Home / Browse projects / Bengaluru Urban, Karnataka / AXIS OAKLYN
AXIS OAKLYN
By AXIS CONCEPT CONSTRUCTION PVT LTD
RG-KA-48690 · RERA PRM/KA/RERA/1251/472/PR/280324/006742 · Last updated on RERA Karnataka portal: 14 Jul 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
AXIS OAKLYN is a Residential/Group Housing project by AXIS CONCEPT CONSTRUCTION PVT LTD in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/472/PR/280324/006742 on 28 Mar 2024. Possession is promised by 31 Mar 2027. 39 of the 56 units on this registration are recorded sold or booked, and 16 of 16 construction stages are filed complete.
At a glance
Project
- NameAXIS OAKLYN
- TypeResidential/Group Housing
- Location
- Yelahanka
- Bengaluru Urban
- 562157
- Pincode562157
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/472/PR/280324/006742
- ReraGenie IDRG-KA-48690
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on28 Mar 2024
- Promised completion31 Mar 2027
- Revised completionNone
- Buildings1 building record
- Documents filed166 files
Current status
Figures as on 14 Jul 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Tower 1 | - | - | - | 56 | 0 | 56 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 14 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
16 of 16 construction stages are filed complete.
Building: 100% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 100% |
| Retaining wall (All types) | Not applicable |
| RCC or MS Framed structure | 100% |
| Masonry Construction | 100% |
| Plastering inside , outside & Ceiling | 100% |
| Joinery: Doors, Windows, Ventilators etc | 100% |
| Basic work of Water supply, Sanitary and Electrification | 100% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 100% |
| Railing and Grill fixing | 100% |
| Electrification, Water supply and Sanitary Finishing | 100% |
| Painting | 100% |
| Fire prevention and fire fighting fitting and fixture with network | Not applicable |
| Weather Proof work(tile,concrete) | 100% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 100% |
| Internal and External work including landscapes as per sanctioned drawings | 100% |
Progress on shared amenities40
As on 14 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 100% |
| Sewage and Drainage System | Yes | 100% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 100% |
| Energy management | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Solid waste management and disposal | Yes | 100% |
| Emergency Evacuation services | No | Not applicable |
| Internal Roads & Footpaths | Yes | 100% |
| Electricity supply transformer and substation | Yes | 100% |
| Storm water drains | Yes | 100% |
| Use of renewable energy | Yes | 100% |
| Sewage Treatment Plant (STP) | Yes | 100% |
| Parks & Tree planting | Yes | 100% |
| Street Lighting | Yes | 100% |
| Electricity | Yes | 100% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | No | Not applicable |
| Club House | No | Not applicable |
| Community Hall | No | Not applicable |
| Outdoor Sports facility | No | Not applicable |
| Indoor Sports facility | No | Not applicable |
| Swimming Pool | No | Not applicable |
| Gym | No | Not applicable |
| Parks | No | Not applicable |
| Power Backup | Yes | 100% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 100% |
| Air Conditioning | No | Not applicable |
| Staircases | Yes | 100% |
| Lifts | Yes | 100% |
| Corridor/Lobbies | Yes | 100% |
| Fire escapes | No | Not applicable |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 100% |
| Basement | No | Not applicable |
| Terrace | Yes | 100% |
| Outer Wall | Yes | 100% |
| Open parking areas | Yes | 100% |
| Provision for lodging of management staff and security staff | Yes | 100% |
| Water conservation and renewable energy | Yes | 100% |
| Common storage spaces | Yes | 100% |
Land and ownership4
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| S.M. KRISHNAMMA | - | - |
| S .K. ANATH KUMAR | - | - |
| S K Sumithra | - | - |
| S K Vanishree | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 20.84 cr | Rs 13.97 cr |
| Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC) | - | Rs 1.19 cr |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | M SURESH KUMAR |
| Engineer | N. MANOHAR |
| Chartered Accountant | G. Pattabhi Reddy |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed166
As listed on the registration, under the names the promoter filed them with; the newest 80 of 166 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/472/PR/280324/006742 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form-4 Axis Oaklyn Q1 26-27.pdf | 14 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Axis Oaklyn Q1 26-27.pdf | 14 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form-6 Axis Oaklyn Q1 26-27.pdf | 14 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 14 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 14 Jul 2026 |
| Q1 2026-27 KPTCL- BESCOM | 14 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form-4_CA_Certificate.pdf | 13 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5_Architect_Certificate.pdf | 13 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form-6_Engineer_Certificate.pdf | 13 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form-4_CA_Certificate Oaklyn_Q3_FY_2025-26.pdf | 14 Jan 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5_Architect_Certificate Oaklyn_Q3_FY_2025-26.pdf | 14 Jan 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form-6_Engineer_Certificate Oaklyn_Q3_FY_2025-26.pdf | 14 Jan 2026 |
| Bank Accounts AffidavitFile: 1 Bank Accounts Affidavit1.pdf | 23 Mar 2024 |
| Source of funds with supporting docsFile: 2 Source of funds with supporting docs.pdf | 23 Mar 2024 |
| CA Membership CopyFile: 4 CA Membership Copy.pdf | 23 Mar 2024 |
| Clarification on Borrowing declarationFile: 5 Clarification on Borrowing declaration.pdf | 23 Mar 2024 |
| Board Report FY 2022-23File: 1 Board Report FY 2022-23.pdf | 23 Mar 2024 |
| Audit report FY 2022-23File: 2 Audit report FY 2022-23.pdf | 23 Mar 2024 |
| Balance Sheet 2022-23File: 3 Balance Sheet 2022-23.pdf | 23 Mar 2024 |
| Cashflow Statement FY 2022-23File: 4 Cashflow Statement FY 2022-23.pdf | 23 Mar 2024 |
| Profit and Loss FY 2022-23File: 5 Profit and Loss FY 2022-23.pdf | 23 Mar 2024 |
| Statement fo Income FY 2022-23File: 6 Statement fo Income FY 2022-23.pdf | 23 Mar 2024 |
| ITR ACK 2022-23File: 7 ITR ACK 2022-23.pdf | 23 Mar 2024 |
| Financials FY 2022-23File: 8 Financials FY 2022-23.pdf | 23 Mar 2024 |
| Balance Sheet FY 2021-22File: 1 Balance Sheet FY 2021-22.pdf | 23 Mar 2024 |
| Profit and Loss FY 2021-22File: 2 Profit and Loss FY 2021-22.pdf | 23 Mar 2024 |
| ITR FY 2021-22File: 3 ITR FY 2021-22.pdf | 23 Mar 2024 |
| Audit report FY 2021-22File: 4 Audit report FY 2021-22.pdf | 23 Mar 2024 |
| Boards Report FY 2021-22File: 5 Boards Report FY 2021-22.pdf | 23 Mar 2024 |
| Cashflow Statement 2021-22File: 6 Cashflow Statement 2021-22.pdf | 23 Mar 2024 |
| Financials FY 2021-22File: 7 Financials FY 2021-22.pdf | 23 Mar 2024 |
| Balance Sheet FY 2020-21File: 1 Balance Sheet FY 2020-21.pdf | 23 Mar 2024 |
| Profit and Loss 2020-21File: 2 Profit and Loss 2020-21.pdf | 23 Mar 2024 |
| ITR FY 2020-21File: 3 ITR FY 2020-21.pdf | 23 Mar 2024 |
| Directors Report FY 2020-21File: 4 Directors Report FY 2020-21.pdf | 23 Mar 2024 |
| Cashflow statement FY 2020-21File: 5 Cashflow statement FY 2020-21.pdf | 23 Mar 2024 |
| Audit report FY 2020-21File: 6 Audit report FY 2020-21.pdf | 23 Mar 2024 |
| Financials FY 2020-21File: 7 Financials FY 2020-21.pdf | 23 Mar 2024 |
| Clarification on Antara ProjectFile: 1 Clarification on Antara Project.pdf | 23 Mar 2024 |
| ANTARA OCFile: 2 ANTARA OC.pdf | 23 Mar 2024 |
| FORM 7 FY 2020-21 AntaraFile: 3 FORM 7 FY 2020-21 Antara.pdf | 23 Mar 2024 |
| FORM 7 FY 2019-20 AntaraFile: 4 FORM 7 FY 2019-20 Antara.pdf | 23 Mar 2024 |
| FORM 7 FY 2018-19 AntaraFile: 5 FORM 7 FY 2018-19 Antara.pdf | 23 Mar 2024 |
| Form-5 Architect - Q4 - 2020 -21 Axis AntaraFile: 6 Form-5 Architect - Q4 - 2020 -21 Axis Antara.pdf | 23 Mar 2024 |
| Form-6 Engineer - Q4 - 2020 - 21 Axis AntaraFile: 7 Form-6 Engineer - Q4 - 2020 - 21 Axis Antara.pdf | 23 Mar 2024 |
| Form-4 CA - Q4 - 2020 - 21 Axis AntaraFile: 8 Form-4 CA - Q4 - 2020 - 21 Axis Antara.pdf | 23 Mar 2024 |
| EC Sy No 46 2004-2024File: 1 EC Sy No 46 2004-2024.pdf | 23 Mar 2024 |
| Grant Certificate - Title deed of KrishnappaFile: 2 Grant Certificate - Title deed of Krishnappa.pdf | 23 Mar 2024 |
| IHC 28-1980-81- Title deed of KrishnappaFile: 3 IHC 28-1980-81- Title deed of Krishnappa.pdf | 23 Mar 2024 |
| Sharing Agreement - 35 per share of S K Ananth KumarFile: 4 Sharing Agreement - 35 per share of S K Ananth Kumar.pdf | 23 Mar 2024 |
| Khatha ExtractFile: 5 Khatha Extract.pdf | 23 Mar 2024 |
| Clarification on Single Layout Plot and OrderFile: 1 Clarification on Single Layout Plot and Order.pdf | 23 Mar 2024 |
| ADLR Survey SketchFile: 2 ADLR Survey Sketch.pdf | 23 Mar 2024 |
| Area Statement Certified by ArchitectFile: 3 Area Statement Certified by Architect.pdf | 23 Mar 2024 |
| Affidavit for KSPCB NOCFile: 4 Affidavit for KSPCB NOC.pdf | 23 Mar 2024 |
| Building LicenseFile: 5 Building License.pdf | 23 Mar 2024 |
| Form 3 Engineer certificateFile: 2 Form 3 Engineer certificate.pdf | 23 Mar 2024 |
| Engineer License Self-attestedFile: 4 Engineer License Self-attested.jpeg | 23 Mar 2024 |
| Guideline Value ReportFile: 5 Guideline Value Report.pdf | 23 Mar 2024 |
| RTC, survey 46 | - |
| Mutation, survey 46 | - |
| Encumbrance Certificate, survey 46 | - |
| Conversion/Alienation Order, survey 46 | - |
| Sale/Title/Gift Deed, survey 46 | - |
| JDA, survey 46 | - |
| Khatha, survey 46 | - |
| Registration CertificateFile: Certificate of Incorporation.pdf | - |
| Organization StructureFile: Organisational Chart.pdf | - |
| Certificate issued by CA Form 1File: Form-1 CA Certificate.pdf | - |
| Certificate issued by Architect Form 2File: Form 2 Architect Certificate.pdf | - |
| Certificate issued by Engineer Form 3File: Form 3 Engineer certificate.pdf | - |
| Project Chartered Accountant | - |
| Project Engineer | - |
| Project Architect | - |
| AffidavitFile: Non litigation Affidavit.pdf | - |
| Certificate from Chartered AccountFile: Form-1 CA Certificate.pdf | - |
| Balance Sheet 2022 - 2023File: Balance Sheet 2022-23.pdf | - |
| Balance Sheet 2021 - 2022File: Balance Sheet 2021-22.pdf | - |
| Balance Sheet 2020 - 2021File: Balance Sheet 2020-21.pdf | - |
| Audited Profit and Loss Statement 2022 - 2023File: Profit and Loss 2022-23.pdf | - |
Promoter's earlier projects3
As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.
| Project | Location | Status | Promised | Delivered |
|---|---|---|---|---|
| BOCHS Akshaya | Sy No.24,Begur Village, Begur Hobli, , Bangalore South , Begur Hobli , Bengaluru South , Bengaluru Urban, Karnataka | Ongoing | Nov 2024 | Not delivered |
| Axis Antara | Katha No 106, Sy 27/1 and 27/2, yelenahalli village | Completed | - | No date filed |
| AXIS VANAM | Sy No 127/A,Katha No - 111/127/A, Kothanur Village, Uttarahalli Hobli, | Completed | - | No date filed |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep AXIS OAKLYN on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 7 registered projects within 2 km.
SATTVA CITY
SATTVA CITY PRIVATE LIMITED
EMBASSY VERDE
EMBASSY DEVELOPMENTS LIMITED
Aeropolis, a project of Sattva Group
TRINAYANI REALTOR PRIVATE LIMITED
DS MAX SKY SHLOKAM
DS Max Properties Private Limited
EMBASSY SOUTH RESERVE
SUMMIT DEVELOPMENTS LIMITED
Bhartiya Garden Estate Phase-1
Bhartiya Urban Pvt Ltd
See every Bengaluru Urban project, with the district possession charts
Builder: AXIS CONCEPT CONSTRUCTION PVT LTD
Axis Concept Construction Pvt Ltd has 5 registrations on RERA Karnataka, including Axis Niran and Axis Vanam. Its filings declare 7 earlier projects, 5 of them declared completed. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if AXIS OAKLYN is delayed beyond 31 Mar 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of AXIS OAKLYN?
The registered promoter entity is AXIS CONCEPT CONSTRUCTION PVT LTD, a company as per the filing. Its CIN U45201KA2007PTC043841 and GSTIN 29AAHCA0685P1Z1 can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in AXIS OAKLYN?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at AXIS OAKLYN?
The professionals named in the filing: Architect: M SURESH KUMAR; Engineer: N. MANOHAR; Chartered Accountant: G. Pattabhi Reddy. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in AXIS OAKLYN?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback