Home / Browse projects / Pune, Maharashtra / Awadh Nagari
Awadh Nagari
RG-MH-67093 · RERA P52100056464 · Last updated on MahaRERA portal: 1 Jul 2026
Source: official MahaRERA filing
Or get an email each time it changes, with the project watch
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against every project registered within 2 km.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
Awadh Nagari is a Others project by Chopra Kakde Realty LLP in Pune, Maharashtra, registered with MahaRERA as P52100056464 on 5 Jun 2024. Possession is promised by 31 Dec 2027. 113 of the 308 units on this registration are recorded sold or booked, and 6 of 22 construction stages are filed complete.
At a glance
Project
- NameAwadh Nagari
- TypeOthers
- Location
- Sector no. 3
- Indryani Nagar
- Borhadewadi
- Haveli
- Pune
- 412105
- Pincode412105
- MapView location on Google Maps (as filed on RERA)
- RERA no.P52100056464
- ReraGenie IDRG-MH-67093
Builder
- NameChopra Kakde Realty LLP
- Entity typeOthers
- PartnersSuresh Uttam Kakde Kakde, Ritesh Jasvant Patel Patel
Key dates
Key facts
Registration and timeline
- StatusRegistered
- Registered on5 Jun 2024
- Promised completion31 Dec 2027
- Revised completionNone
- Buildings2 building records
- Documents filed87 files
Current status
Figures as on 1 Jul 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| WING C | NA | 13 | 12 | 154 | 0 | 154 |
| Wing B | NA | 15 | 14 | 154 | 0 | 154 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building2
As on 1 Jul 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
6 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 50%.
WING C32%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 50% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Wing B32%
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 50% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 0% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 0% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 1 Jul 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | Yes | 0% |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | Yes | 0% |
| Open Parking | Yes | 0% |
Parking filed207
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
| Building | Closed/Covered | Open Space | Total |
|---|---|---|---|
| WING C | 87 | 14 | 101 |
| Wing B | 90 | 16 | 106 |
Land and ownership66
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Popat Ramchandra Alhat | Moshi | Pune |
| Rangnath Ramchandra Alhat | Moshi | Pune |
| Nandabai Rangnath Alhat | Moshi | Pune |
| Vijay Popat Alhat | Moshi | Pune |
| Yogita Vijay Alhat | Moshi | Pune |
| Rohit Vijay Alhat | Moshi | Pune |
| Om Vijay Alhat | Moshi | Pune |
| Vaman Rangnath Alhat | Moshi | Pune |
| Pritam Vaman Alhat | Moshi | Pune |
| Ananya Vaman Alhat | Moshi | Pune |
| Vishal Rangnath Alhat | Moshi | Pune |
| Rahul Rangnath Alhat | Moshi | Pune |
| Subhash Lakshman Alhat | Moshi | Pune |
| Sharda Subhash Alhat | Moshi | Pune |
| Sadashiv Subhash Alhat | Moshi | Pune |
| Prakash Subhash Alhat | Moshi | Pune |
| Ramchandra Lakshaman Alhat | Moshi | Pune |
| Akshay Ramchandra Alhat | Moshi | Pune |
| Pratik Ramchandra Alhat | Moshi | Pune |
| Manjulabai Lakshman Alhat | Moshi | Pune |
| Nathu Govind Alhat | Moshi | Pune |
| Tarabai Nathu Alhat | Moshi | Pune |
| Barkabai Chandrakant Alhat | Moshi | Pune |
| Sukhdev Chandrkant Alhat | Moshi | Pune |
| Somnath Chandrakant Alhat | Moshi | Pune |
| Anita Baban Phule | CHARHOLI | Pune |
| Swati Ashok Khedkar | CHARHOLI | Pune |
| Archana Narendra Khedkar | Chakan (CT) | Pune |
| Hanumanth Nathu Alhat | Moshi | Pune |
