Red flags

  • Litigation declared, 4 cases

Clear

  • No complaints on record
  • Completion date never moved
  • Separate project account declared
Mar 2031Possession promisedno revision filed
2 of 18Construction stages donefurthest along: Upto Plinth Level, 35%
249 of 264Units unsoldnot recorded sold or booked
0Complaints at RERA Karnatakaon this registration
Jump to the 333 documents Report an error

Assetz Mizumi Reserve Tower A3 A5 is a Residential/Group Housing project by APG COMMUNITY DEVELOPMENT PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/308/PR/130526/008650 on 13 May 2026. Possession is promised by 31 Mar 2031. 15 of the 264 units on this registration are recorded sold or booked, and 2 of 18 construction stages are filed complete.

At a glance

Project

  • NameAssetz Mizumi Reserve Tower A3 A5
  • TypeResidential/Group Housing
  • Location
    • Anekal
    • Bengaluru Urban
    • 560068
  • Pincode560068
  • MapView location on Google Maps (as filed on RERA)
  • RERA no.PRM/KA/RERA/1251/308/PR/130526/008650
  • ReraGenie IDRG-KA-27570

Builder

  • NameAPG COMMUNITY DEVELOPMENT PRIVATE LIMITED
  • Entity typeCompany
  • CINU45203KA2014PTC077653
  • GSTIN29AANCA1479M1ZZ
  • Authorized SignatoryAkshay Kishore Dewani
  • CeoAkshay Kishore Dewani
  • DirectorsAkshay Kishore Dewani, Sanjay Sudhakar Torgal
  • Project HeadGurumurthy N
  • Other registrations1 more →

Key dates

this monthRegisteredMay 2026PromisedMar 2031

Key facts

Registration and timeline

  • StatusRegistration approved
  • Registered on13 May 2026
  • Promised completion31 Mar 2031
  • Revised completionNone
  • Buildings2 building records
  • Documents filed333 files

Current status

6%15 of 264 units booked
19.8%Of the estimated cost spent so far

Figures as on 15 Oct 2026, this project's latest RERA Karnataka filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
TOWER 3---1760176
Tower 5---88088

The full filing

Everything below is from the project's own RERA Karnataka filing, free to read.

Construction progress by building1

As on 15 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 18 construction stages are filed complete. The stage furthest along is Upto Plinth Level, at 35%.

Building: 14% average across the applicable activities

ActivityProgress
Earth work and other leveling preparation work100%
Foundation footing work100%
Upto Plinth Level35%
Sub-structure flooring (Parking Floor, more than one floor below general ground level)0%
Retaining wall (All types)10%
RCC or MS Framed structure0%
Masonry Construction0%
Plastering inside , outside & Ceiling0%
Joinery: Doors, Windows, Ventilators etc0%
Basic work of Water supply, Sanitary and Electrification0%
Dadoing, Skirting, Flooring, Tiles work (All types)0%
Railing and Grill fixing0%
Electrification, Water supply and Sanitary Finishing0%
Painting0%
Fire prevention and fire fighting fitting and fixture with network0%
Weather Proof work(tile,concrete)0%
Wardrobe, Showcase, Kitchen cabinet, Puja workNot applicable
Elevation work0%
Internal and External work including landscapes as per sanctioned drawings0%

Progress on shared amenities40

As on 15 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Water SupplyYes0%
Sewage and Drainage SystemYes0%
Water conservation/rain water harvesting/recharge of ground waterYes0%
Energy managementNoNot applicable
Fire protection and fire safety requirementsYes0%
Solid waste management and disposalYes0%
Emergency Evacuation servicesYes0%
Internal Roads & FootpathsYes0%
Electricity supply transformer and substationYes0%
Storm water drainsYes0%
Use of renewable energyNoNot applicable
Sewage Treatment Plant (STP)Yes0%
Parks & Tree plantingYes0%
Street LightingYes0%
ElectricityYes0%
Smart Home AutomationNoNot applicable
CCTV SurveillanceYes0%
Club HouseYes0%
Community HallYes0%
Outdoor Sports facilityYes0%
Indoor Sports facilityYes0%
Swimming PoolYes0%
GymYes0%
ParksYes0%
Power BackupYes0%
Piped GasNoNot applicable
Water and SanitationYes0%
Air ConditioningYes0%
StaircasesYes0%
LiftsYes0%
Corridor/LobbiesYes0%
Fire escapesYes0%
Common entrance and exit for the building/common portico/foyer/verandahYes0%
BasementYes0%
TerraceYes0%
Outer WallYes0%
Open parking areasYes0%
Provision for lodging of management staff and security staffYes0%
Water conservation and renewable energyYes0%
Common storage spacesNoNot applicable

Land and ownership26

This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area7,494 sq m
Named landowners26
LandownerVillageDistrict
Mrs. Shilpa Rama Ganesh--
Mrs. Shilpa Rama Ganesh--
Sri. Priya Krishna--
Jayamma--
Sri. Priya Krishna--
Sri. Priya Krishna--
Raju--
Arun Kumar--
Arun Kumar--
Arun Kumar--
Raju--
Sri. PriyaKrishna--
Arun Kumar--
Sri. Priya Krishna--
Arun Kumar--
Sri. PriyaKrishna--
Pradeep Krishnappa--
Sri. Priya Krishna--
N. Girish Kumar--
Mr. G. R. Byresh--
Sri. Ramesh--
Sri. Priya Krishna--
Sri. Ramesh--
Mr Naveen Reddy--
Mr. Prathap Reddy--
Mr. G. R. Byresh--

Project account and cost

70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Estimated costRs 260.05 cr
Cost incurredRs 51.44 cr
Spent of the estimate19.78%
Cost lineEstimatedIncurred
Estimated Cost of Construction as certified by EngineerRs 206.63 crRs 27.03 cr
On-site expenditure-Site OverheadRs 17.75 crRs 7.97 cr
ApprovalRs 17.16 crRs 5.18 cr
Principal sum and interest payable to financial institutions-Scheduled BanksRs 13.76 crRs 10.62 cr
On-site expenditure-Consultants FeesRs 4.74 crRs 63.81 lakh

Certifying professionals and partners3

Certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectSandeep Rajendran
EngineerB E Pruthviraja
Chartered AccountantY S Shetty & Company

Litigation declared4

CaseCourtStatus
O.S. No. 109 of 2006Senior Civil Judge, Anekal-
O.S. No. 25577 of 2023City Civil Judge, Mayo Hall-
O.S. No. 5489 of 2024Principal City Civil & Sessions Judge, Bengaluru-
O.S. NO. 157 OF 2012Principal Senior Civil Judge, Anekal-

Complaints filed with RERA Karnataka

No complaints on record against this registration.

Documents filed333

As listed on the registration, under the names the promoter filed them with; the newest 80 of 333 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/308/PR/130526/008650 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form -4 Chartered Assetz Mizumi Reserve Tower A3 A5.pdf15 Oct 2026
Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architect Assetz Mizumi Reserve Tower A3 A5.pdf15 Oct 2026
Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form -6 Engineer Assetz Mizumi Reserve Tower A3 A5.pdf15 Oct 2026
Q2 2026-27 Water supply and sewage board15 Oct 2026
Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Oct 2026
Q2 2026-27 KSPCB- MOEF (Above 50 Acres)15 Oct 2026
Q2 2026-27 KPTCL- BESCOM15 Oct 2026
Q2 2026-27 Fire and Safety15 Oct 2026
Q2 2026-27 Airport Authority of India15 Oct 2026
Q2 2026-27 BSNL/Telecommunication Department15 Oct 2026
Q2 2026-27 Preventive Order (Injunction / Interim Order / Final Order / Stay OrderFile: Disposal order dated 06 07 2026.pdf15 Oct 2026
Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form -4 Chartered Assetz Mizumi Reserve Tower A3 A5.pdf15 Jul 2026
Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architect Assetz Mizumi Reserve Tower A3 A5.pdf15 Jul 2026
Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form -6 Engineer Assetz Mizumi Reserve Tower A3 A5.pdf15 Jul 2026
Q1 2026-27 Water supply and sewage board15 Jul 2026
Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres)15 Jul 2026
Q1 2026-27 KSPCB- MOEF (Above 50 Acres)15 Jul 2026
Q1 2026-27 KPTCL- BESCOM15 Jul 2026
Q1 2026-27 Fire and Safety15 Jul 2026
Q1 2026-27 Airport Authority of India15 Jul 2026
Q1 2026-27 BSNL/Telecommunication Department15 Jul 2026
Q1 2026-27 Preventive Order (Injunction / Interim Order / Final Order / Stay OrderFile: Disposal order dated 06.07.2026.pdf15 Jul 2026
Clarification regarding Loan deposited in 70% accountFile: Annexure 1-Clarification regarding Loan deposited in 70% account.pdf8 May 2026
Sources of FundFile: Annexure 2-Sources of Fund.pdf8 May 2026
Advocate Search Report Sy No 5-1File: Annexure 3A- Advocate Search Report Sy No 5-1.pdf8 May 2026
Advocate Search Report Sy No 5-4File: Annexure 3B- Advocate Search Report Sy No 5-4.pdf8 May 2026
Advocate Search Report Sy No 5-5File: Annexure 3C- Advocate Search Report Sy No 5-5.pdf8 May 2026
Advocate Search Report Sy No 6File: Annexure 3D- Advocate Search Report Sy No 6.pdf8 May 2026
Advocate Search Report Sy No 7File: Annexure 3E- Advocate Search Report Sy No 7.pdf8 May 2026
Advocate Search Report Sy No 8-1File: Annexure 3F- Advocate Search Report Sy No 8-1.pdf8 May 2026
Advocate Search Report Sy No 8-4File: Annexure 3G- Advocate Search Report Sy No 8-4.pdf8 May 2026
Advocate Search Report Sy No 8-5File: Annexure 3H- Advocate Search Report Sy No 8-5.pdf8 May 2026
Advocate Search Report Sy No 173-1File: Annexure 3I- Advocate Search Report Sy No 173-1.pdf8 May 2026
Advocate Search Report Sy No 173-2File: Annexure 3J- Advocate Search Report Sy No 173-2.pdf8 May 2026
Advocate Search Report Sy No 175File: Annexure 3K- Advocate Search Report Sy No 175.pdf8 May 2026
Advocate Search Report Sy No 177-1File: Annexure 3K- Advocate Search Report Sy No 177-1.pdf8 May 2026
Advocate Search Report Sy No 176File: Annexure 3L- Advocate Search Report Sy No 176.pdf8 May 2026
Advocate Search Report Sy No 177-1-1File: Annexure 3M- Advocate Search Report Sy No 177-1-1.pdf8 May 2026
Advocate Search Report Sy No 177-2File: Annexure 3N- Advocate Search Report Sy No 177-2.pdf8 May 2026
Advocate Search Report Sy No 178File: Annexure 3O- Advocate Search Report Sy No 178.pdf8 May 2026
Advocate Search Report Sy No 179-1File: Annexure 3P- Advocate Search Report Sy No 179-1.pdf8 May 2026
Advocate Search Report Sy No 179-2File: Annexure 3Q- Advocate Search Report Sy No 179-2.pdf8 May 2026
Advocate Search Report Sy No 179-2File: Annexure 3Q- Advocate Search Report Sy No 179-2.pdf8 May 2026
Advocate Search Report Sy No 180-1File: Annexure 3R- Advocate Search Report Sy No 180-1.pdf8 May 2026
Advocate Search Report Sy No 180-2File: Annexure 3S- Advocate Search Report Sy No 180-2.pdf8 May 2026
Advocate Search Report Sy No 180-3File: Annexure 3T- Advocate Search Report Sy No 180-3.pdf8 May 2026
Advocate Search Report Sy No 187-1File: Annexure 3U- Advocate Search Report Sy No 187-1.pdf8 May 2026
Advocate Search Report Sy No 187-1File: Annexure 3V-Advocate Search Report Sy No 203.pdf8 May 2026
Commencement CertificateFile: Annexure 4-Commencement Certificate.pdf8 May 2026
Clarification regarding Unit deatails as KSPCB and Sanctioned PlanFile: Annexure 5-Clarification regarding Unit deatails as KSPCB and Sanctioned Plan.pdf8 May 2026
Clarifications regarding Area in KSPCB NOCFile: Annexure 6-Clarifications regarding Area in KSPCB NOC.pdf8 May 2026
Details of facilities ProvidedFile: Annexure 7-Details of facilities Provided.pdf8 May 2026
Clarification regarding Car parkingFile: Annexure 8-Clarification regarding Car parking.pdf8 May 2026
Clarification regarding update the amenties and common AreaFile: Annexure 9-Clarification regarding update the amenties and common Area.pdf8 May 2026
Amenities DeclarationFile: Annexure 10-Amenities Declaration.pdf8 May 2026
Self Attested engineer and Adhar who signed form 3File: Annexure 11-Self Attested engineer and Adhar who signed form 3.pdf8 May 2026
BESCOM NOC WITH PAID RECEIPTFile: Annexure 12-BESCOM NOC WITH PAID RECEIPT.pdf8 May 2026
Updated ATS with payment planFile: Annexure 13-Updated ATS with payment plan.pdf8 May 2026
RTC, survey 5-4-
Mutation, survey 5-4-
Encumbrance Certificate, survey 5-4-
Conversion/Alienation Order, survey 5-4-
Sale/Title/Gift Deed, survey 5-4-
JDA, survey 5-4-
Khatha, survey 5-4-
RTC, survey 5-5-
Mutation, survey 5-5-
Encumbrance Certificate, survey 5-5-
Conversion/Alienation Order, survey 5-5-
Sale/Title/Gift Deed, survey 5-5-
JDA, survey 5-5-
Khatha, survey 5-5-
RTC, survey 173-1-
Mutation, survey 173-1-
Encumbrance Certificate, survey 173-1-
Conversion/Alienation Order, survey 173-1-
Sale/Title/Gift Deed, survey 173-1-
JDA, survey 173-1-
Khatha, survey 173-1-
RTC, survey 173-2-

How this compares with Bengaluru Urban

6%of this project is bookeddistrict median 51%
34%of Bengaluru Urban projects moved their completion datethis one has not
1%of Bengaluru Urban registrations are shown as withdrawn or revokedthis one is not

Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.

Keep Assetz Mizumi Reserve Tower A3 A5 on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

Other projects near Bengaluru Urban4,100+ in Bengaluru Urban

2 kmAssetz Mizumi Reserve ToOther 20Dot size: filed unitsN

Filed coordinates, straight-line distance. 20 registered projects within 2 km.

Builder: APG COMMUNITY DEVELOPMENT PRIVATE LIMITED

APG COMMUNITY DEVELOPMENT PRIVATE LIMITED has 2 registrations on RERA Karnataka, including Assetz Mizumi Reserve Tower A3 A5 and Assetz Mizumi Reserve Tower A1 A2 A4. Its filings disclose no earlier RERA Karnataka projects. Litigation is declared on 2 of its registrations. Read the full track record. See more projects on the Bengaluru Urban district page.

Frequently asked questions

What are my rights if Assetz Mizumi Reserve Tower A3 A5 is delayed beyond 31 Mar 2031?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.

How do I verify and contact the developer of Assetz Mizumi Reserve Tower A3 A5?

The registered promoter entity is APG COMMUNITY DEVELOPMENT PRIVATE LIMITED, a company as per the filing. Its CIN U45203KA2014PTC077653 and GSTIN 29AANCA1479M1ZZ can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.

Is my payment protected in Assetz Mizumi Reserve Tower A3 A5?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

Who certifies construction progress at Assetz Mizumi Reserve Tower A3 A5?

The professionals named in the filing: Architect: Sandeep Rajendran; Engineer: B E Pruthviraja; Chartered Accountant: Y S Shetty & Company. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in Assetz Mizumi Reserve Tower A3 A5?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; how the declared litigation on this registration affects your risk; whether construction progress keeps pace with sales in the coming quarters.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.

Report an error Share feedback

Report an error or share feedback

About Assetz Mizumi Reserve Tower A3 A5. Everything on this page comes from what the promoter filed on RERA Karnataka, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save Assetz Mizumi Reserve Tower A3 A5 to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.