Home / Browse projects / Bengaluru Urban, Karnataka / Assetz Canvas & Cove 2.0 - Block A
Assetz Canvas & Cove 2.0 - Block A
By APG HABITAT PRIVATE LIMITED
RG-KA-59540 · RERA PRM/KA/RERA/1251/310/PR/020824/006955 · Last updated on RERA Karnataka portal: 14 Oct 2026
Source: official RERA Karnataka filing
Red flags
- No red flags in this filing
Clear
- No litigation declared
- No complaints on record
- Completion date never moved
- Separate project account declared
Saved.
Assetz Canvas & Cove 2.0 - Block A is a Residential/Group Housing project by APG HABITAT PRIVATE LIMITED in Bengaluru Urban, Karnataka, registered with RERA Karnataka as PRM/KA/RERA/1251/310/PR/020824/006955 on 2 Aug 2024. Possession is promised by 30 Apr 2029. 238 of the 244 units on this registration are recorded sold or booked, and 3 of 18 construction stages are filed complete.
At a glance
Project
- NameAssetz Canvas & Cove 2.0 - Block A
- TypeResidential/Group Housing
- Location
- Bengaluru South
- Bengaluru Urban
- 560068
- Pincode560068
- MapView location on Google Maps (as filed on RERA)
- RERA no.PRM/KA/RERA/1251/310/PR/020824/006955
- ReraGenie IDRG-KA-59540
Builder
- NameAPG HABITAT PRIVATE LIMITED
- Entity typeCompany
- CINU70109KA2016PTC093453
- GSTIN29AAOCA4442R1ZV
- Authorized SignatorySomasundaram Thiruppathi
- CeoAkshay Kishore Dewani
- DirectorsSomasundaram Thiruppathi, Jagannath Laxman Shetty, Pankaj Kumar Bajaj
- Project HeadGurumoorthy N
- Other registrations3 more →
Key dates
Key facts
Registration and timeline
- StatusRegistration approved
- Registered on2 Aug 2024
- Promised completion30 Apr 2029
- Revised completionNone
- Buildings1 building record
- Documents filed166 files
Current status
Figures as on 14 Oct 2026, this project's latest RERA Karnataka filing.
Buildings and wings, as sanctioned
| Building | Wing | Floors sanctioned | Habitable floors | Residential units | Other units | Total |
|---|---|---|---|---|---|---|
| Block A | - | - | - | 244 | 0 | 244 |
The full filing
Everything below is from the project's own RERA Karnataka filing, free to read.
Construction progress by building1
As on 14 Oct 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.
3 of 18 construction stages are filed complete. The stage furthest along is Retaining wall (All types), at 95%.
Building: 24% average across the applicable activities
| Activity | Progress |
|---|---|
| Earth work and other leveling preparation work | 100% |
| Foundation footing work | 100% |
| Upto Plinth Level | 100% |
| Sub-structure flooring (Parking Floor, more than one floor below general ground level) | 0% |
| Retaining wall (All types) | 95% |
| RCC or MS Framed structure | 41% |
| Masonry Construction | 0% |
| Plastering inside , outside & Ceiling | 0% |
| Joinery: Doors, Windows, Ventilators etc | 0% |
| Basic work of Water supply, Sanitary and Electrification | 0% |
| Dadoing, Skirting, Flooring, Tiles work (All types) | 0% |
| Railing and Grill fixing | 0% |
| Electrification, Water supply and Sanitary Finishing | 0% |
| Painting | 0% |
| Fire prevention and fire fighting fitting and fixture with network | 0% |
| Weather Proof work(tile,concrete) | 0% |
| Wardrobe, Showcase, Kitchen cabinet, Puja work | Not applicable |
| Elevation work | 0% |
| Internal and External work including landscapes as per sanctioned drawings | 0% |
Progress on shared amenities40
As on 14 Oct 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.
| Common facility | Proposed | Progress |
|---|---|---|
| Water Supply | Yes | 0% |
| Sewage and Drainage System | Yes | 10% |
| Water conservation/rain water harvesting/recharge of ground water | Yes | 55% |
| Energy management | Yes | 0% |
| Fire protection and fire safety requirements | Yes | 0% |
| Solid waste management and disposal | Yes | 0% |
| Emergency Evacuation services | Yes | 0% |
| Internal Roads & Footpaths | Yes | 0% |
| Electricity supply transformer and substation | Yes | 0% |
| Storm water drains | Yes | 60% |
| Use of renewable energy | Yes | 0% |
| Sewage Treatment Plant (STP) | Yes | 75% |
| Parks & Tree planting | Yes | 0% |
| Street Lighting | Yes | 0% |
| Electricity | Yes | 0% |
| Smart Home Automation | No | Not applicable |
| CCTV Surveillance | Yes | 0% |
| Club House | Yes | 0% |
| Community Hall | Yes | 0% |
| Outdoor Sports facility | Yes | 0% |
| Indoor Sports facility | Yes | 0% |
| Swimming Pool | Yes | 0% |
| Gym | Yes | 0% |
| Parks | Yes | 0% |
| Power Backup | Yes | 0% |
| Piped Gas | No | Not applicable |
| Water and Sanitation | Yes | 0% |
| Air Conditioning | Yes | 0% |
| Staircases | Yes | 21% |
| Lifts | Yes | 0% |
| Corridor/Lobbies | Yes | 0% |
| Fire escapes | Yes | 0% |
| Common entrance and exit for the building/common portico/foyer/verandah | Yes | 0% |
| Basement | Yes | 0% |
| Terrace | Yes | 0% |
| Outer Wall | Yes | 0% |
| Open parking areas | Yes | 0% |
| Provision for lodging of management staff and security staff | No | Not applicable |
| Water conservation and renewable energy | Yes | 0% |
| Common storage spaces | Yes | 0% |
Land and ownership5
This page carries no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.
| Landowner | Village | District |
|---|---|---|
| N Arun Kumar | - | - |
| Pankaja | - | - |
| Pradeep Krishnappa | - | - |
| B.S.Somashekar | - | - |
| Ramaiah | - | - |
Project account and cost
70 percent of buyer money must sit in the project account, so check that your agreement for sale names a designated account for this project and pay into that account only.
| Cost line | Estimated | Incurred |
|---|---|---|
| Estimated Cost of Construction as certified by Engineer | Rs 117.66 cr | Rs 34.49 cr |
| Principal sum and interest payable to financial institutions-Non Banking financial institution (NBFC) | Rs 12.56 cr | Rs 12.56 cr |
| On-site expenditure-Site Overhead | Rs 9.70 cr | Rs 7.79 cr |
| Approval | Rs 7.46 cr | Rs 3.00 cr |
| On-site expenditure-Consultants Fees | Rs 2.61 cr | Rs 3.15 cr |
Certifying professionals and partners3
Certificates from these professionals release the promoter's withdrawals from the 70 percent account.
| Role | Name |
|---|---|
| Architect | Kishore Panikkar |
| Engineer | HITEN RAMANLAL MAHIMTURA |
| Chartered Accountant | Y S Shetty & Company |
Complaints filed with RERA Karnataka
No complaints on record against this registration.
Documents filed166
As listed on the registration, under the names the promoter filed them with; the newest 80 of 166 are shown. The files themselves are available at source: search the registration number PRM/KA/RERA/1251/310/PR/020824/006955 on the RERA Karnataka portal. We publish what the filing says and never host the promoter's documents in place of it.
| Document | Uploaded |
|---|---|
| Q2 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form -4 Chartered Accountant - canvas & Cove 2 Block A.pdf | 14 Oct 2026 |
| Q2 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architect (QU) Canvas & Cove 2 0 Block A.pdf | 14 Oct 2026 |
| Q2 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form -6, Engineer (QU) - Canvas & Cove 2 0 - BLOCK A.pdf | 14 Oct 2026 |
| Q2 2026-27 Water supply and sewage board | 14 Oct 2026 |
| Q2 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 14 Oct 2026 |
| Q2 2026-27 KSPCB- MOEF (Above 50 Acres) | 14 Oct 2026 |
| Q2 2026-27 Fire and Safety | 14 Oct 2026 |
| Q2 2026-27 Airport Authority of India | 14 Oct 2026 |
| Q2 2026-27 BSNL/Telecommunication Department | 14 Oct 2026 |
| Q1 2026-27 Form-4 Certificate issued by Chartered AccountantFile: Form -4 Chartered Accountant - canvas & Cove 2 Block A.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-5 Certificate issued by ArchitectFile: Form-5 Architect (QU) Canvas & Cove 2 Block A.pdf | 15 Jul 2026 |