| Nandabai Hanumanth Alhat | Moshi | Pune |
| Vidya Nilesh Waghole | Nanded | Pune |
| Vasudev Hanumanth Alhat | Moshi | Pune |
| Vishal Hanumanth Alhat | Moshi | Pune |
| Hausabai Vithoba Alhat | Moshi | Pune |
| Pooja Ketan Jadhav | Pimpri | Pune |
| Akshay Vithoba Alhat | Moshi | Pune |
| Kisan Govinda Alhat | Moshi | Pune |
| Suresh Kiran Alhat | Moshi | Pune |
| Pramila Suresh Alhat | Moshi | Pune |
| Yogesh Suresh Alhat | Moshi | Pune |
| Yogita Nilesh Jadhav | Chakan (CT) | Pune |
| Amit Suresh Alhat | Moshi | Pune |
| Ashok Kisan Alhat | Moshi | Pune |
| Shailabai Asok Alhat | Moshi | Pune |
| Ashwini Yogesh Bankar | Chikhali | Pune |
| Shweta Mahesh Khedkar | Chakan (CT) | Pune |
| Sanket Ashok Alhat | Moshi | Pune |
| Dattu Govind Alhat | Moshi | Pune |
| Sitabai Dattu Alhat | Moshi | Pune |
| Gulab dattu Alhat | Moshi | Pune |
| Maya Gulab Alhat | Moshi | Pune |
| Rupali Vinod Ladkat | Ladkatwadi | Pune |
| Vishal Gulab Alhat | Moshi | Pune |
| Dipali Mahendra Mandlik | Chikhali | Pune |
| Gorakh Dattu Alhat | Moshi | Pune |
| Mirabai Gorakh Alhat | Moshi | Pune |
| Anuja Navnath Bankar | Chimbali | Pune |
| KalayaniAmol Borte | Moshi | Pune |
| Manoj Gorakh Alhat | Moshi | Pune |
| Mohan Dattu Alhat | Moshi | Pune |
| Latabai Mohan Alhat | Moshi | Pune |
| Amol Mohan Alhat | Moshi | Pune |
| Vinyak Mohan Alhat | Moshi | Pune |
| Vithoba Nathu Alhat | Moshi | Pune |
| Rose Villa | Bhosari | Pune |
| Sangita Ramchandra Alhat | Moshi | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| WING C | NA | Rs 42.80 cr | Rs 14.32 cr |
| Wing B | NA | Rs 42.80 cr | Rs 14.32 cr |
| - | NA | Rs 75.00 lakh | - |
Certifying professionals and partners6
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Cubix Architects Associates |
| Engineer | Mr. Hiren Bhavsar |
| Engineer | Nilesh Dighe |
| Chartered Accountant | CA Shakti Soni and Associates |
| Chartered Accountant | Swati Patel |
| Chartered Accountant | Bhavik J Velani |
| Partner | Role in project |
|---|---|
| Chopra Kakde Realty LLP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 15 Apr 2024 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 22 Jun 2024 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 1 May 2024 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 1 Apr 2024Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot due yet
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
possession is promised for 31 Dec 2027
Documents filed87
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 87 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Awadh Nagari Form 1 _march QPR 2026 11.pdf | 1 Jul 2026 |
| Withdrawal Update Form 2File: Form 2 - Awadh Nagari March QPR 2026.pdf | 1 Jul 2026 |
| Withdrawal Update Form 3File: Awadh nagari Form 3 _March QPR 2026_compressed.pdf | 1 Jul 2026 |
| Withdrawal Update Form 1File: Awadh Form 1 QPR _ 25-26_DEC 26.pdf | 3 Feb 2026 |
| Withdrawal Update Form 2File: Form 2 Q2 Awadh Nagari_QPR sep 26.pdf | 3 Feb 2026 |
| Withdrawal Update Form 3File: Chopada Kakde Realty LLLP Form-3.pdf | 3 Feb 2026 |
| Withdrawal Update Form 1File: Awadh Form 1 QPR _ 25-26 SEPT 25.pdf | 31 Jan 2026 |
| Withdrawal Update Form 2File: Form 2 Q2 Awadh Nagari_QPR sep 26.pdf | 31 Jan 2026 |
| Withdrawal Update Form 3File: Chopada Kakde Realty LLLP Form-3 FINAL.pdf | 31 Jan 2026 |
| Form 5 (FY 2024-2025)File: Uploded Chopra Kakde Realty LLP.pdf | 8 Oct 2025 |
| Form 1File: Form 1 - Q4- 2024-25 (1).pdf | 26 Sep 2025 |
| Form 2File: Form 2 - Q4- 2024-25.pdf | 26 Sep 2025 |
| Form 3File: Awadh Nargy Form 3 June.pdf | 26 Sep 2025 |
