Home / Browse projects / Satara, Maharashtra / ASHOK VIHAR

Registered No litigation declared Residential / Group Housing project

ASHOK VIHAR

By RENOVISION CONSTRUCTION

RG-MH-68289 · RERA P52700019493 · Last updated on MahaRERA portal: 15 Mar 2025

Source: official MahaRERA filing

Red flags

  • No red flags in this filing

Clear

  • No litigation declared
  • No complaints on record
  • Completion date never moved
  • Separate project account declared
  • Allotment letter follows the model form

Nothing adverse is on this record. The buyer report still reads the filed documents themselves, and places this filing against the promoter's 1 other registration.

See what the report covers Free either way: or have every new Satara registration emailed to you, free during the pilot beta.
Dec 2028Possession promisedno revision filed
2 of 22Construction stages doneacross 2 buildings; furthest along: Slabs of Super Structure, 95%
0Complaints at MahaRERAon this registration
Jump to the 35 documents Report an error

ASHOK VIHAR is a Residential / Group Housing project by RENOVISION CONSTRUCTION in Satara, Maharashtra, registered with MahaRERA as P52700019493 on 6 Feb 2019. Possession is promised by 30 Dec 2028.

At a glance

Project

  • NameASHOK VIHAR
  • TypeResidential / Group Housing
  • Location
    • SANCTION ROAD
    • KODOLI
    • Kodoli (CT)
    • Satara
    • 415004
  • Pincode415004
  • RERA no.P52700019493
  • ReraGenie IDRG-MH-68289

Builder

  • NameRENOVISION CONSTRUCTION
  • Entity typePartnership
  • PartnersVISHAL SAMBHAJIRAO KADAM, VIKRAM GANPATRAO BARGE
  • Other registrations1 more →
  • No longer live1 lapsed, de-registered or revoked

Key dates

this monthRegisteredFeb 2019PromisedDec 2028

Key facts

Registration and timeline

  • StatusRegistered
  • Registered on6 Feb 2019
  • Promised completion30 Dec 2028
  • Revised completionNone
  • Buildings2 building records
  • Documents filed35 files

Buildings and wings, as sanctioned

BuildingWingFloors sanctionedHabitable floorsResidential unitsOther unitsTotal
WING ANA00000
WING BNA50000

The full filing

Everything below is from the project's own MahaRERA filing, free to read. The Rs 499 buyer report reads the filed documents themselves and puts the findings in plain language.

Construction progress by building2

As on 15 Mar 2025, the date of the latest filing. The RERA activity checklist for each building, from the promoter's latest quarterly progress filing. These are the promoter's own figures, not an independent inspection.

2 of 22 construction stages are filed complete across 2 buildings. The stage furthest along is Slabs of Super Structure, at 95%.

WING A0%
ActivityProgress
Excavation0%
Basement (if any)0%
Podiums (if any)0%
Plinth0%
Stilt Floor0%
Slabs of Super Structure0%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises0%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks0%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%
WING B55%
ActivityProgress
Excavation100%
Basement (if any)90%
Podiums (if any)0%
Plinth90%
Stilt Floor100%
Slabs of Super Structure95%
Internal walls, Intemal Plaster, Floorings, Floors and windows within Flats/Premises50%
Sanitary Fittings within the flats / premises0%
Staircases, Lifts Wells and Lobbies at each Floor level Overhead and Underground Water Tanks80%
External plumbing and external plaster, elevation, completion of terraces with waterproofing of the Building / wing.0%
Installation of Lifts, water pumps, Fire Fighting Fittings and Equipment as per CFO NOC, Electrical fittings, mechanical equipment, compliance to conditions ofenvironment/CRZ NOC, Finishing to entrance lobby/s, plinth protection. paving of areas appurtenant to Building/Wing, Compound Wall and all other requirements as may be required to complete project as per specifications in agreement of Sale.0%

Progress on shared amenities15

As on 15 Mar 2025, the date of the latest filing. Lifts, roads, water and the other shared works, from the same quarterly filing, and reported by the promoter rather than inspected.

Common facilityProposedProgress
Internal Roads & FootpathsNoNot applicable
Water SupplyYes40%
Sewerage (Chamber, Lines, Septic Tank , STP)Yes0%
Storm Water DrainsNoNot applicable
Landscaping & Tree PlantingYes0%
Street LightingNoNot applicable
Community BuildingsNoNot applicable
Treatment And Disposal Of Sewage And Sullage WaterNoNot applicable
Solid Waste Management And DisposalNoNot applicable
Water conservation /Rain water harvestingYes0%
Energy managemcntNoNot applicable
Fire protection and fire safety requirementsNoNot applicable
Electrical meter room, sub-station, receiving stationYes0%
Aggregate area of recreational Open SpaceNoNot applicable
Open ParkingNoNot applicable

Parking filed1

Slots recorded per building wing in the filing. MahaRERA does not publish a two wheeler or four wheeler split, visitor parking, or the sanctioned allotment, so this is provision as filed and not a comparison against the approved plan.

