Home / Browse projects / Pune, Maharashtra / AUDUMBAR A1 A2
AUDUMBAR A1 A2
RG-MH-17450 · RERA P52100028767 · Last updated on MahaRERA portal: 4 Jul 2024
Source: official MahaRERA filing
Red flags
- 1 extension taken
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
- Allotment letter follows the model form
- Recorded completed on MahaRERA
1 condition is on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.
See what the report covers Free either way: or have every new Pune registration emailed to you, free during the pilot beta.Saved. When you are ready to decide, the Rs 499 buyer report reads the fine print for you.
AUDUMBAR A1 A2 is a Residential / Group Housing project by OM CHIDANAND DEVELOPERS in Pune, Maharashtra, registered with MahaRERA as P52100028767 on 30 Mar 2021. The registration is recorded completed; possession was promised by 1 Jun 2023.
At a glance
Project
- NameAUDUMBAR A1 A2
- TypeResidential / Group Housing
- Location
- NDA ROAD
- SHIVANE
- Shivne (Part)
- Haveli
- Pune
- 411023
- Pincode411023
- RERA no.P52100028767
- ReraGenie IDRG-MH-17450
Builder
- NameOM CHIDANAND DEVELOPERS
- Entity typePartnership
- PartnersRESHMA DYANESHWAR MORE, VRUSHALI DATTATRAYA CHOUDHARI, SWATI CHANDRAKANT CHOUDHARI
- Other registrations2 more →
- Completed1 of 3
Key dates
Key facts
Registration and timeline
- StatusCompleted
- Registered on30 Mar 2021
- Promised completion1 Jun 2023
- Revised completionNone
- Buildings1 building record
- Documents filed72 files
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| AUDUMBAR A1 A2 | NA | 10 | 0 | 0 | 0 | 0 |
The full filing
Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.
Construction progress by building1
As on 4 Jul 2024, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
4 of 11 construction stages are filed complete. The stage furthest along is Internal walls, at 80%.
AUDUMBAR A1 A2: 59% average across the applicable activities
| Activity | Progress |
|---|---|
| Excavation | 100% |
| Basement (if any) | 100% |
| Podiums (if any) | 100% |
| Plinth | 100% |
| Stilt Floor | 0% |
| Slabs of Super Structure | 9% |
| Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises | 80% |
| Sanitary Fittings within the flats / premises | 0% |
| Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks | 80% |
| External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing. | 80% |
| Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale. | 0% |
Progress on shared amenities15
As on 4 Jul 2024, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Internal Roads & Footpaths | Yes | 0% |
| Water Supply | Yes | 0% |
| Sewerage (Chamber, Lines, Septic Tank , STP) | Yes | 0% |
| Storm Water Drains | Yes | 0% |
| Landscaping & Tree Planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Community Buildings | No | Not applicable |
| Treatment And Disposal Of Sewage And Sullage Water | Yes | 0% |
| Solid Waste Management And Disposal | Yes | 0% |
| Water conservation /Rain water harvesting | Yes | 0% |
| Energy managemcnt | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Electrical meter room, sub-station, receiving station | Yes | 0% |
| Aggregate area of recreational Open Space | No | Not applicable |
| Open Parking | No | Not applicable |
Land and ownership3
MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| OM CHIDANAND DEVELOPERS | Shivne (Part) | Pune |
| GIRISH DANGAT | Shivne (Part) | Pune |
| RAJESH DANGAT | Shivne (Part) | Pune |
Approvals and building plan
Project account and cost
70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.
Certifying professionals and partners3
Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | WALHEKAR AND ASSOCIATES |
| Engineer | G A BHILARE CONSULTANTS PVT LTD |
| Chartered Accountant | S S SHETYE AND ASSOCIATES |
| Partner | Role in project |
|---|---|
| OM CHIDANAND DEVELOPERS | - |
Extensions applied for1
A revised date filed with the regulator does not change the possession date in your agreement for sale.
Reason as filed by the promoterDue to COVID-19 pandemic, the regular flow of work is hampered on account of unavailability of labour on regular basis
Complaints filed with MahaRERA
No complaints on record against this registration.
The permission chain
The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.
- Legal title reportOn the file
A lawyer's report on who owns the land and what is registered against it.
uploaded 24 Mar 2021 - Layout approvalOn the file
The planning authority's approval of how the plots and buildings sit on the land.
uploaded 31 Jan 2022 - Building plan approvalOn the file
Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.
uploaded 25 Mar 2021 - Commencement CertificateOn the file
Permission to begin construction. On a plotted development the same slot carries the NA order instead.
uploaded 29 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying. - Occupancy CertificateOn the file
The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.
uploaded 27 Jun 2024
Documents filed72
As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Architect’s Certificate on Completion of Project (Form 4)File: Form - 4.pdf | 4 Jul 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Full Occupancy certficate shivane.pdf | 27 Jun 2024 |
| Occupancy Certificate/ Completion Certificate/ Architect's certificate of completion for plotted developmentFile: Complitionletter.pdf | 27 Jul 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: Form 2A March2021.pdf | 2 Jun 2023 |
| Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: Form 2A March2022.pdf | 2 Jun 2023 |
| Declaration in FORM BFile: Form B (1).pdf | 20 May 2023 |
| Disclosure of sold/ booked inventoryFile: Dusclosure of sold and Booked inventory (1).pdf | 2 May 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 20-21.pdf | 11 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q1 31-06-21.pdf | 11 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q2 31-09-21.pdf | 11 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q3 31-12-21.pdf | 11 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: FORM 1 Q4 31-03-22.pdf | 11 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 1 20-21.pdf | 11 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 1 Q1 31-06-21.pdf | 11 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 1 Q2 31-09-21.pdf | 11 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: FORM 1 Q3 31-12-21.pdf | 11 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form 20 to 21.pdf | 11 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form 2 Q1 30-06-21.pdf | 11 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form 2 Q2 30-09-21.pdf | 11 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form 2 Q3 31-12-21.pdf | 11 Apr 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Engineer Form 2 Q4 31-3-22.pdf | 11 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: From 3 31-03-2021.pdf | 11 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 30-06-21.pdf | 11 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 30-9-21.pdf | 11 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 31-12-21.pdf | 11 Apr 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3 31-03-2022.pdf | 11 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: From 5 31-03-2021.pdf | 11 Apr 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM 5 31-03-22.pdf | 11 Apr 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: From1ArchitectureCertificate.pdf | 21 Feb 2023 |
| Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ArchitectF184.pdf | 21 Feb 2023 |
| Engineer’s Certificate on Cost Incurred on Project (Form 2)File: EngineerForm2.pdf | 21 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: Form3.pdf | 21 Feb 2023 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CAForm384.pdf | 21 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: ITR2122.pdf | 21 Feb 2023 |
| Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: ITR2223.pdf | 21 Feb 2023 |
| Layout approvalFile: plan0102Layout.pdf | 31 Jan 2022 |
| Layout approvalFile: plan0202 PRK.pdf | 31 Jan 2022 |
| Layout approvalFile: plan0106GPL.pdf | 31 Jan 2022 |
| Layout approvalFile: plan0206 BP Layout.pdf | 31 Jan 2022 |
| Layout approvalFile: plan0306 A1A2 FP.pdf | 31 Jan 2022 |
| Layout approvalFile: plan0406A1A2 6th Floor Plan.pdf | 31 Jan 2022 |
| Layout approvalFile: plan0506B1 B2 FP.pdf | 31 Jan 2022 |
| Copy of Layout Approval (in case of layout)File: plan0102Layout.pdf | 31 Jan 2022 |
| Copy of Layout Approval (in case of layout)File: plan0202 PRK.pdf | 31 Jan 2022 |
| Copy of Layout Approval (in case of layout)File: plan0106GPL.pdf | 31 Jan 2022 |
| Copy of Layout Approval (in case of layout)File: plan0206 BP Layout.pdf | 31 Jan 2022 |
| Copy of Layout Approval (in case of layout)File: plan0306 A1A2 FP.pdf | 31 Jan 2022 |
| Copy of Layout Approval (in case of layout)File: plan0406A1A2 6th Floor Plan.pdf | 31 Jan 2022 |
| Copy of Layout Approval (in case of layout)File: plan0506B1 B2 FP.pdf | 31 Jan 2022 |
| Declaration about Commencement CertificateFile: CC15-11.pdf | 31 Jan 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: CC 10-6.pdf | 29 Jan 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: CC15-11.pdf | 29 Jan 2022 |
| Commencement Certificates / NA Order for plotted developmentFile: CC15-11.pdf | 29 Jan 2022 |
| Layout approvalFile: Main Layout PMC_compressed.pdf | 25 Mar 2021 |
| Building plan approvalFile: NA order.pdf | 25 Mar 2021 |
| Copy of Layout Approval (in case of layout)File: Main Layout PMC_compressed.pdf | 25 Mar 2021 |
| Building Plan Approval / NA Order for plotted developmentFile: NA order.pdf | 25 Mar 2021 |
| CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Form 3-compressed.pdf | 25 Mar 2021 |
| Proforma of Allotment letterFile: Profoma.pdf | 25 Mar 2021 |
| Layout approvalFile: Layout 2-5.pdf | 24 Mar 2021 |
| Layout approvalFile: Layout 3-5.pdf | 24 Mar 2021 |
| PAN CardFile: Pan Card.pdf | 24 Mar 2021 |
| Copy of the legal title reportFile: Title and search report 2.pdf | 24 Mar 2021 |
| Copy of the legal title reportFile: Title and search report 3.pdf | 24 Mar 2021 |
| Copy of the legal title reportFile: Title and search report 4.pdf | 24 Mar 2021 |
| Copy of the legal title reportFile: Title and search report 5.pdf | 24 Mar 2021 |
| Details of encumbrancesFile: Encumbrance.pdf | 24 Mar 2021 |
| Copy of Layout Approval (in case of layout)File: Layout 2-5.pdf | 24 Mar 2021 |
| Copy of Layout Approval (in case of layout)File: Layout 3-5.pdf | 24 Mar 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Commincement Certificates 2 sign.pdf | 24 Mar 2021 |
| Commencement Certificates / NA Order for plotted developmentFile: Commincement Certificates 3 sign.pdf | 24 Mar 2021 |
| Declaration in FORM BFile: Form B.pdf | 24 Mar 2021 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Pune
Computed across the 13,700+ Pune projects on ReraGenie, from their own filings.
Free monthly report: Pune on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.
Buyer report
Useful on a completed registration when you are buying resale, or checking what was promised against what was delivered.
- 1 condition on this project's record read and explained, with the clear checks alongside
- Joined against the promoter's 2 other registrations, which the RERA portal never shows together
- All 72 filed documents as one ZIP, foldered, with a manifest
Keep AUDUMBAR A1 A2 on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near SHIVANE13,700+ in Pune
Mont Vert Kingstown Sector 1 Residential Wings
Niraj Kumar Associates Pvt Ltd
RANJAI
Shinde & Patil Construction
SAI NISARG
SHRI SAI SHRADDHA DEVELOPERS
ANSHRAJ ICON
VIJAY DEVELOPERS
Belview
Tranquil Infratech LLP
Audumbar Nest A1 A2 and B Building
Om Chidanand Developers
Builder: OM CHIDANAND DEVELOPERS
OM CHIDANAND DEVELOPERS has 3 registrations on MahaRERA, including AUDUMBAR A1 A2 and Audumbar Nest. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Pune district page.
Frequently asked questions
What are my rights if AUDUMBAR A1 A2 is delayed beyond 1 Jun 2023?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.
How do I verify and contact the developer of AUDUMBAR A1 A2?
The registered promoter entity is OM CHIDANAND DEVELOPERS, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.
Is my payment protected in AUDUMBAR A1 A2?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
How current is the construction progress shown for AUDUMBAR A1 A2?
Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.
Who certifies construction progress at AUDUMBAR A1 A2?
The professionals named in the filing: Architect: WALHEKAR AND ASSOCIATES; Engineer: G A BHILARE CONSULTANTS PVT LTD; Chartered Accountant: S S SHETYE AND ASSOCIATES. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in AUDUMBAR A1 A2?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.
Get the buyer report · Rs 499 See a real one first
Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.
Report an error Share feedback