| Q1 2026-27 Form-6 Certificate issued by Structural EngineerFile: Form -6, Engineer (QU) - Canvas & Cove 2 - BLOCK A.pdf | 15 Jul 2026 |
| Q1 2026-27 Water supply and sewage board | 15 Jul 2026 |
| Q1 2026-27 KSPCB- PCB (10 Acres to 125 Acres) | 15 Jul 2026 |
| Q1 2026-27 KSPCB- MOEF (Above 50 Acres) | 15 Jul 2026 |
| Q1 2026-27 Fire and Safety | 15 Jul 2026 |
| Q1 2026-27 Airport Authority of India | 15 Jul 2026 |
| Q1 2026-27 BSNL/Telecommunication Department | 15 Jul 2026 |
| Q4 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form -4 Chartered Accountant - canvas & Cove 2 Block A.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5 Architect (QU) Canvas & Cove 2 Block A.pdf | 15 Apr 2026 |
| Q4 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form -6 Engineer (QU) - Canvas & Cove 2 0 - BLOCK A.pdf | 15 Apr 2026 |
| Q4 2025-26 Water supply and sewage board | 15 Apr 2026 |
| Q4 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 15 Apr 2026 |
| Q4 2025-26 KSPCB- MOEF (Above 50 Acres) | 15 Apr 2026 |
| Q4 2025-26 Fire and Safety | 15 Apr 2026 |
| Q4 2025-26 Airport Authority of India | 15 Apr 2026 |
| Q4 2025-26 BSNL/Telecommunication Department | 15 Apr 2026 |
| Q3 2025-26 Form-4 Certificate issued by Chartered AccountantFile: Form -4 Chartered Accountant - canvas & Cove 2 Block A.pdf | 11 Mar 2026 |
| Q3 2025-26 Form-5 Certificate issued by ArchitectFile: Form-5 Architect (QU) Canvas & Cove 2 Block A.pdf | 11 Mar 2026 |
| Q3 2025-26 Form-6 Certificate issued by Structural EngineerFile: Form 6-Engineer Certificate Assetz Canvas & Cove Block A.pdf | 11 Mar 2026 |
| Q3 2025-26 Water supply and sewage board | 11 Mar 2026 |
| Q3 2025-26 KSPCB- PCB (10 Acres to 125 Acres) | 11 Mar 2026 |
| Q3 2025-26 KSPCB- MOEF (Above 50 Acres) | 11 Mar 2026 |
| Q3 2025-26 Fire and Safety | 11 Mar 2026 |
| Q3 2025-26 Airport Authority of India | 11 Mar 2026 |
| Q3 2025-26 BSNL/Telecommunication Department | 11 Mar 2026 |
| ClarificationFile: Clarifiaction.pdf | 8 Jul 2024 |
| CA CertificateFile: Annexure 1-CA Certificate.pdf | 8 Jul 2024 |
| Bank StatementFile: Annexure 2-Bank Statement.pdf | 8 Jul 2024 |
| Covering LetterFile: Covering Letter.pdf | 28 Jun 2024 |
| Clarification regarding shareholdingsFile: Annexure 1-Clarification regarding shareholdings.pdf | 28 Jun 2024 |
| Sources of Fund with supportingFile: Annexure 2-Sources of Fund with supporting.pdf | 28 Jun 2024 |
| Loan Clarification and Bank StatementFile: Annexure 3-Loan Clarification and Bank Statement.pdf | 28 Jun 2024 |
| 133-1 RTC 2023-24File: Annexure 4-133-1 RTC 2023-24.pdf | 28 Jun 2024 |
| 134-1 RTC 2023-24File: Annexure 5-134-1 RTC 2023-24.pdf | 28 Jun 2024 |
| 134-3 RTC 2023-24File: Annexure 6-134-3 RTC 2023-24.pdf | 28 Jun 2024 |
| Area DetailsFile: Annexure 7-Area Details.pdf | 28 Jun 2024 |
| Clarification regarding FARFile: Annexure 8-Clarification regarding FAR.pdf | 28 Jun 2024 |
| DP OrderFile: Annexure 9-DP Order.pdf | 28 Jun 2024 |
| CDP MapFile: Annexure 10-CDP Map.pdf | 28 Jun 2024 |
| CLUFile: Annexure 11-CLU.pdf | 28 Jun 2024 |
| Approval LetterFile: Annexure 12-Approval Letter.pdf | 28 Jun 2024 |
| Clarification regarding MOEF NOCFile: Annexure 13-Clarification regarding MOEF NOC.pdf | 28 Jun 2024 |
| Clarification regarding KSPCBFile: Annexure 14-Clarification regarding KSPCB.pdf | 28 Jun 2024 |
| Relinquishment DeedFile: Annexure 15 - Relinquishment Deed.pdf | 28 Jun 2024 |
| ZR for BufferFile: Annexure 16-ZR for Buffer.pdf | 28 Jun 2024 |
| Site PlanFile: Annexure 17a-Site Plan.pdf | 28 Jun 2024 |
| Existing Basement PlanFile: Annexure 17b-Existing Basement Plan.pdf | 28 Jun 2024 |
| Existing ground floorFile: Annexure 17c-Existing ground floor.pdf | 28 Jun 2024 |
| First Floor and Second floor PlanFile: Annexure 17d-First Floor and Second floor Plan.pdf | 28 Jun 2024 |
| 3rd floor and typical 4th and 6th floorFile: Annexure 17e-3rd floor and typical 4th and 6th floor.pdf | 28 Jun 2024 |
| 5th floor and 7th floorFile: Annexure 17f-5th floor and 7th floor.pdf | 28 Jun 2024 |
| 8th and 9th floorFile: Annexure 17g-8th and 9th floor.pdf | 28 Jun 2024 |
| 10th and 11th floorFile: Annexure 17h-10th and 11th floor.pdf | 28 Jun 2024 |
| 12th and 13th floorFile: Annexure 17i-12th and 13th floor.pdf | 28 Jun 2024 |
| 12th and 13th floorFile: Annexure 17j-12th and 13th floor.pdf | 28 Jun 2024 |
| 14th and 15th floorFile: Annexure 17k-14th and 15th floor.pdf | 28 Jun 2024 |
| 16th and 17th floorFile: Annexure 17ll-16th and 17th floor.pdf | 28 Jun 2024 |
| 18th and 19th floorFile: Annexure 17m-18th and 19th floor.pdf | 28 Jun 2024 |
| 20th 21st and 23rd floorFile: Annexure 17n-20th 21st and 23rd floor.pdf | 28 Jun 2024 |
| 22nd 24th & 25th FloorFile: Annexure 17o-22nd 24th & 25th Floor.pdf | 28 Jun 2024 |
| 26th and 27th floorFile: Annexure 17p-26th and 27th floor.pdf | 28 Jun 2024 |
| 28th and Terrace floor planFile: Annexure 17q-28th and Terrace floor plan.pdf | 28 Jun 2024 |
| SectionFile: Annexure 17r-Section.pdf | 28 Jun 2024 |
| ElevationFile: Annexure 17s-Elevation.pdf | 28 Jun 2024 |
| BEGUR SENSITIVE ZONE ClearanceFile: Annexure 18-BEGUR SENSITIVE ZONE.pdf | 28 Jun 2024 |
| Self Attested engineer licenceFile: Annexure 19-Self Attested engineer licence.pdf | 28 Jun 2024 |
| Bifarcation construction costFile: Annexure 20-Bifarcation construction cost.pdf | 28 Jun 2024 |
| Allotement letterFile: Annexure 21-Allotement letter.pdf | 28 Jun 2024 |
| ATSFile: Annexure 22-ATS.pdf | 28 Jun 2024 |
Comparing a few projects?
You have opened several on ReraGenie. A free account keeps them in one list with their booking and possession figures, and puts two to six of them side by side.
How this compares with Bengaluru Urban
Computed across the 4,100+ Bengaluru Urban projects on ReraGenie, from their own filings.
Keep Assetz Canvas & Cove 2.0 - Block A on your shortlist
Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.
Other projects near Bengaluru Urban4,100+ in Bengaluru Urban
Filed coordinates, straight-line distance. 27 registered projects within 2 km.
MEMCO SKYLINE - JUTAKU
MEMCO SKYLINE PRIVATE LIMITED
SNN RAJ SERENITY
SNN Builders Private Limited
TVS Emerald Jardin
Emerald Haven Development Limited
CASAGRAND AMOR
CASA GRANDE GARDEN CITY BUILDERS PVT LTD
Assetz Mizumi Reserve Tower A1 A2 A4
APG COMMUNITY DEVELOPMENT PRIVATE LIMITED
Assetz Canvas & Cove 2.0 - Block B & C
APG HABITAT PRIVATE LIMITED
See every Bengaluru Urban project, with the district possession charts
Builder: APG HABITAT PRIVATE LIMITED
APG HABITAT PRIVATE LIMITED has 4 registrations on RERA Karnataka, including Assetz Canvas & Cove 2.0 - Block A and Assetz Canvas & Cove 2.0 - Block B & C. Its filings disclose no earlier RERA Karnataka projects. Read the full track record. See more projects on the Bengaluru Urban district page.
Frequently asked questions
What are my rights if Assetz Canvas & Cove 2.0 - Block A is delayed beyond 30 Apr 2029?
Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, at the rate the state's RERA rules prescribe, or exit and claim a full refund with interest. Claims are filed as complaints with RERA Karnataka.
How do I verify and contact the developer of Assetz Canvas & Cove 2.0 - Block A?
The registered promoter entity is APG HABITAT PRIVATE LIMITED, a company as per the filing. Its CIN U70109KA2016PTC093453 and GSTIN 29AAOCA4442R1ZV can be cross-checked on the MCA and GST portals. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's RERA Karnataka listing and in its filed documents.
Is my payment protected in Assetz Canvas & Cove 2.0 - Block A?
Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.
Who certifies construction progress at Assetz Canvas & Cove 2.0 - Block A?
The professionals named in the filing: Architect: Kishore Panikkar; Engineer: HITEN RAMANLAL MAHIMTURA; Chartered Accountant: Y S Shetty & Company. Their certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.
What should I check before booking in Assetz Canvas & Cove 2.0 - Block A?
Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area; that the agreement follows the model agreement under the state's RERA rules, with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters.
Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on RERA Karnataka, and we read every report.
Report an error Share feedback