| Disclosure of Sold and Booked InventoryFile: DISCLOSURE OF SOLDBOOKED INVENTORY_CKRLLP 31032025-2-8.pdf | 26 Sep 2025 |
| Withdrawal Update Form 1File: Form1.pdf | 24 Sep 2025 |
| Withdrawal Update Form 1File: form 1.pdf | 24 Sep 2025 |
| Withdrawal Update Form 1File: form 1.pdf | 24 Sep 2025 |
| Withdrawal Update Form 2File: Form 2 - Q1- 2025-26.pdf | 24 Sep 2025 |
| Withdrawal Update Form 2File: Form 2 - Q1- 2025-26.pdf | 24 Sep 2025 |
| Withdrawal Update Form 2File: Form 2 - Q1- 2025-26.pdf | 24 Sep 2025 |
| Withdrawal Update Form 3File: Awadh nagry form 3 august.pdf | 24 Sep 2025 |
| Withdrawal Update Form 3File: Awadh nagry form 3 august.pdf | 24 Sep 2025 |
| Withdrawal Update Form 3File: Awadh nagry form 3 august.pdf | 24 Sep 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 awadh nagari.pdf | 22 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 awadh nagari 24 (2).pdf | 22 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 awadh nagari.pdf | 22 Apr 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 awadh nagari 2024_compressed.pdf | 22 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 awadh nagari.pdf | 22 Apr 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 awadh nagari 24.pdf | 22 Apr 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: form 1 30_09.pdf | 12 Nov 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: form 3 30_09 .pdf | 12 Nov 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: form 2 30_09-output.pdf | 12 Nov 2024 |
| Disclosure of sold/ booked inventoryFile: final disclosure of sold and unsold inventory awadh nagari.pdf | 12 Nov 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 22 Oct 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 22 Oct 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form - 2.pdf | 22 Oct 2024 |
| Layout approvalFile: IMG_524[1] (1).pdf | 22 Jun 2024 |
| Copy of Layout Approval (in case of layout)File: IMG_524[1] (1).pdf | 22 Jun 2024 |
| Other - FinanceFile: DA - 48 R H18-11594-2017 DT 07072017_6_11zon.pdf | 22 May 2024 |
| Other - FinanceFile: Chopra kakde 674 DA_4_11zon.pdf | 22 May 2024 |
| Other - FinanceFile: DA - 52 R H18-5841.pdf | 22 May 2024 |
| Other - FinanceFile: poa2.pdf | 14 May 2024 |
| Other - FinanceFile: poa3.pdf | 14 May 2024 |
| Other - FinanceFile: poa4.pdf | 14 May 2024 |
| Building plan approvalFile: Layout01.pdf | 1 May 2024 |
| Building plan approvalFile: B and C wing Parking.pdf | 1 May 2024 |
| Building plan approvalFile: chopra kakde B and C.pdf | 1 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: Layout01.pdf | 1 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: B and C wing Parking.pdf | 1 May 2024 |
| Building Plan Approval / NA Order for plotted developmentFile: chopra kakde B and C.pdf | 1 May 2024 |
| Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: Declaration about separate bank account.pdf | 19 Apr 2024 |
| Other - FinanceFile: updated Declaration for allotment of units copy 2_11zon.pdf | 19 Apr 2024 |
| Copy of the legal title reportFile: scan20240412145048.pdf | 15 Apr 2024 |
| Copy of the legal title reportFile: scan20240412144821.pdf | 15 Apr 2024 |
| Copy of the legal title reportFile: scan20240410220957.pdf | 15 Apr 2024 |
| Copy of the legal title reportFile: scan20240410214644.pdf | 15 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: signed FORM 3.pdf | 15 Apr 2024 |
| Proforma of Agreement for saleFile: Final RERA Draft - Suresh Kakde .pdf | 15 Apr 2024 |
| Deviation Report with respect to model copy of AgreementFile: DEVIATIONS.pdf | 15 Apr 2024 |
| Layout approvalFile: 1.pdf | 11 Apr 2024 |
