Home / Browse projects / Pune, Maharashtra / AVDHOOT PLAZA
AVDHOOT PLAZA
RG-MH-71970 · RERA P52100054023 · Last updated on MahaRERA portal: 30 Jan 2026
Source: official MahaRERA filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- No encumbrance on the project land
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
Nothing adverse is on this record. The buyer report still reads the filed documents themselves.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
AVDHOOT PLAZA is a Others project by VIGHNAHARTA GROUP in Pune, Maharashtra, registered with MahaRERA as P52100054023 on 19 Dec 2023. The registration is recorded completed; possession was promised by 30 Dec 2027. 18 of the 38 units on this registration are recorded sold or booked, and 2 of 11 construction stages are filed complete.
At a glance
Project
- NameAVDHOOT PLAZA
- TypeOthers
- Location
- Jalochi Road
- Plot No 4
- Gat No 192/1/1/2
- Jalochi
- Baramati
- Dist Pune
- Pin 413102
- Baramati (M Cl)
- Baramati
- Pune
- 413102
- Pincode413102
- RERA no.P52100054023
- ReraGenie IDRG-MH-71970
Builder
- NameVIGHNAHARTA GROUP
- Entity typePartnership
- PartnersPratik Uttam Chikane, Rajashri Sandip Gawade, Anu Jayant Aasgaonkar, Vandana Ganpat Taware
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on19 Dec 2023
- Promised completion30 Dec 2027
- Revised completionNone
- Buildings1 building record
- Documents filed86 files
Current status
Figures as on 30 Jan 2026, this project's latest MahaRERA filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| AVDHOOT PLAZA | NA | 8 | 8 | 31 | 7 | 38 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 30 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
2 of 11 construction stages are filed complete. The stage furthest along is Stilt Floor, at 98%.
AVDHOOT PLAZA: 48% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 0% |
| Podiums (if any) | 0% |
| Plinth | 100% |
| Stilt Floor | 98% |
| Slabs of Super Structure | 75% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 68% |
| Sanitary Fittings within the flats / premises | 18% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 65% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 0% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 30 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | No | Not applicable |
| Water Supply | Yes | 90% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 50% |
| Storm Water Drains | No | Not applicable |
| Landscaping & Tree Planting | Yes | 10% |
| Street Lighting | No | Not applicable |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 10% |
| Solid Waste Management And Disposal | No | Not applicable |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | No | Not applicable |
| Fire protection and fire safety requirements | No | Not applicable |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Parking filed65
Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.
Land and ownership3
MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.
| Landowner | Village | District |
|---|---|---|
| Milind Hanumantro Kadam | Sangavi | Pune |
| Satish Babasaheb Taware | Baramati (M Cl) | Pune |
| Rekha Nitin Bhosale | Wanewadi | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Building | Wing | Estimated | Incurred |
|---|---|---|---|
| AVDHOOT PLAZA | NA | Rs 4.80 cr | Rs 3.12 cr |
Certifying professionals and partners4
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Bhosale Consultants |
| Engineer | Bhosale Counsultants |
| Chartered Accountant | Pratik doshi & Associates |
| Chartered Accountant | Paresh Mokashi |
| Partner | Role in project |
|---|---|
| VIGHNAHARTA GROUP | - |
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 10 Nov 2023 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 8 Nov 2023 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 8 Nov 2023 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 8 Nov 2023Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateNot on the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
Documents filed86
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath; the newest 80 of 86 are shown. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Withdrawal Update Form 1File: Form 1.pdf | 30 Jan 2026 |
| Withdrawal Update Form 2File: Form 2.pdf | 30 Jan 2026 |
| Withdrawal Update Form 3File: Form 3.pdf | 30 Jan 2026 |
| Occupational CertificateFile: FULL OC CERTIFICATE.pdf | 30 Jan 2026 |
| Withdrawal Update Form 1File: Form 1.pdf | 14 Nov 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 14 Nov 2025 |
| Withdrawal Update Form 3File: Form 3.pdf | 14 Nov 2025 |
| Form 5 (FY 2024-2025)File: Form 5 - Vighnaharta.pdf | 14 Nov 2025 |
| Withdrawal Update Form 1File: Form 1.pdf | 2 Aug 2025 |
| Withdrawal Update Form 2File: Form 2.pdf | 2 Aug 2025 |
| Withdrawal Update Form 3File: Form 3.pdf | 2 Aug 2025 |
| Form 1File: Form 1.pdf | 27 Jun 2025 |
| Form 2File: Form 2.pdf | 27 Jun 2025 |
| Form 3File: Form 3.pdf | 27 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Book Inventory.pdf | 27 Jun 2025 |
| Self-declaration of Quarterly ProgressFile: Self Declaration (2).pdf | 27 Jun 2025 |
| Form 1File: Form 1.pdf | 27 Jun 2025 |
| Form 2File: Form 2.pdf | 27 Jun 2025 |
| Form 3File: Form 3 CA.pdf | 27 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Disclosuure Of Sold book Inventory.pdf | 27 Jun 2025 |
| Form 1File: Form 1 OTR 2 24 25.pdf | 27 Jun 2025 |
| Form 2File: Form 2 OTR 2 24 25.pdf | 27 Jun 2025 |
| Form 3File: Form 3 OTR 2 24-25.pdf | 27 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Book Inventory 30 09 24.pdf | 27 Jun 2025 |
| Form 1File: Form 1 OTR 1 24 25.pdf | 27 Jun 2025 |
| Form 2File: Form 2 OTR 1 24 25.pdf | 27 Jun 2025 |
| Form 3File: Form 3 OTR 1 24-25.pdf | 27 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Book Inventory 30 09 24.pdf | 27 Jun 2025 |
| Form 1File: archtierct certificate.pdf | 27 Jun 2025 |
| Form 2File: Engineer Certificate.pdf | 27 Jun 2025 |
| Form 3File: Form 3 CA qtr 4.pdf | 27 Jun 2025 |
| Disclosure of Sold and Booked InventoryFile: Sold Book Inventory 30 09 24.pdf | 27 Jun 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 3 May 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3.pdf | 3 May 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 3 May 2025 |
| Disclosure of sold/ booked inventoryFile: Sold Book Inventory.pdf | 3 May 2025 |
| Other - TechnicalFile: Form 2A.pdf | 3 May 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1.pdf | 24 Jan 2025 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA.pdf | 24 Jan 2025 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2.pdf | 24 Jan 2025 |
| Disclosure of sold/ booked inventoryFile: Disclosuure Of Sold book Inventory.pdf | 24 Jan 2025 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 OTR 1 24 25.pdf | 6 Dec 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Form 1 OTR 2 24 25.pdf | 6 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 OTR 1 24-25.pdf | 6 Dec 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 OTR 2 24-25.pdf | 6 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 OTR 1 24 25.pdf | 6 Dec 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Form 2 OTR 2 24 25.pdf | 6 Dec 2024 |
| Disclosure of sold/ booked inventoryFile: Sold Book Inventory 30 09 24.pdf | 6 Dec 2024 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: fORM 5 Vighnharta 23 24.pdf | 6 Dec 2024 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: 2 A Quality assurance certifiacate.pdf | 13 Jun 2024 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: archtierct certificate.pdf | 20 Apr 2024 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate.pdf | 20 Apr 2024 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form 3 CA qtr 4.pdf | 20 Apr 2024 |
| Disclosure of sold/ booked inventoryFile: Disclosure Of sold inventory.pdf | 22 Feb 2024 |
| Other - TechnicalFile: BNP Mail CC OC.pdf | 21 Nov 2023 |
| Copy of the legal title reportFile: RERA Search report.pdf | 10 Nov 2023 |
| Building plan approvalFile: Sanction Plan.pdf | 8 Nov 2023 |
| Layout approvalFile: Plot Layout.pdf | 8 Nov 2023 |
| Layout approvalFile: NA Order.pdf | 8 Nov 2023 |
| PAN CardFile: Vighnartharta Group Pan Card.pdf | 8 Nov 2023 |
| Details of encumbrances concerned to FinanceFile: Declaration of No Legal Financial encumbrance.pdf | 8 Nov 2023 |
| Details of encumbrances concerned to FinanceFile: No Ecumbrances.pdf | 8 Nov 2023 |
| Details of encumbrances concerned to LegalFile: Declaration of No Legal Financial encumbrance.pdf | 8 Nov 2023 |
| Details of encumbrances concerned to LegalFile: No Ecumbrances.pdf | 8 Nov 2023 |
| Copy of Layout Approval (in case of layout)File: Plot Layout.pdf | 8 Nov 2023 |
| Copy of Layout Approval (in case of layout)File: NA Order.pdf | 8 Nov 2023 |
| Building Plan Approval / NA Order for plotted developmentFile: Sanction Plan.pdf | 8 Nov 2023 |
| Commencement Certificates / NA Order for plotted developmentFile: Commencement Certificate.pdf | 8 Nov 2023 |
| Declaration about Commencement CertificateFile: Declaratrion of commencement certificate.pdf | 8 Nov 2023 |
| Declaration in FORM BFile: Form 'B' Promoter.pdf | 8 Nov 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: Architects Certificate 2.pdf | 8 Nov 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Certificate 2.pdf | 8 Nov 2023 |
| CERSAI detailsFile: Cersai Search Report.pdf | 8 Nov 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form No 3 CA.pdf | 8 Nov 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Pratik Chikane.pdf | 8 Nov 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Rajashree Gawade.pdf | 8 Nov 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A 1 Vandana Taware.pdf | 8 Nov 2023 |
| Disclosure of Interest in Other Real Estate OrganizationsFile: Annexure A Anu Asagaonkar.pdf | 8 Nov 2023 |
| Proforma of Allotment letterFile: Proforma Allotment Letter.pdf | 8 Nov 2023 |
| Proforma of Agreement for saleFile: Model AFS.pdf | 8 Nov 2023 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- Red flags and clear checks, the possession story, sanctions and sales, land and title, who you are dealing with
- All 86 filed documents as one ZIP, foldered, with a manifest
Keep AVDHOOT PLAZA on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Plot No 4, Gat No 192/1/1/2, Jalochi, Baramati, Dist Pune, Pin 41310213,700+ in Pune
Vrundavan Park
Sunil Ganpati Aitavadekar
SAINAGAR
SHRIMUDRA CONSTRUCTION
MAGIC GREEN CITY PART 2
Magic Homes
ARYA SQUARE
SAIRAJ INFRA
SWAPNAPURTI
Mandar Shrikant Sikachi
Deshpande Somani Square
Somani Landmarks LLP
Builder: VIGHNAHARTA GROUP
VIGHNAHARTA GROUP has 1 registration on MahaRERA, including AVDHOOT PLAZA. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if AVDHOOT PLAZA is delayed beyond 30 Dec 2027?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of AVDHOOT PLAZA?
The registered promoter entity is VIGHNAHARTA GROUP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in AVDHOOT PLAZA?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for AVDHOOT PLAZA?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at AVDHOOT PLAZA?
The professionals named in the filing: Architect: Bhosale Consultants; Engineer: Bhosale Counsultants; Chartered Accountant: Pratik doshi & Associates; Chartered Accountant: Paresh Mokashi. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in AVDHOOT PLAZA?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback