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RCC CERT Jan-2023 to March-2023.pdf | 20 Feb 2025 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: RCC Cert Oct-2023 to Dec-2023.pdf | 20 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sold and Unsold Inventory Jan-2024 to March-2024.pdf | 20 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sold and Unsold Inventory Oct-2024 to Dec-2024.pdf | 20 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sold and Unsold Inventory July -2024 to Sep -2024.pdf | 20 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sold and Unsold Inventory April-2024 to June-2024.pdf | 20 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sold and Unsold Inventory Oct-2023 to Dec-2023.pdf | 20 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sold and Unsold Inventory July-2023 to Sept-2023.pdf | 20 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sold and Unsold Inventory April-2023 to June-2023.pdf | 20 Feb 2025 |
| Disclosure of sold/ booked inventoryFile: Sold and Unsold Inventory Jan-2023 to March-2023.pdf | 20 Feb 2025 |
| Declaration in FORM BFile: Form B.pdf | 8 Feb 2025 |
| Certificates of CA (Form 5)File: Form 5.pdf | 20 Jan 2025 |
| Declaration about Commencement CertificateFile: Declaration of Commencement Certificate.pdf | 16 Jan 2025 |
| Declaration about all RERA Designated Bank Accounts (Format A)File: Declaration about Separate Bank Account.pdf | 16 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Sold and Booked Inventory.pdf | 15 Jan 2025 |
| CERSAI detailsFile: cersai report.pdf | 15 Jan 2025 |
| CERSAI detailsFile: Cersai Self Declaration.pdf | 15 Jan 2025 |
| Deviation Report with respect to Allotment letterFile: Deviation between draft of Allotment Letter.pdf | 15 Jan 2025 |
| Deviation Report with respect to model copy of AgreementFile: Declaration deviation of Agreement for Sale.pdf | 15 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Other Real Esate Organization - Arshad Zaheer.pdf | 15 Jan 2025 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Other Real Estate Organization - Rashad Mujawar.pdf | 15 Jan 2025 |
| PAN CardFile: Pan Card.pdf | 11 Jan 2025 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 11 Jan 2025 |
| Certificates of CA (Form 5)File: Form 5.pdf | 10 Dec 2024 |
| Certificates of CA (Form 3)File: Form 3.pdf | 9 Dec 2024 |
| Building plan approvalFile: IOD 1.pdf | 6 Dec 2024 |
| Building plan approvalFile: IOD 2.pdf | 6 Dec 2024 |
| Building Plan Approval (IOD)File: IOD 1.pdf | 6 Dec 2024 |
| Building Plan Approval (IOD)File: IOD 2.pdf | 6 Dec 2024 |
| Layout approvalFile: LOI.pdf | 5 Dec 2024 |
| Building plan approvalFile: IOD.pdf | 5 Dec 2024 |
| Copy of Layout Approval (in case of layout)File: LOI.pdf | 5 Dec 2024 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form1.pdf | 5 Dec 2024 |
| Certificates of Engineer (Form 2)(Mandatory for only ongoing project)File: Form 2.pdf | 5 Dec 2024 |
| Building Plan Approval (IOD)File: IOD.pdf | 5 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: Form-2A.pdf | 5 Dec 2024 |
| Declaration in FORM BFile: Affidavit cum Declaration.pdf | 27 Dec 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: Form 2A March 2023.pdf | 2 Nov 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 as on 30092017.pdf | 25 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 as on 31122017 2.pdf | 25 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 as on 31032018 3.pdf | 25 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 as on 30062018 4.pdf | 25 Oct 2023 |
| Certificates of Architect (Form 1)(Mandatory for only ongoing project)File: Form 1 - 30092018 5.pdf | 25 Oct 2023 |
Promoter's earlier projects1
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Flats | Status | Promised | Delivered |
|---|---|---|---|---|---|
| SHEPHERD RESIDENCY | Shepherd Residency Mithanagar Opp Old P South Ward Office Goregaon WEST Mumbai | 218 | Completed | Mar 2012 | Mar 2012 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Mumbai Suburban
Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.
Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- 5 conditions on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 1 other registration and every project registered within 2 km, which the RERA portal never shows together
- All 202 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep AZAD LAXMI NAGAR SRA CHS on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near GOREGAON6,700+ in Mumbai Suburban
Filed coordinates, straight-line distance. 336 registered projects within 2 km.
Opulence
ARIHA BUILDTECH LLP
SHEETAL KIARA
A & A Developers
4TH AVENUE Sunteck City, ODC, Goregaon West
Satguru Corporate Services Pvt. Ltd.
Narang Valora
Narang Realty Private Limited
VIVAN
GOREGAON ELECTRICAL INDUSTRIES LLP
Integrated Ramicon
Integrated Affordable Home Private Limited
See every Mumbai Suburban project, with the district possession charts
Builder: GOODBUILD (INDIA) PRIVATE LIMITED
GOODBUILD (INDIA) PRIVATE LIMITED has 2 registrations on MahaRERA, including AZAD LAXMI NAGAR SRA CHS and SHEPHERD HORIZON. Its filings disclose 4 earlier MahaRERA projects: declares 3 of 3 past projects completed on time. Litigation is declared on 1 of its registrations. Read the full track record. See more projects on the Mumbai Suburban district page.
Frequently asked questions
What does it mean that AZAD LAXMI NAGAR SRA CHS shows as registration lapsed on MahaRERA?
A registration runs until the completion date the promoter declared. If the project is neither completed nor extended by then it lapses, and a de-registration or revocation ends it by order. In every case the promoter may no longer legally advertise, market or sell in the project, and the Authority can act under section 7 against a defaulting promoter. What it does not do is cancel an agreement for sale you have already signed, or extinguish your section 18 right to delay interest or refund; those run from your agreement, not from the registration. Get the current position from the promoter in writing, verify it on the MahaRERA portal, and take legal advice before paying any further instalment.
What are my rights if AZAD LAXMI NAGAR SRA CHS is delayed beyond 29 Dec 2025?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of AZAD LAXMI NAGAR SRA CHS?
The registered promoter entity is GOODBUILD (INDIA) PRIVATE LIMITED, a company as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in AZAD LAXMI NAGAR SRA CHS?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How do I read the complaint cases filed against AZAD LAXMI NAGAR SRA CHS?
Each case number above is a complaint MahaRERA hears in public. On the MahaRERA website, open Complaint Details and search the CC number: the order PDFs, hearing dates and disposal status are free to download. Orders bind the promoter. Before booking, check whether past orders were complied with, not just whether complaints exist; an ignored order is a stronger warning than the complaint itself.
How current is the construction progress shown for AZAD LAXMI NAGAR SRA CHS?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at AZAD LAXMI NAGAR SRA CHS?
The professionals named in the filing: Architect: YUSUF KHAN YUSUF KHAN; Engineer: RD MAGDUM DHONDI MAGDUM; Engineer: NIYAZ A HANWARE; Chartered Accountant: V N SHETTY AND CO; Chartered Accountant: SUDESH AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in AZAD LAXMI NAGAR SRA CHS?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback