ReraGenieLog inGet a buyer report

Home / Browse projects / Bengaluru Rural, Karnataka / Aurum at Brigade El Dorado

Registration approved No litigation declared Residential/Group Housing project

Aurum at Brigade El Dorado

By Brigade Tetrarch Private Limited

RG-KA-51846 · RERA PRM/KA/RERA/1250/303/PR/230623/006018 · Last updated on RERA Karnataka portal: 14 Jan 2026

Source: official RERA Karnataka filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Dec 2027Possession promisedno revision filed
0Complaints at RERA Karnatakaon this registration
Jump to the 115 documents Report an error

Aurum at Brigade El Dorado is a Residential/Group Housing project by Brigade Tetrarch Private Limited in Bengaluru Rural, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1250/303/PR/230623/006018 on 23 Jun 2023. Possession is promised by 31 Dec 2027.

At a glance

Project

  • NameAurum at Brigade El Dorado
  • TypeResidential/Group Housing
  • Location
    • Devanahalli
    • Bengaluru Rural
    • 562149
  • Pincode562149
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1250/303/PR/230623/006018
  • ReraGenie IDRG-KA-51846

Builder

  • NameBrigade Tetrarch Private Limited
  • Entity typeCompany
  • CINU92412KA1995PTC018247
  • GSTIN29AAACT7266Q1ZG
  • Authorized SignatoryMr. Viswa Prathap Desu
  • DirectorsPavitra Shankar, Amar Shivram Mysore, Pavitra Shankar, Roshin Mathew
  • Project HeadMohan Ayyakod
  • Other registrations9 more →
  • Declared earlier projects4 →

Key dates

this monthRegisteredJun 2023PromisedDec 2027

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on23 Jun 2023
  • Promised completion31 Dec 2027
  • Revised completionNone
  • Buildings1 building record
  • Documents filed115 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
Aurum at Brigade El Dorado---4770477

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 14 Jan 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

Building:

ActivityProgress
Earth work and other leveling preparation work-
Foundation footing work-
Retaining wall (All types)-
Plinth level Beam-
Sub-structure flooring (Parking Floor, more than one floor below general ground level)-
RCC or MS Framed structure-
Masonry construction: Bricks, Concrete blocks etc-
Plastering inside , outside & Ceiling-
Joinery: Doors, Windows, Ventilators etc-
Basic work of Water supply, Sanitary and Electrification-
Dadoing, Skirting, Flooring, Tiles work (All types)-
Railing and Grill fixing-
Electrification, Water supply and Sanitary Finishing-
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Fire prevention and fire fighting fitting and fixture with network-
Weather Proof work(tile,concrete)-
Painting-
Elevation work-
Internal and External work including landscapes as per santioned drawings-

Progress on shared amenities41

As on 14 Jan 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes-
Internal Roads & FootpathsYes-
Sewage and Drainage SystemYes-
Parks & Tree plantingYes-
Street LightingYes-
Provision for community buildings and for treatment and disposal of sewage and sullage waterYes-
Solid waste management and disposalYes-
Water conservationNoNot applicable
Energy managementYes-
Fire protection and fire safety requirementsYes-
Education/Health/Other public amenitiesYes-
Electricity supply transformer and substationYes-
Emergency Evacuation servicesYes-
Storm water drainsYes-
Use of renewable energyNoNot applicable
Water conservation/rain water harvesting/recharge of ground waterYes-
ElectricityYes-
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes-
Club HouseNoNot applicable
Community HallNoNot applicable
Outdoor Sports facilityYes-
Indoor Sports facilityYes-
Swimming PoolYes-
GymYes-
ParksYes-
Power BackupYes-
GasYes-
Water and SanitationYes-
Air Conditioning And incerntionYes-
StaircasesYes-
LiftsYes-
Staircases and Lift lobbies, corridor,lobbies, corridorYes-
Fire escapesYes-
Common entrance and exit for the building / common portico/foyer/verandahYes-
BasementYes-
TerraceYes-
Outer WallYes-
Open parking areas and common storage spacesYes-
Provision for lodging of management staff and security staffNoNot applicable
Water conservation and renewable energyNoNot applicable

Land and ownership1

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area20,275 sq m
Named landowners1
LandownerVillageDistrict
Brigade Tetrarch Private Limited--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 200.87 cr
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 189.50 cr-
On-site expenditure-Site OverheadRs 9.45 cr-
On-site expenditure-Cost Of Services(Water, Electricity, Sewage)Rs 1.14 cr-
On-site expenditure-Salaries of workersRs 45.83 lakh-
On-site expenditure-Consultants FeesRs 18.39 lakh-
Payment of taxesRs 12.28 lakh-
Payment of PremiumsRs 79,624-
Payment of cessRs 70,160-

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectM/s. Zachariah Consultants
EngineerVIJAY KUMAR S.B
Chartered AccountantR. Srinivasan

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed115

As listed on the registration, under the names the promoter filed them with; the newest 80 of 115 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1250/303/PR/230623/006018 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Aurum - Form 4 - Q3.pdf14 Jan 2026
Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Aurum - Form 5 - Q3.pdf14 Jan 2026
Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Aurum - Form 6 - Q3.pdf14 Jan 2026
Architect Certificate with COA NumberFile: Architect Certifiate with COA - KIADB & BBMP.pdf20 Jun 2023
Reply to RERA QueriesFile: Aurum - Brigade Reply to RERA Queries.pdf20 Jun 2023
RERA Bank AccountFile: RERA Bank Account.pdf12 Jun 2023
KIADB NotificationFile: Acquisition - KIADB - Notification.pdf12 Jun 2023
Title DocumentsFile: Title Documents.pdf12 Jun 2023
KIADB Allotment Letter - Plot Nos. R-5 & R-8File: KIADB - Allotment Letters.pdf12 Jun 2023
No LitigationFile: Affidavit - No litigation.pdf12 Jun 2023
Certified Carpet Area CalculationFile: Certified Carpet Area Statement.pdf12 Jun 2023
CDP Map showing Project SiteFile: CDP - Aurum Block.pdf12 Jun 2023
Village Map showing Project SiteFile: Brigade Eldorado - Village Map.pdf12 Jun 2023
Section 3(1) Notarized AffidavitFile: Affidavit - Section 3.pdf12 Jun 2023
Blown Up Plan - Aurum BlockFile: Blownup Plan.pdf12 Jun 2023
Sanctioned Floor PlansFile: Typical Floor Plans.pdf12 Jun 2023
STP PlanFile: STP Plan.pdf12 Jun 2023
STP ReportFile: STP Report.pdf12 Jun 2023
RERA Agreement to SellFile: Aurum at Brigade El Dorado - Agreement to Sell.pdf12 Jun 2023
Estimated Cost Breakup DetailsFile: Cost breakup - Aurum.pdf12 Jun 2023
Proforma Allotment LetterFile: Proforma allot - Aurum Block-RERA.pdf12 Jun 2023
Letter for BWSSBFile: Letter - BWSSB - Aurum.pdf12 Jun 2023
Registration CertificateFile: Certificate of Incorporation BTPL.pdf-
Organization StructureFile: Organisation Structure.pdf-
Certificate issued by CA Form 1File: Aurum - Form 4.pdf-
Certificate issued by Architect Form 2File: Aurum - Form 5.PDF-
Certificate issued by Engineer Form 3File: Aurum - Form 6.pdf-
Project Chartered Accountant-
Project Engineer-
Project Architect-
AffidavitFile: Affidavit - No litigation.pdf-
Certificate from Chartered AccountFile: Approval cost - Aurum.pdf-
Balance Sheet 2021 - 2022File: Balance Sheet - 2022-23.pdf-
Balance Sheet 2020 - 2021File: Balance Sheet - 2021-22.pdf-
Balance Sheet 2019 - 2020File: Balance Sheet - 2020-21 - CA UDIN.pdf-
Audited Profit and Loss Statement 2021 - 2022File: P & L 2022-23.pdf-
Audited Profit and Loss Statement 2020 - 2021File: Profit & Loss - 2021-22.pdf-
Audited Profit and Loss Statement 2019 - 2020File: Profit & Loss - 2020-21.pdf-
Director's Report 2021 - 2022File: Directors Report 2020-21.pdf-
Director's Report 2020 - 2021File: Directors Report 2020-21.pdf-
Director's Report 2019 - 2020File: Directors Report 2020-21.pdf-
Cash Flow Statement 2021 - 2022File: Cash Flow Statement - 2022-23.pdf-
Cash Flow Statement 2020 - 2021File: Cash Flow Statement - 2021-22.pdf-
Auditor's Report 2021 - 2022File: Auditors Report - 2022-23.pdf-
Auditor's Report 2020 - 2021File: Auditors Report - 2021-22_compressed.pdf-
Auditor's Report 2019 - 2020File: Auditors Report - 2020-21.pdf-
Income Tax Return Acknowledgement 2021 - 2022File: ITR 21-22.pdf-
Income Tax Return Acknowledgement 2020 - 2021File: ITR 20-21.pdf-
Income Tax Return Acknowledgement 2019 - 2020File: ITR 19-20.pdf-
Brigade El Dorado - Plan Sanction - Phase 2-
BESCOM NOC-
Site Plan-
Site Plan-
Typical Floor Plans-
Specification and Section-
Bldg 08 Tower A & L Section 01-
Specification - Aurum-
Bldg 08 Tower A & L Section 01-
Site Plan-
Brigade El Dorado - Title Opinion-
Lease cum Sale Agreement-
Combined PC and Khata1-
Combined PC and Khata1-
Title Documents-
Aurum at Brigade El Dorado - Agreement to Sell-
Proforma allot - Aurum Block-RERA-
Aurum at Brigade El Dorado - RERA Brochure-
Aurum - Form B-
Aurum - Notary Section 3-
BESCOM NOC-
Brigade El Dorado - Fire NOC-
AAI NOC-
Brigade El Dorado - CFE-
Brigade El Dorado - SEIAA-
BSNL NOC-
Brigade El Dorado - Revised Fire NOC-
TOWER-A STP REPORT-
STP Plan-
Aurum Block - Guideline Value-
Already registered project ongoing detailsFile: List of Ongoing Registered Projects.xlsx-

How this compares with Bengaluru Rural

20%of Bengaluru Rural projects moved their completion datethis one has not
0%of Bengaluru Rural registrations are shown as withdrawn or revokedthis one is not

Computed across the 650+ Bengaluru Rural projects on ReraGenie, from their own filings.

Keep Aurum at Brigade El Dorado on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Rural650+ in Bengaluru Rural

2 kmAurum at Brigade El DoraOther 18Dot size: filed unitsN

Filed coordinates, straight-line distance. 18 registered projects within 2 km.

Builder: Brigade Tetrarch Private Limited

Brigade Tetrarch Private Limited has 10 registrations on RERA Karnataka, including Jasper and Iridium at Brigade El Dorado and Aurum at Brigade El Dorado. Its filings declare 4 earlier projects, none of them declared completed. Read the full track record. See more projects on the Bengaluru Rural district page.

Frequently asked questions

What are my rights if Aurum at Brigade El Dorado is delayed beyond 31 Dec 2027?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Aurum at Brigade El Dorado?

The registered promoter entity is Brigade Tetrarch Private Limited, a company as per the filing. Its CIN U92412KA1995PTC018247 and GSTIN 29AAACT7266Q1ZG can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Aurum at Brigade El Dorado?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Aurum at Brigade El Dorado?

The professionals named in the filing: Architect: M/s. Zachariah Consultants; Engineer: VIJAY KUMAR S.B; Chartered Accountant: R. Srinivasan. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Aurum at Brigade El Dorado?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Aurum at Brigade El Dorado. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Aurum at Brigade El Dorado to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.