Total parking slots1
Closed/Covered1

Land and ownership4

MahaRERA does not publish landowner contact details. MahaRERA has published no encumbrance declaration for this project. That is silence on the question, and not a record of clear land.

Land area2,000 sq m
Land owned byThe promoter, with other names on the file
Named landowners4
LandownerVillageDistrict
SHIMATI MANGAL ASHOK TANGADEKodoli (CT)Satara
SOU MANISHA SANJAY MOREKarandwadiSatara
SOU MEGHA RAVINDRA KADAMShendreSatara
SAGAR ASHOK TANGADEKodoli (CT)Satara

Approvals and building plan

Permissible FSI2544.59
Proposed, not sanctioned2,545 sq m
Buildings approved2
Buildings sanctioned2

Project account and cost

70 percent of buyer money must sit in the project account. Account numbers are not published by MahaRERA, so check that your agreement for sale names a designated account for this project and pay into that account only.

Separate project accountDeclared
Bank branchPOVAI NAKA SATARA

Certifying professionals and partners3

Form 1, 2 and 3 certificates from these professionals release the promoter's withdrawals from the 70 percent account.

RoleName
ArchitectPURUSHOTTAM B PATIL
EngineerSURAJ PARAMANE
Chartered AccountantCA ANAND V SHAHA
PartnerRole in project
RENOVISION CONSTRUCTION-

Complaints filed with MahaRERA

No complaints on record against this registration.

The permission chain

The permissions a project needs, in the order they happen, matched to MahaRERA's own document slots. A slot on the file means the promoter uploaded a document there; it is not proof the permission was granted, and the filing carries no issue dates. An empty slot is not proof an approval is missing.

  1. Legal title reportOn the file

    A lawyer's report on who owns the land and what is registered against it.

    uploaded 23 Jan 2019
  2. Layout approvalOn the file

    The planning authority's approval of how the plots and buildings sit on the land.

    uploaded 23 Jan 2019
  3. Building plan approvalOn the file

    Sanction of the building plans themselves, filed as an IOD in Mumbai and as a plan approval elsewhere.

    uploaded 23 Jan 2019
  4. Commencement CertificateOn the file

    Permission to begin construction. On a plotted development the same slot carries the NA order instead.

    uploaded 23 Jan 2019Confirm the Commencement Certificate covers the specific floor you are buying.
  5. Occupancy CertificateNot due yet

    The legal go-ahead to move in. It comes at the end, so its absence on a project still under construction is expected.

    possession is promised for 30 Dec 2028

Documents filed35

As listed on the registration, named by the MahaRERA slot each file was filed under, with the promoter's own file name beneath. The files themselves are available at source: open this registration on the MahaRERA portal. We publish what the filing says and never host the promoter's documents in place of it.

DocumentUploaded
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arch form no 1.PDF15 Mar 2025
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: engg form 2.PDF15 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2020-21)File: engg form 2a 20-21.PDF15 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2021-22)File: FORM NO 5 21-22.PDF15 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2021-22)File: engg form 2a 21-22.PDF15 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2022-23)File: engg form 2a 22-23.PDF15 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2022-23)File: FORM NO 5 22-23.PDF15 Mar 2025
Engineers Certificate on Quality Assurance (Form 2A FY 2023-24)File: FORM NO 5 23-24.PDF15 Mar 2025
Annual Audit Report of Statutory CA (Form 5) (FY 2023-24)File: FORM NO 5 23-24.PDF15 Mar 2025
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: arch.pdf20 Oct 2023
Architect’s Certificate of Percentage of Completion of Work (Form 1)File: ARCH.pdf7 Jan 2022
Engineer’s Certificate on Cost Incurred on Project (Form 2)File: ENG.pdf7 Jan 2022
Certificates of CA (Form 3)File: ASHOK CA 3.pdf7 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2019-20)File: FORM 5 19-20.PDF7 Jan 2022
Annual Audit Report of Statutory CA (Form 5) (FY 2020-21)File: FORM 5 20-21.PDF7 Jan 2022
Status of ConveyanceFile: MONALI YADHAV.pdf5 Mar 2021
Status of ConveyanceFile: S S NALWADE.pdf5 Mar 2021
Status of ConveyanceFile: R P GAIKWAD.pdf5 Mar 2021
Status of ConveyanceFile: NILESH KADAM.pdf26 Aug 2019
Proforma of Allotment letterFile: AGREEMENT FOR SALE.pdf8 Aug 2019
Form 2AFile: form 2a.pdf11 Jul 2019
Certificates of CA (Form 5)File: form5.pdf11 Jul 2019
Layout approvalFile: LAYOUT.pdf23 Jan 2019
Building plan approvalFile: PLAN1.pdf23 Jan 2019
Building plan approvalFile: PLAN2.pdf23 Jan 2019
PAN CardFile: pan card.pdf23 Jan 2019
Copy of the legal title reportFile: search.pdf23 Jan 2019
Details of encumbrancesFile: img082.pdf23 Jan 2019
Copy of Layout Approval (in case of layout)File: LAYOUT.pdf23 Jan 2019
Building Plan Approval (IOD)File: PLAN1.pdf23 Jan 2019
Building Plan Approval (IOD)File: PLAN2.pdf23 Jan 2019
Commencement Certificates / NA Order for plotted developmentFile: bankam parwana.pdf23 Jan 2019
Declaration in FORM BFile: sch b.pdf23 Jan 2019
Certificates of CA (Form 3)File: ca.pdf23 Jan 2019
Proforma of Allotment letterFile: rera agriment.pdf23 Jan 2019

How this compares with Satara

16%of Satara projects moved their completion datethis one has not
35%of Satara registrations have lapsed or been cancelledthis one is on the register

Computed across the 1,100+ Satara projects on ReraGenie, from their own filings.

Keep ASHOK VIHAR on your shortlist

Saving puts this project on your dashboard with its booking and possession figures, ready to place side by side with up to five others. A free account also gets our weekly market digest by email.

How alerts work

Other projects near KODOLI1,100+ in Satara

Builder: RENOVISION CONSTRUCTION

RENOVISION CONSTRUCTION has 2 registrations on MahaRERA, including ASHOK VIHAR and PRUTHVI RESIDENCY. Its filings disclose no earlier MahaRERA projects. Read the full track record. See more projects on the Satara district page.

Frequently asked questions

What are my rights if ASHOK VIHAR is delayed beyond 30 Dec 2028?

Under section 18 of the RERA Act you may stay in the project and claim interest for every month of delay, or exit and claim a full refund with interest. In Maharashtra the rate is SBI's highest MCLR plus 2 percent, currently 10.90% per annum (June 2026). The free delay interest calculator on ReraGenie puts a rupee figure on any delay. Claims are filed as MahaRERA complaints with a Rs 5,000 fee.

How do I verify and contact the developer of ASHOK VIHAR?

The registered promoter entity is RENOVISION CONSTRUCTION, a partnership as per the filing. Neither this filing nor this promoter's other MahaRERA registrations disclose a CIN, LLPIN or GSTIN for this entity. Your agreement for sale must name this exact entity, not a group brand name. The promoter's registered address and contact details are on the project's MahaRERA listing (scan the QR code on any advertisement) and in its filed documents. The Rs 499 buyer report includes all of them as a single ZIP, foldered by type.

Is my payment protected in ASHOK VIHAR?

Partly, by law. 70 percent of every buyer payment must go into the project's designated bank account, withdrawable only against architect, engineer and CA certificates as construction progresses; since July 2024 MahaRERA requires a three-account structure for collections. Separately, a promoter cannot take more than 10 percent of the price before signing a registered agreement for sale (section 13). Neither rule guarantees completion; they limit how far your money can travel from the project.

How current is the construction progress shown for ASHOK VIHAR?

Promoters must file a quarterly progress report within 20 days of each quarter end, certified by the architect (Form 1), engineer (Form 2) and chartered accountant (Form 3). The figures above come from the latest filing, so they can trail the site by up to a quarter. A promoter who stops filing QPRs altogether invites penalties under section 61, and a stale filing date is itself a warning sign worth checking on the portal.

Who certifies construction progress at ASHOK VIHAR?

The professionals named in the filing: Architect: PURUSHOTTAM B PATIL; Engineer: SURAJ PARAMANE; Chartered Accountant: CA ANAND V SHAHA. Their Form 1 (architect), Form 2 (engineer) and Form 3 (chartered accountant) certificates are what unlock the promoter's withdrawals from the 70 percent account, so their names on record are part of the project's accountability chain.

What should I check before booking in ASHOK VIHAR?

Four things this page cannot decide for you: that the carpet area in your agreement matches the filed carpet area (the model agreement allows only a 3 percent variation, with a refund right below that); that the agreement follows MahaRERA's model clauses with deviations highlighted; the promoter's record on their other projects, not just this one; whether construction progress keeps pace with sales in the coming quarters. The Rs 499 buyer report works through all of them from the filings.

Read the whole filing and still not sure? That is what the Rs 499 buyer report is for: the conditions on this record read one by one, the progress against the promise, this promoter's other registrations, what the filed documents themselves say, and a ZIP of every document on the filing. It carries the Rs 299 project watch free for 90 days.

Get the buyer report · Rs 499 See a real one first

Studying this micro-market rather than buying a flat? The developer project analysis, Rs 2,999, maps every registration within 5 km from filed coordinates, reads what this market absorbs, prices the parcel and takes the promoter's whole book apart. See a complete sample.

Spotted something wrong on this page, or want to tell us what would make it more useful? Every page here is built from what the promoter filed on MahaRERA, and we read every report.

Report an error Share feedback

Report an error or share feedback

About ASHOK VIHAR. Everything on this page comes from what the promoter filed on MahaRERA, so if a fact looks wrong it helps to say which one.

We read every report. We cannot promise a reply to each one.

Save ASHOK VIHAR to a free account

It takes a minute, there is no card, and everything on this page stays free to read either way.

Create a free accountI already have one

We will save this project for you as soon as you are in.