| Layout approvalFile: layout 2 .pdf | 11 Apr 2024 |
| Copy of Layout Approval (in case of layout)File: 1.pdf | 11 Apr 2024 |
| Copy of Layout Approval (in case of layout)File: layout 2 .pdf | 11 Apr 2024 |
| Details of encumbrances concerned to FinanceFile: finance encumberance.pdf | 10 Apr 2024 |
| Details of encumbrances concerned to LegalFile: finance encumberance.pdf | 10 Apr 2024 |
| Other - LegalFile: 687.pdf | 10 Apr 2024 |
| Other - LegalFile: 686.pdf | 10 Apr 2024 |
| Other - LegalFile: 674.pdf | 10 Apr 2024 |
| Other - LegalFile: PIMPRI CHINCHWAD MUNICIPAL CORPORATION Mail - Commencement Certificate Verification For RE | 8 Apr 2024 |
| Other - LegalFile: abc.pdf | 8 Apr 2024 |
| Other - TechnicalFile: PIMPRI CHINCHWAD MUNICIPAL CORPORATION Mail - Commencement Certificate Verification For RE | 8 Apr 2024 |
| Other - TechnicalFile: abc.pdf | 8 Apr 2024 |
| Declaration in FORM BFile: form b promoter.pdf | 3 Apr 2024 |
| Details of encumbrances concerned to FinanceFile: legal encumberance.pdf | 1 Apr 2024 |
| Details of encumbrances concerned to LegalFile: legal encumberance.pdf | 1 Apr 2024 |
| Commencement Certificates / NA Order for plotted developmentFile: cc.pdf | 1 Apr 2024 |
| Declaration about Commencement CertificateFile: DECLARATION ABOUT COMMENCEMENT CERTIFICATE (1).pdf | 1 Apr 2024 |
| CERSAI detailsFile: CERSAI REPORT undertaking suresh kakde.pdf | 1 Apr 2024 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: a.pdf | 1 Apr 2024 |
| Proforma of Allotment letterFile: ALLOTMENT LETTER (1).pdf | 1 Apr 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Built from this project's filings on the day you order, in plain language.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- Joined against every project registered within 2 km, which the RERA portal never shows together
- All 87 filed documents as one ZIP, foldered, with a manifest
- The project watch below, included free for 90 days
Project watch
Only want to be told when something changes?
- An email each time this filing moves: new sales, a moved possession date, an extension, a complaint, the occupancy certificate
- Plain words, conditions that have happened marked in red
- A summary of everything that changed when the 90 days end
Keep Awadh Nagari on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Indryani Nagar13,700+ in Pune
Filed coordinates, straight-line distance. 229 registered projects within 2 km.
TANISH PARK
TANISH DEVELOPERS
Ajinkya Towers
APAK Bussiness Innovation Pvt Ltd
SILVER GARDENIA
SILVER PROMOTERS AND DEVELOPERS
Mangalam Life Park
Mangalam Buildcorp
SingaPune Ph 3
Xrbia Mirth Properties LLP
SingaPune Ph 2
Xrbia Mirth Properties LLP
Builder: Chopra Kakde Realty LLP
Chopra Kakde Realty LLP has 1 registration on MahaRERA, including Awadh Nagari. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if Awadh Nagari is delayed beyond 31 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of Awadh Nagari?
The registered promoter entity is Chopra Kakde Realty LLP, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in Awadh Nagari?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for Awadh Nagari?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at Awadh Nagari?
The professionals named in the filing: Architect: Cubix Architects Associates; Engineer: Mr. Hiren Bhavsar; Engineer: Nilesh Dighe; Chartered Accountant: CA Shakti Soni and Associates; Chartered Accountant: Swati Patel; Chartered Accountant: Bhavik J Velani. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Awadh Nagari?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback