Home / Browse projects / Mumbai Suburban, Maharashtra / ASHTHA SHARON DAHISAR WEST

Registered No litigation declared Residential / Group Housing project

ASHTHA SHARON DAHISAR WEST

By Indo Build Enterprise

RG-MH-06023 · RERA P51800055708 · Last updated on MahaRERA portal: 28 May 2026

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • No encumbrance on the project land
  • Separate project account declared
  • Allotment letter follows the model form
  • All 1 earlier projects delivered on promise

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 2 other registrations.

See what the report covers Free either way: or have every new Mumbai Suburban registration emailed to you, free during the pilot beta.
Dec 2026Possession promisedno revision filed
10 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 96%
96 of 96Units unsoldnot recorded sold or booked
0Complaints at MahaRERAon this registration
Jump to the 68 documents Report an error

ASHTHA SHARON DAHISAR WEST is a Residential / Group Housing project by Indo Build Enterprise in Mumbai Suburban, Maharashtra, registered with MahaRERA as P51800055708 on 15 Apr 2024. Possession is promised by 31 Dec 2026. 0 of the 96 units on this registration are recorded sold or booked, and 10 of 22 construction stages are filed complete.

At a glance

Project

  • NameASHTHA SHARON DAHISAR WEST
  • TypeResidential / Group Housing
  • Location
    • L M MHATRE
    • KANDARPADA DAHISAR WEST
    • Madpeshwar
    • Borivali
    • Mumbai Suburban
    • 400068
  • Pincode400068
  • RERA no.P51800055708
  • ReraGenie IDRG-MH-06023

Builder

  • NameIndo Build Enterprise
  • Entity typeOthers
  • Named personVrujlal Kanjibhai Vaishnani
  • Other registrations2 more →
  • Declared earlier projects1 →

Key dates

this monthRegisteredApr 2024PromisedDec 2026

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on15 Apr 2024
  • Promised completion31 Dec 2026
  • Revised completionNone
  • Buildings2 building records
  • Documents filed68 files

Current status

0%0 of 96 units booked
66.8%Work done, per cost certificate

Figures as on 28 May 2026, this project's latest MahaRERA filing.

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
ASHTHA SHARON WING ANA232036036
ASHTHA SHARON WING BNA252160060

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 28 May 2026, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

10 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 96%.

ASHTHA SHARON WING A66%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure96%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
ASHTHA SHARON WING B66%
ActivityProgress
Excavation100%
Basement (if any)100%
Podiums (if any)100%
Plinth100%
Stilt Floor100%
Slabs of Super Structure96%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises60%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks30%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.40%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 28 May 2026, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes0%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsYes0%
Landscaping & Tree PlantingNoNot applicable
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalYes0%
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsYes0%
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed4

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots4
Closed/Covered4
BuildingClosed/CoveredTotal
ASHTHA SHARON WING A22
ASHTHA SHARON WING B22

Land and ownership1

MahaRERA does not publish landowner contact details. Declared none is the promoter's own declaration to the regulator, not a title search. A search at the sub-registrar is what confirms it.

Land area648 sq m
Land owned byThe promoter, with other names on the file
Named landowners1
Encumbrance on the landDeclared none
CERSAI search filedYes
Declared on22 Dec 2025
LandownerVillageDistrict
Sonal ConstructionsMadpeshwarMumbai Suburban

Approvals and building plan

Sanctioning authoritySlum Rehabilitation Authority (SRA)
Permissible FSI3522.61
Proposed, not sanctioned3,300 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchShop no 1 Ground floor Sugra Heritage CHSL M G ROAD Kandivali West Mumbai 400067
Estimated costRs 4.20 cr
Cost incurredRs 2.80 cr
Work done66.78%
BuildingWingEstimatedIncurred
ASHTHA SHARON WING ANARs 2.10 crRs 1.40 cr
ASHTHA SHARON WING BNARs 2.10 crRs 1.40 cr

Certifying professionals and partners8

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectMr Vrujlal K Vaishnani of Indobuild Designs Pvt Ltd
ArchitectIndobuild Designs Pvt Ltd
EngineerMr Vrujlal K Vaishnani
EngineerPragnesh Oza
Chartered AccountantG T Karnani
Chartered AccountantHaresh Kothari
Chartered AccountantHaresh P Kothari
Chartered AccountantGURBUX & CO
PartnerRole in project
Indo Build Enterprise-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 12 Jun 2023
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 12 Jun 2023
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 20 Mar 2024
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 22 Mar 2025Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 31 Dec 2026

Documents filed68

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Withdrawal Update Form 1File: FORM 1 JAN TO MARCH 2026.pdf28 May 2026
Withdrawal Update Form 2File: FORM 2 JAN TO MARCH 2026.pdf28 May 2026
Withdrawal Update Form 3File: FORM 3 JAN TO MARCH 2026.pdf28 May 2026
Withdrawal Update Form 1File: Form1 Upto June 2025.pdf20 Jan 2026
Withdrawal Update Form 1File: Form1 Upto Sep 2025.pdf20 Jan 2026
Withdrawal Update Form 1File: Form1 Upto Sep 2025.pdf20 Jan 2026
Withdrawal Update Form 1File: Form1 Upto Sep 2025.pdf20 Jan 2026
Withdrawal Update Form 1File: Form1 Upto Sep 2025.pdf20 Jan 2026
Withdrawal Update Form 1File: Form1 OCT TO DEC 2025.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2 UPTO DEC 2025.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2 UPTO SEP 2025.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2 UPTO SEP 2025.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2 UPTO SEP 2025.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2 UPTO SEP 2025.pdf20 Jan 2026
Withdrawal Update Form 2File: Form 2 UPTO DEC 2025.pdf20 Jan 2026
Withdrawal Update Form 3File: Form3 upto june 2025.pdf20 Jan 2026
Withdrawal Update Form 3File: Form3 upto sep 2025.pdf20 Jan 2026
Withdrawal Update Form 3File: Form3 upto sep 2025.pdf20 Jan 2026
Withdrawal Update Form 3File: Form3 upto sep 2025.pdf20 Jan 2026
Withdrawal Update Form 3File: Form3 upto sep 2025.pdf20 Jan 2026
Withdrawal Update Form 3File: Form3 OCT TO DEC 2025.pdf20 Jan 2026
Form 1File: Form1 upto june 2024.pdf26 Dec 2025
Form 2File: Form 2 upto june 2024.pdf26 Dec 2025
Form 3File: FORM 3 JUNE 2024.pdf26 Dec 2025
Disclosure of Sold and Booked InventoryFile: UPTO JUNE 2024.pdf26 Dec 2025
Form 1File: Form1 Upto Sep 2024.pdf26 Dec 2025
Form 2File: Form 2 upto SEP 2024.pdf26 Dec 2025
Disclosure of Sold and Booked InventoryFile: UPTO SEP 2024.pdf26 Dec 2025
Form 3File: FORM 3 SEP 2024.pdf26 Dec 2025
Form 3File: FORM 3 DEC 2024.pdf26 Dec 2025
Form 1File: Form1 Upto dec 2024.pdf26 Dec 2025
Form 2File: Form 2 upto DEC 2024.pdf26 Dec 2025
Disclosure of Sold and Booked InventoryFile: UPTO DEC 2024.pdf26 Dec 2025
Disclosure of Sold and Booked InventoryFile: UPTO MARCH 2025.pdf26 Dec 2025
Form 1File: Form1 Upto Mar 2025.pdf26 Dec 2025
Form 2File: Form 2 upto MARCH 2025.pdf26 Dec 2025
Form 3File: FORM 3 MARCH 2025.pdf26 Dec 2025
Commencement Certificates / NA Order for plotted developmentFile: CTS 8 CC - 28-06-2024.pdf22 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CTS 8 FORM 3 APRIL TO JUNE 24.pdf3 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CTS 8 FORM 3 JULY TO SEP 24.pdf3 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: CTS 8 FORM 3 OCT TO DEC.pdf3 Mar 2025
CA Certificate on Project Cost & Fund withdrawal (Form 3)File: FORM 3.pdf6 Apr 2024
Building plan approvalFile: 01 TO 03.pdf20 Mar 2024
Building plan approvalFile: 04 N 05.pdf20 Mar 2024
Building plan approvalFile: 06.pdf20 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 01 TO 03.pdf20 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 04 N 05.pdf20 Mar 2024
Building Plan Approval / NA Order for plotted developmentFile: 06.pdf20 Mar 2024
Commencement Certificates / NA Order for plotted developmentFile: CC AUTHENTICATION MAIL FROM SRA.pdf20 Mar 2024
PAN CardFile: CTS - 8 Declaration.pdf21 Jul 2023
Details of encumbrances concerned to FinanceFile: CTS - 8 No Any Encumbrances of finance Letter.pdf21 Jul 2023
Details of encumbrances concerned to FinanceFile: 4 Details of encumbrances to legal.pdf21 Jul 2023
Details of encumbrances concerned to LegalFile: CTS - 8 No Any Encumbrances of finance Letter.pdf21 Jul 2023
Details of encumbrances concerned to LegalFile: 4 Details of encumbrances to legal.pdf21 Jul 2023
CERSAI detailsFile: CTS - 8 cersai.pdf21 Jul 2023
Proforma of Agreement for saleFile: Agreement for sale.pdf21 Jul 2023
Deviation Report with respect to Allotment letterFile: CTS -8 No Daviation Performa of Allotment Letter.pdf21 Jul 2023
Deviation Report with respect to model copy of AgreementFile: CTS -8 No Daviation Performa letter.pdf21 Jul 2023
Layout approvalFile: 5 copy of layout approval letter.pdf12 Jun 2023
PAN CardFile: 1 vkv pan card.pdf12 Jun 2023
Copy of the legal title reportFile: 2 Legal Title report.pdf12 Jun 2023
Copy of Layout Approval (in case of layout)File: 5 copy of layout approval letter.pdf12 Jun 2023
Commencement Certificates / NA Order for plotted developmentFile: 7 SRA CTS 8 Plinth CC.pdf12 Jun 2023
Declaration about Commencement CertificateFile: 8 Declaration about commencement certificate.pdf12 Jun 2023
Declaration in FORM BFile: Form B_compressed.pdf12 Jun 2023
Disclosure of Interest in Other Real Estate OrganizationsFile: 18 Disclosure of interest.pdf12 Jun 2023
Proforma of Allotment letterFile: 24 Proforma of allotement letter.pdf12 Jun 2023
Separate Bank Account details including no encumbrances on the Bank Account or no escrow on the sameFile: 34 Format - A (Declaration About Seperate Bank Account).pdf12 Jun 2023

Promoter's earlier projects1

As disclosed by the promoter in this filing. Where a row names its RERA number, the project links to its own page and the location and registration date are read from that registration.

1 delivered on promise
ProjectLocationFlatsStatusPromisedDelivered
ASHTHA GOREGAON WESTROAD NO 16 JAWAHAR NAGAR NEAR SUVIDHA HOSPITAL GOREGAON WEST MUMBAI - 400 104122CompletedDec 2023Nov 2021

How this compares with Mumbai Suburban

0%of this project is bookeddistrict median 30%
33%of Mumbai Suburban projects moved their completion datethis one has not
21%of Mumbai Suburban registrations have lapsed or been cancelledthis one is on the register

Computed across the 6,700+ Mumbai Suburban projects on ReraGenie, from their own filings.

Free monthly report: Mumbai on MahaRERA, month by month. What registered each month, this city against the other six, the possession pipeline and the pincode micro-markets, from these same filings.

Keep ASHTHA SHARON DAHISAR WEST on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KANDARPADA DAHISAR WEST6,700+ in Mumbai Suburban

Builder: Indo Build Enterprise

Indo Build Enterprise has 3 registrations on MahaRERA, including Ashtha Buoyancy - IBTC Borivali East and ASHTHA SHARON DAHISAR WEST. Its filings disclose 1 earlier MahaRERA project: declares 1 of 1 past projects completed on time. Read the full track record. See more projects on the Mumbai Suburban district page.

Frequently asked questions

What are my rights if ASHTHA SHARON DAHISAR WEST is delayed beyond 31 Dec 2026?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ASHTHA SHARON DAHISAR WEST?

The registered promoter entity is Indo Build Enterprise, an others as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ASHTHA SHARON DAHISAR WEST?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ASHTHA SHARON DAHISAR WEST?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ASHTHA SHARON DAHISAR WEST?

The professionals named in the filing: Architect: Mr Vrujlal K Vaishnani of Indobuild Designs Pvt Ltd; Architect: Indobuild Designs Pvt Ltd; Engineer: Mr Vrujlal K Vaishnani; Engineer: Pragnesh Oza; Chartered Accountant: G T Karnani; Chartered Accountant: Haresh Kothari. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ASHTHA SHARON DAHISAR WEST?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ASHTHA SHARON DAHISAR WEST. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ASHTHA SHARON DAHISAR WEST to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.