ReraGenieLog inGet a buyer report

Home / Browse projects / Sindhudurg, Maharashtra / ATHARVA PARADISE

Completed No litigation declared Residential / Group Housing project

ATHARVA PARADISE

By ATHARVA LIFESPACES LLP

RG-MH-30787 · RERA P52900032699 · Last updated on MahaRERA portal: 17 Nov 2025

Source: official MahaRERA filing

Red flags

  • Completion date moved by 22 months
  • 1 extension taken

Clear

  • No litigation declared
  • No complaints on record
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • Recorded completed on MahaRERA

2 conditions are on this record. What each one means for someone buying here, and what the promoter's own filed documents say behind it, is what the buyer report adds.

See what the report covers Free either way: or have every new Sindhudurg registration emailed to you, free during the pilot beta.
Oct 2025Possession promisedregistration recorded completed
11 of 11Construction stages doneevery applicable stage filed complete
7 of 18Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 43 documents Report an error

ATHARVA PARADISE is a Residential / Group Housing project by ATHARVA LIFESPACES LLP in Sindhudurg, Maharashtra, registered with MahaRERA as P52900032699 on 24 Jan 2022. The registration is recorded completed; possession was promised by 31 Oct 2025. The completion date has moved by 22 months from the original filing. 11 of the 18 units on this registration are recorded sold or booked, and 11 of 11 construction stages are filed complete.

At a glance

Project

  • NameATHARVA PARADISE
  • TypeResidential / Group Housing
  • Location
    • JAMSANDE
    • Devgad
    • Sindhudurg
    • 416612
  • Pincode416612
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.P52900032699
  • ReraGenie IDRG-MH-30787

Builder

  • NameATHARVA LIFESPACES LLP
  • Entity typePartnership
  • PartnersVASANT BALAVANT RANE, GANESH VILASRAO RANE, SANTOSH JAYRAM ANJARLEKAR

Key dates

this monthRegisteredJan 2022First promiseDec 2023Revised toOct 2025Recorded completed

Key facts

Registration and timeline

  • StatusCompleted
  • Registered on24 Jan 2022
  • Promised completion31 Oct 2025
  • Revised completionRevised to 31 Oct 2025 (originally 31 Dec 2023)
  • Buildings1 building record
  • Documents filed43 files

Current status

61%11 of 18 units booked
59.6%Work done, per cost certificate

Figures as on 17 Nov 2025, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ATHARVA PARADISENA6518018

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building1

As on 17 Nov 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

11 of 11 construction stages are filed complete.

ATHARVA PARADISE: 100% average across the applicable activities

ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure100%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises100%
Sanitary Fittings within the flats / premises100%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks100%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.100%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.100%

Progress on shared amenities15

As on 17 Nov 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsYes100%
Water SupplyYes100%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes100%
Storm Water DrainsYes100%
Landscaping & Tree PlantingYes100%
Street LightingYes100%
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes100%
Water conservation /Rain water harvestingNoNot applicable
Energy managemcntYes100%
Fire protection and fire safety requirementsYes100%
Electrical meter room, sub-station, receiving stationYes100%
Aggregate area of recreational Open SpaceYes100%
Open ParkingYes0%

Parking filed6

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots6
Closed/Covered1
Open Space5

Land and ownership

Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area1,258 sq m
Land owned byThe promoter
Named landownersNone
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on31 Oct 2025

Approvals and building plan

Sanctioning authorityDevgad - Jamsande Nagar Panchayat
Permissible FSI1132.11
Proposed, not sanctioned1,132 sq m
Buildings approved1
Buildings sanctioned1

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchKANDIVALI LINK ROAD
Estimated costRs 2.14 cr
Cost incurredRs 1.28 cr
Work done59.65%
BuildingWingEstimatedIncurred
ATHARVA PARADISENARs 2.14 crRs 1.28 cr

Certifying professionals and partners5

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectGAURAV UDAY KULKARNI
EngineerRAKESH ARJUN KOCHAREKAR
Chartered AccountantA K Anand & Co
Chartered AccountantR H Pothiwal & Associates
Chartered AccountantSachin K. Mishra & Co.
PartnerRole in project
ATHARVA LIFESPACES LLP-

Extensions applied for1

A revised date filed with the regulator does not change the possession date in your agreement for sale.

EXT52900018531Dec 2023 → Oct 2025

Reason as filed by the promoterTo obtain the Occupancy Certificate from Competent Authority we request an extension till 31st October 2025.

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 15 Jan 2022
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 13 Oct 2021
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 13 Oct 2021
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 15 Jan 2022Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot on the file

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

Documents filed43

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: Form 1_Oct 25.pdf17 Nov 2025
Withdrawal Update Form 2File: Form 2_Oct 25.pdf17 Nov 2025
Withdrawal Update Form 3File: CA Certificate_Oct 25.pdf17 Nov 2025
Occupational CertificateFile: OC.pdf17 Nov 2025
Occupational CertificateFile: Architect Certificate -Form 4.pdf17 Nov 2025
Withdrawal Update Form 1File: Form 1_Sep 25.pdf5 Nov 2025
Withdrawal Update Form 1File: Form 1_Sep 25.pdf5 Nov 2025
Withdrawal Update Form 2File: Form 2_Sep 25.pdf5 Nov 2025
Withdrawal Update Form 2File: Form 2_Sep 25.pdf5 Nov 2025
Withdrawal Update Form 3File: CA Certificate - Sep 25.pdf5 Nov 2025
Withdrawal Update Form 3File: Form 3_Sep 25.pdf5 Nov 2025
Form 5 (FY 2021-2022)File: Form 5 2021-22.pdf5 Nov 2025
Form 5 (FY 2022-2023)File: Form 5 2022-23.pdf5 Nov 2025
Form 5 (FY 2023-2024)File: Form 5 2023-24.pdf5 Nov 2025
Form 1File: Form 1_March 25.pdf4 Nov 2025
Form 2File: Form 2_March 25.pdf4 Nov 2025
Form 3File: Form 3_March 25.pdf4 Nov 2025
Disclosure of Sold and Booked InventoryFile: Disclosure_March 25.pdf4 Nov 2025
Withdrawal Update Form 1File: Form 1_June 25.pdf4 Nov 2025
Withdrawal Update Form 1File: Form 1_Sep 25.pdf4 Nov 2025
Withdrawal Update Form 2File: Form 2_June 25.pdf4 Nov 2025
Withdrawal Update Form 2File: Form 2_Sep 25.pdf4 Nov 2025
Withdrawal Update Form 3File: Form 3_June 25.pdf4 Nov 2025
Withdrawal Update Form 3File: Form 3_Sep 25.pdf4 Nov 2025
Form 2A (FY 2021-2022)File: Form 2A FY-2021-22.pdf4 Nov 2025
Form 2A (FY 2022-2023)File: Form 2A FY-2022-23.pdf4 Nov 2025
Form 2A (FY 2023-2024)File: Form 2A FY-2023-24.pdf4 Nov 2025
Form 2A (FY 2024-2025)File: Form 2A FY-2024-25.pdf4 Nov 2025
Copy of the legal title reportFile: Legal Title Report_Compressed.pdf15 Jan 2022
Commencement Certificates / NA Order for plotted developmentFile: CC_Compressed.pdf15 Jan 2022
CERSAI detailsFile: CERSAI_Search_Report.pdf4 Jan 2022
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: architect certificate.pdf7 Dec 2021
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: Structure Certificate.pdf7 Dec 2021
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CA Certificate.pdf7 Dec 2021
Proforma of Allotment letterFile: ALLOTMENT LETTER DRAFT.pdf7 Dec 2021
Layout approvalFile: Binder6_Compressed.pdf13 Oct 2021
Building plan approvalFile: Binder6_Compressed.pdf13 Oct 2021
Copy of Layout Approval (in case of layout)File: Binder6_Compressed.pdf13 Oct 2021
Building Plan Approval / NA Order for plotted developmentFile: Binder6_Compressed.pdf13 Oct 2021
Declaration about Commencement CertificateFile: format d.pdf13 Oct 2021
Declaration in FORM BFile: RERA Declaration_Compressed.pdf13 Oct 2021
PAN CardFile: Atharva Lifespaces PAN.pdf12 Oct 2021
Details of encumbrancesFile: encumbrances.pdf12 Oct 2021

How this compares with Sindhudurg

61%of this project is bookeddistrict median 15%
21%of Sindhudurg projects moved their completion datethis one moved by 22 months
30%of Sindhudurg registrations have lapsed or been cancelledthis one is completed

Computed across the 530+ Sindhudurg projects on ReraGenie, from their own filings.

Keep ATHARVA PARADISE on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near JAMSANDE530+ in Sindhudurg

2 kmATHARVA PARADISECompleted 4Lapsed / revoked 1Other 5Dot size: filed unitsN

Filed coordinates, straight-line distance. 10 registered projects within 2 km.

Builder: ATHARVA LIFESPACES LLP

ATHARVA LIFESPACES LLP has 1 registration on MahaRERA, including ATHARVA PARADISE. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Sindhudurg district page.

Frequently asked questions

What are my rights if ATHARVA PARADISE is delayed beyond 31 Oct 2025?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ATHARVA PARADISE?

The registered promoter entity is ATHARVA LIFESPACES LLP, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ATHARVA PARADISE?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ATHARVA PARADISE?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ATHARVA PARADISE?

The professionals named in the filing: Architect: GAURAV UDAY KULKARNI; Engineer: RAKESH ARJUN KOCHAREKAR; Chartered Accountant: A K Anand & Co; Chartered Accountant: R H Pothiwal & Associates; Chartered Accountant: Sachin K. Mishra & Co.. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ATHARVA PARADISE?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; why the completion date was revised and what the new timeline depends on. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ATHARVA PARADISE. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ATHARVA PARADISE to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.